Document RJX19Vazmn8E3meGaLXr1a49k
22654,
Federal Register / Vol. 51, No. 119 / Friday, June 20. 1986 / Rules and Regulations
equallyimportant in showing why fluctuations occur.
occasional excursions above the PEL, are greatly overstated.
OSHA believes, however, that an employer's demonstration that an inspector^ one-day sample is
Sampling Error The second contention made by A1A
unrepresentative, in most cases, should consist of a series of full-shift measurements of the exposure of the
is that the sampling and analytic method for monitoring asbestos is so imprecise at lower levels that employers cannot
employee under consideration. These
. with confidence evaluate whether they
measurements should consist of all valid are in compliancy. As discussed in great
measurements of the employee under
detail in the measurement section,
consideration taken within the last year OSHA has determined that the revised
and should show that on only relatively . phase contrast method set out in this
rare occasions could random
standard can reliably measure asbestos
fluctuations result in measured TWA
exposures below the action level of 0.1
concentrations above the PEL.
f/cc if the procedures and protocols set
Where the OSHA inspection or other information shows that the employer's exposure control programs and equipment are broken or are poorly maintained, where housekeeping programs have not been instituted or are inadequate, or where training programs do not exist or do not meet the standard, it is likely that OSHA's one-day measurements accurately reflect high exposure conditions that are not due to random exposure fluctuations but that are the result of the inadequacies of the employer's protective program. Consequently, citation is appropriate insuch circumstances and no reinspection will.be performed regardless of the employer's past measurements results.
It should be noted that the calculations of probable overexposures . referred to in the above discussion are based oh data from measurements taken in 1983 and earlier. Evidence in the record shows a gradual decline in asbestos levels over the last 5 years although the same technology is being used (e.g., compare data on the fiber, receiving process in Exhibit 84-442 . against the more recent data in Exhibit. 225). OSHA anticipates that, in genera), . exposure levels and the probability of overexposures will decline sis employers
out in the appendix are conscientiously followed.
OSHA acknowledges, however, that this sampling and analytic method for measuring asbestos has the. potential for
error. OSHA, therefore, will add a value that is equivalent to the sampling and analytical error (SAE) of the method to the exposure level measured by an OSHA inspector and will not cite for overexposure unless the measurement exceeds the PEL plus the SAE. As discussed in the section on method of measurement. OSHA believes that the record supports retaining the former SAE of 25 percent [OSHA Industrial Hygiene Technical Manual, 1984, p. A240; see discussion in method of measurement section, infra\. OSHA, therefore, will not cite an employer for overexposure unless the measured oneday's overexposure exceeds 0.25 f/cc-- that is, the PEL of 0.2 f/c.c plus the SAE of 0.05 f/cc. Since the sampling and analytical error.potential can also result in measurements that.are lower than the actual concentrations, the application of the SAE always will give the benefit of the doubt to the employer and assume that actual concentrations are less by 25
percent of the measured results. OSHA believes this additional margin will add to the assurance an employer has about
more conscientiously apply all the available controls and adopt whatever new technology may become available. In this regard OSHA points to a new technique for reducing dust during
his capability for compliance and will . further reduce the possibility that he will
be unfairly vulnerable to an OSHA citation..
OSHA has also required a number of
abatement activity. The details of which practices that will standardize sample -
were submitted to OSHA after the
analysis. These include specifications of
record was closed (see.CACOSH, Exhibit. 344--18): OSHA believes that
a procedure for analysis and laboratory quality control programs.
even minor refinements of existing
technology will help employers achieve Summary.
lower asbestos dust levels and will ' demonstrate that the concern for
In summary, OSHA has determined that the 0.2 f/cc PEL is technologically
possible unfair citations due to day to day variability is illusory.
feasible and will not result in an unfair issuance of a citation to the
Based on all these considerations,
conscientious employer. OSHA's
OSHA believes that AIA's concerns
analysis of each affected industry sector
about the issuance of citations due to
is presented below. In this analysis.
OSHA concentrated on the revised PEL of 0.2 f/cc. As stated above, most the comments received by the Agency agree that 0.5 f/cc is feasible. Some comments, including those of the AFL-CIO (Exhibit No. 335J, argued that a PEL of 0.1 f/cc is feasible, but most of the ''best" plant exposure data indicate that average exposures at many stations (e.g;, most dry mechanical operations) are in excess of 0.1 f/cc and cannot be reduced using current controls and practices.
Tables 11 and 12 summarize OSHA's findings concerning the feasibility of reducing worker exposures to below the 0.2 f/cc PEL. They show that over 99 percent of the affected employees in general industry are expected to be below the PEL. Exposures for over onehalf of the affected employees in construction sectors could be reduced to that level. OSHA, therefore, has determined that it is feasible for most
industry sectors to comply with the 0.2 f/cc PEL most of the time.
Table 11 .--Feasibility Summary Table for General industry; Projection of Work ers Exposed below and Above 0.2 f/cc Following the Promulgation of the
- Standard and the Adoption of Engineer ing Controls and Work Practices
Industry sector
Total No. . of asbestos* exposed workers
Projected No. of worker*
exposed ' to asbestos
levels below 0.2
f/cc
Projected No. of worker* exposed . to
asbestos levels above
0.2 f/cc*
Primary manufacturing: A/C pipe.....--- A/C sheet:................ Textfles .....................
Coatings---------------Friction-............ ....... Paper........... .......... Gaskets..... -...... ....... Ptasties ----- -----------
Secondary - manufacturing: A/C sheet------------Textitea....................
Gaskets--__ _____ Plastic*......-....... . Auto
remanufacturing....
Subtotal__ -.,____ Service and repair
Ship repair______ _ Auto repair.......... .
Subtotal................
Grand totals __
512 202 414
1,327 5.104
387 31$ 324
6,861
345 172
9.972 2.450
4,750
19.183
15.000 526,998
541.898
570.052
409 ISO 123
1.327 4,777
387 315 278
6.042
230 143 1.003 9.972 ' 2.450
4.750
18.548
2.434 526.996
539.434
566.022
103 53 290
0 0 327 0 0 46
619
115 29
SOI 0 0-
0
645
2.566 0
2.566
4,030
* Estimates derived from RTl survey data presented in Appendix 0 of the Final Regulatory impact and Regulatory Flexibility Anafysis (RIA).
Source:* US. Department ot Labor. OSHA. Office of Regu latory Analysis.
GLEASON-000902