Document RJXw8qYdLvnbjBGdBv5Y31knk

^233 ELANESE CHEMICAL COMPANY. INC. PLAINTIFF'S EXHIBIT CEL-796 C^EMCE'. PLANT Mr. Bill Stewart, P. E. Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723 JJF-133-82 October 14, 1982 CERTIFIED MAIL 5381526 Dear Mr. Stewart: The Celanese Chemical Company, Inc., plant at Bishop, plans to reclaim about 1300 feet of steel pipe ranging in size from 1" to 10" in diameter. This reclamation work will start November I, 1982. The pipe is insulated with friable asbestos insulation, so insulation will be removed as the first step, and landfill in the designated asbestos landfill located on the plant site. All precautions, outlined in A0 CFR 61.20-61.25, will be observed. This letter will serve as a notification of this work, as required by 40 CFR 61.22 (d) (2). The attached data sheet lists all the pertinent data. Please contact me if you have any questions or comments. Very truly yours, JJF/rgs Attachment bcc: Mr. J. Garza Mr. J. F. Harper Mr. T. L. Markham Mr. W. H. Meyer Austin Mr. R. K. Golemon A.B.I., Bishop Mr. Juan Gonzalez CCCTC Central Files (2) .Fricsch, Jr. Plant Manager tiLANESi ChE'-uCai. COMOany. :NC- 30* *23. 3IS-CP TC rSjAJ TEUTONS 3! 2--53*33; 1 009284 NOTIFICATION INFORMATION - RECLAMATION I. OWNER: Celanese Chemical Company, Inc. II. ADDRESS: P. 0. Box 47320 12S0 Uesc Mockingbird Lane Dallas, Texas 74247 III. DESCRIPTION: Remove friable asbestos insulation from 1300 linear feet of steel pipe ranging in size from 1" to 10" in diameter. IV. ADDRESS OF SITE: Chemcel Plant Celanese Chemical Company, P. 0. Box 428 Bishop, Texas 78343 Inc. V. STARTING AND COMPLETION DATE: Start - November 1, 1982 End - November 19, 1982 VI. NATURE OF RECLAMATION: See III above. VII. PROCEDURE: Wet insulation thoroughly, scrip off insulation, pack, in-plastic bags and landfill in registered (on-site) landfill. VIII. LANDFILL SITE: Texas Department of Water Resources Registration No. 30084 EPA I.D. No. TXD008113441 009285