Document RJboq0Dd1JLVVN3nJOyYBYxmB
conoco
Interoffice Communication
To : R. E. Lehmkuhl
From
: G. G. Draper
Date Subject
: July 27, 1978
t
: ABERDEEN WEEKLY PROGRESS REPORT
PRODUCTION SUMMARY (MM LBS.) Week of 7/19 thru 7/25 Week #29
Actual Production
1978 Weekly Average
Monthly Cumulative Thru 7/25/78
1978 Year-to-Date
1978 Previous
Month
Resin Off-Grade
Plasticizer Dry Blend Compound
Off-Grade
SAFETY ::f
5.19 3.1%
.28
1.48 .70
0%
4.66 2.1%
.20 .86 .80 3%
20.00
5.9% .76
4.88
2.93 2.1%
135-21 2.8%
5.87 24.92
23.13 3%
25.34
1.9% .87
4.14
3.83 6.5%
There were no injuries recorded for the reporting period.
VINYL UNIT
Rate at 74l M lbs. per day at 9&-9% customer grade. Made 123 batches of 5465, 5425, and 5385. Open warehouse space is now approximately 17.5 MM pounds.
Reactor Stream Factor: 91%
Dryer Stream Factor:
86%
The major items affecting productivity for the week were low reactor and dryer stream factors. Items affecting the reactor stream factor were reactor downtime to:
1. Clean the D-400 condenser on 7/22 and 7/23 and to replace the D-500 agitator seal on 7/24 (52 hours total).
2. Repair the main evacuation valve in the old module (22 hours total on 7/20).
Reactor productivity was also impaired due to an initiator reduction required to maintain isothermal operation in both modules.
Items limiting dryer stream factor were:
1. Repair of No. 2 sifter motor on 7/23.
2. Centrifuge plugging problems with No. 7 dryer on 7/22.
3. Activator problems with dryers 1 and 2 on 7/24 and 7/25.
DTH 000050919
R. E. Lehmkuhl Aberdeen Weekly Progress Report July 27, 1978 Page 2
VINYL UNIT (cont.d)
M Pounds
Resin Produced Compound/Dry Blend Usage Bagged Resin Shipments Resin Inventory:
Packaged Bulk Loaded Cars TOTAL
5,186 1,802
315 5,077
5,4l4 2,853 2,110 10,377
COMPOUND UNIT
Line I operated 5 days averaging 52 M pounds per day. Rates during the week were affected "by color dispersion problems encountered in profile compounds requiring Mupco F-5960 color. Samples of the color have been taken to the laboratory for further testing.
Line III operated 5 days averaging 107 M pounds per day. Production during the week included a 40 M run of 34533 Natural for Packard Electric. Rates were low due to mechanical failures of the "A" prefeeder and the compound dicers.
Compound Inventory
M Pounds
Packaged Bulk Loaded Cars "BC" "h" Mill Scrap
6,047
395 340 498
121 8
Dry Blend averaged 212 M pounds per day producing 80172-B and 80273-G dry blends. Dry Blend operated without the #2 Welex unit for a period of 48 hours due to a motor failure.
Dry Blend Inventory
M Pounds
Packaged Bulk Loaded Cars
109 373 180
Plasticizer operated 4 days during the week averaging 71 M pounds per day.
G. G. Draper ^ c: HRF, TGS, CLS, CEZ, DARLENE HOWELL - HOUSTON
ELK, CRM, JEB, RGG, LHB, MJD, DEM, RBM, JCC, GDB, JES - ABERDEEN
DTH 000050920