Document RJXv7m51bxgLV3OG686Ve2dGX
ASBESTOS TEXTILE INSTITUTE
ATI-41
2
IN ATTENDANCE*
ERNEST MUEHLECX, Chairman Keasbey & Mattison Co.
F. J. ARMSTRONG, Johns-Manville Corp,
P. D. CANNON, Johns-Manville Corp.
MINUTES of the meeting of the Sub-Committee of the Dust Control Committee held June 13, 1946 at the Engineers' Club, ?hila Pa*
B. W. LUTTENBERGER, Raybestos-Manhattan, Inc,
J. G. TYSON, Philadelphia Asbestos Co*
HARRIS D, McKINNEY Institute Manager
The Chairman-opened the meeting by outlining the assignment of the Sub-Committee, stating that it was their responsibility to analyze the letters and reports from the various member companies wherein they gave facts on dust determination and control procedures in their respective plants. Copies" of the letters and reports from member companies were given to all those present. These were read and then open discussion was held on the various procedures. Cements and reccnmendations were made as followsi
1, (A) The letters and reports clearly indicated the importance of
the dust control problem to all member companies, and the
need for immediate cooperative action.
.
(B) At present, there is wide variance in individual company
procedures for measuring, exhausting and collecting
asbestos dust.
(C) It is the recommendation of the Dust Control Committee
that contact be made immediately with the proper Health
Departments pr officials of ,
(1) The U. S, Federal Government
WIT-001943
(2) The States wherein member plants are located
(3) The Mellon Institute
(4) The Metropolitan Life Insurance Co.
EXHIBIT B-t
PRODUCED JM-83
NIS 002539
ATI-41
-2
> for purposes of preparing a tentative program aimed at
hiringr>g to member companies the assistance of qualified technical
and medical counsel*
(D) The committee also recommends that, pending the preparation of such
a plan, the following points be consideredi
'.
(1) Pre-employment and periodical chest X-Rays to be made,
analyzed and reported upon by a reputable Roentgenologist.
(2) The method of dust count determination to be used by the
member companies, or their outside consultants, should be
the standard Greenburg-Smith Impinger method as described
in "The Impinger Dust Sampling Apparatus" as used by the
U. S. Public Health Service, -Public Health Reports, 3/18/32,
Vol. 471 No. 12, Government Printing Office, Washington,
. " D. C. The method is also described in detail in the
"Analytical Chemistry of Industrial Poisons, Hazards, and
Solvents" by Morris B* Jacobs (1944), Interscience Pub
lishers, Inc., New York City. On page 114* Jacobs states
The Greenburg-Smith Impinger is the standard instrument
in the U. S* for the collection of dusts". He quotes the
American Public Health Association Yearbook, 1930-40, page
92, as an authority for this statement.
(3) In the analysis of the exposures, it is important to deter
mine as accurately as possible, the following!
.
(a) the amount of dust in the air from the various
industrial operations (this to be expressed in
terms of millions of particles per cu. ft, of
air sampled)
MT-001944
PRODUCED JM-83
MS 002540
ATI-41
-3-
(hj the size of dust particles measured microscopically (o) the mlneralogieal composition, of dust with partic
ular reference to quartz content and designated as the percent of free silica or quartz. (NOTE* a description of the method of determination under (a) and (b) above is covered in the attached copy of letter frcm J. W, Fehnel, Director of Industrial Hygiene Laboratory and Field Service.)
2, The Committee further recommends that the problem of asbestos dust be con sidered at its source. i.e., by the reduction of dust through dampening of yam, in weaving and braiding operations. Every effort should be made by the Management of each firm to convince the Sales Divisions of the necessity, economy and health advantages that would result thereby. It was generally agreed that many of the present sales objections to moisture-controlled products really have no foundation.
3. Mr. Cannon said that he would obtain for testing in the Johns-Manville .Corp. plant, every type of respirator mentioned in the member company reports, and at a later date would report thereon to the Committee.
There being no further business before the meeting, motion for adjournment was moved, seconded and passed.
ERNEST MOEHLECK, Chairman
MT-001945
PRODUCED JM-83
MS 002541