Document RJoJO50od0DnRgR2rG01jjBG8

DownloadRandom document
GIST meeting notes August 12,2002 AR226-2592 Minutes from the GIST meeting August 12,2002 The meeting began at approximately 9:10 am. in the Division of Water Resources' conference room at 1201 Greenbrier St., Charleston, WY. Attending were Dave Wafldns, George Dasher, and Don Criss of the Division of Water Resources (DWR), Bill Toomey for the Bureau for Public Health, Steve Williams and Sara Wallace of the Ohio EPA, and Andrew Hartten representing DuPont. Roger Rdnhart and Garth Connor of the US EPA Region III were linked in by conference call. The meeting began with a discussion of water sampling in the 2 mile radius area of West Virginia. Andrew Hartten stated that 667 homes had been contacted. Andrew Hartten noted that more people turned down, offers to sample water in this two mile radius area. Results of the survey work at the Washington Works, Local landfill, Dry Run landfill, and Letart areas were discussed. Results of re-sampled sites were also discussed. All of these results are presented in the "Two-Mile Radius and C-8 Sampling Report" and the "One-Mile Radius; and C-8 Sampling Report". Dave Watldns asked Roger Reinhart about the status of the Denver lab. Roger Reinhart replied that 17 analyses were done and that a report would be forthcoming in the next few weeks. Some Ohio samples were split Andrew Hartten asked Roger Reinhart if there were any comparisons made, and Roger replied that none were done yet. Bill Toomey asked Roger Remhart iftfae Denver lab was using the same procedure, and Roger replied that they were and that Exygen had collaborated in the exchange of information, Dave Watkins said that no splits had been run yet of the WV samplesand asked Sara Wallace of the Ohio EPA if the Ohio EPA would share data. Sara Wallace answered yes. It was noted that concentrations of C-8 in groundwater were somewhat elevated in samples taken at higher elevations such as ridge tops, Ohio sampling results within the one mile radius were discussed. Three hundred sixty one homes were contacted for this sampling. Garth Connor asked if concentrations of C-8 had gone down after me new air scubber system had been installed. Andrew Hartten said tibat preliminary reports indicate a reduction of up to 90%, md it is expected that the concentrations will decrease more in the future. Air modeling is also planned in me fature. After a short break, sampling results from West Virginia and Ohio public service dis&icts were discussed. Little Hocking, Tapper Plains, aad Lubeck PSD's will continue to be sampled on a quarterly basis. Bill Toomey asked if villages downstream needed more sampling in light of results showing increased concentration of C-8 at the Letart outfalls. Sara Wallace replied not al Ihis rime. George Dasher and Dave Watidns asked Andrew Hartten to assess why these concentrations were increasing. Dave Watkins stated the need to establish a surface water quality standard. It was not certain if Dr. Staats is working on this. ASH027881 EID781161 EID781161 .J GIST meeting notes August 12,2002 Ohio River sampling results were discussed. New information was presented. It was asked if more Ohio River samplingshould be taken, Steve Williams, Sara Wallace, and Dave Watfdns asked for more samples to be taken close to shore at the Washington Works area. Roger Reirihart said that he would support the conclusions of the group, D,ave Watldns said that no more sampling of private water supplies wiU be necessary in West Virginia. Bill Toomey said he would confer wim the DHHR and get lack with the group as to wbetfier the DHHR would want more samples taken. Andrew Hartten said that DuPont will continue to sample the Lubek PSD to see if measures taken have been effective. Lunch break taken. Roger Reinhart and Garth Connor exited the conference call at this time. At 1:00 pm., the meeting resumed. Monitoring well locations and plume identification were discussed. Monitoring well installation at Letart was expected to be completed wilhia the next two weeks. Dry Run monitoring wells had berih completed as of last week, Andrew Hartten discussed the status of modeling efforts. EPA Region ffl, the Army Corps, of Engineers, and the USGS will schedule a meeting in three to four weeks to further discuss modeling efforts. The Army Corps, of Engineers had offered some comments on the URS model, and these comments were being considered. Andrew Hartten men discussed subsurface geometry under the Ohio River and characteristics of me alluvium. A model of groundwater migration from DuPont to Little Hocking was presented. This model showed me oone of depression from pumping DuPont's wells extended under me Ohio River. Andrew Hartten concluded that there was no chance of transport ofC- under the Ohio River. Andrew stated that much time had been spent in calibrating this model, giving high confidence in the model. The meeting was concluded after a discussion of the next steps to be taken. A final report should be ready by me end of December 2002. A next meeting will be scheduled for mid November 2002, with a tentative date of November 13,2002 set The meeting adjourned at 2:00 pm. ASH027882 EID781162 EID781162