Document RJVbYxeRbedG8k3B3Q2gkmqqv

FOSECO, ISMG. INTER-COMPANY AND INTER-DEPARTMENTAL CORRESPONDENCE to: Graham Blanton Vic Fulthorpe Harvey Martin Spencer Lpvejoy Jack Giddens Bill Howie Wib Schneider Nat Wilcox Harold Wright Jack Schmidt FROM:' W. C. Fletcher DATE: April 22, subject: Special Field Tests - New Products, Asbestos-Free Products and Other Special Tests In view of the past lack of recording of many of the special tests made from time to time, we have developed a one-page summary sheet which is now being used to record briefly the test information and particularly the observations of each interested department. A sample of this is attached (Report of Production Test Made on"). We are still having a problem in the follow-up of test material in the steel plants and foundries and for this reason, an additional one-page report sheet is now available ("Field Test Report on Sample Material"). Would you please see that a continuing stock of these sheets is held at your office, or distributed appropriately, so that each salesman can obtain and return a completed sheet which will then be filed with the #1 sheet as a permanent record of the test. Please request sales representatives to complete these #2 sheets and return them to Mary Lou Raybuck at Cleveland so that she can coordinate the filing and the copies required. WCF:mlr Att...- .2 cc: R. C. Phoenix, W. J. Vandemark, D. E. Bryant/C. Brandon, P. A. Partington/R. N. Porter, M. S. Wood/D. R. Miller, H. D. Shephard/G. Fenton, J. Morgan, A. Santighian, D. G. Kreuder, W. Winger, G. H. FitzGerald, S. J. Cinke/ R. T. Callahan 1902 - PRODUCT 9________________ KU'l'IU 01- l'KUl-utlON TEbi MAUL UN \CUSTOMER) ' } (date) ../G. PLANT (shift) ------ RECIPE 9_______ ________ MACHINE t________________ TOOLING TYPE. Prod'n Dept,________________ BATCH SIZE OBJECTIVE OF TEST; 1.0 TECHNICAL DEPT./DESIGN OBSERVATIONS 1.1 Recipe: 1.2 Pulping: 1.3 Forming: 1.4 Machine setting: 1.5 Cycle time: 1.6 Physical test results: 1.7 NOTES:' Test Evaluation Actions Required > Dept. Expenses: Lab hrs Materials Signed: Date: 2.0 2.1 2.2 2.3 2.4 Slurry condition: Tool condition: Machine condition: NOTES: Test Evaluation Actions Required ENGINEERING/TOOLING OBSERVATIONS t ' Dept. Expenses: Lab hrs. Materials Signed: Date: 3.0 QUALITY CONTROL OBSERVATIONS 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 Green shape dimensions: Forming behavior: Oven curing: Dry shape dimensions: Checking fixture fit: Green scrap/Dry scrap: Physical test results: Sales feedback: NOTES: Test Evaluation Actions Required Dept. Expenses: Lab hrs. Materials Signed: Date: 4.0 Production department observations 4.2 4.3 4.4 4.5 Cycle time; Forming behavior: Productivity: NOTES: Test Evaluation Actions Reauired MANAGEMENT RECOMMENDATIONS: Distribution: 11/5/73/1-1^* f kseee '' Dept; Expenses: Lab hrs.________ Materials Signed;- Date: Signed: Date: 1903 'Dace I ' J. FIELD TEST REPOUT ON SAMPLE MATERIAL . . ' -I------ =T~ PRODUCT: ___________________ CUSTOMER RECIPE:* - ' SAMPLE I.d! OBJECTIVE OF TEST:____________ mfg! plt_____ prod! test # 1.0 SALES/MAKKETING/COMMERCIAL DEVELOPMENT OBSERVATIONS: By: 1.1 Packaging/Shipping:_____________________________________ _________________ 1.2 Handlabilicy:_________ |_________________________________________________ __ 1.3. Hardware and/or attachment:___________._________________________________ 1.4 Fit in ingot/casting:._____________________ 1.5 Pouring and stripping:______________________________ 1.6 Metallurgical test results/remarks:_________________________________ 1.7 Relevant Steel Plant variables:___ 1.8 Test evaluation/customer reaction: 2.0 QUALITY CONTROL OBSERVATIONS: By: 2.1 Packaging/Shipping:______________________________________________________ 2.2 Handlability: ______________ ]___________________________________________ 2.3' Hardware:___________________________________________________________________ 2.4 Fit in ingot/casting:___________________________________________________ 2.5 Pouring and stripping:__________________________________________________ 2.6 Other remarks:_______________________________________________________ 2.7 Test evaluation:_____________ ___________ ' 3.0 NOTES:______________________________________________ -__________________________________ ________________________________ ______________ _____1904