Document RJVBwdYbjg2RqVZEM6qrbRD4v
INTER-OFFICE MEMORANDUM
TO AT
COPIES TO
Vern L. Frankson W. M. Schuck C. W. Graff (2) H. C. Boucher (3)
See Distribution
DATE FROM
AT
JOB NO.
subject
Sub-Contract No. 71U8-1318 - Change Order No. 2 Gunite Refractories Corporation
July 28, 1967
r U
lgei
Middletown, Ohio 71U8
Attached is a manually signed copy of subject Change Order Conformed copies are being distributed.
SSSsprl
cc - with attachment
ARMCO
KAISER
F. W. Barnes (2) P. R. Smith J. S. Lotz Reading File
D. A. Daly G. L. Roberts E. J. Denner J. Mainier S. Ustel B. Scott A. L. Gordon C. Billings F. N,, Norton M. D. Wilson S. M. Lyon L. J. Gillett - Oakland R. J. MLnarcini - Oakland W iHFs'-Bort--- Oakland R. D. Sahiberg - Butler Central File Reading File
KEN 010803
DEVIATIONS FROM OR ADDITIONS TO SUB-CONTRACT AND SPECIFICATIONS
Sub-Contract No. 711*8-1318 dated November 21, 1966. Change Order No.2
Subjects Abresist lining-Mill Scale Flume Systems. Date.of CO. 6-19-67
Locations Armco Steel Corporation - Middletown, Ohio
Sub-Contractors Gunite Refractories Corporation 1301 Woodswether Road Kansas City, Missouri _6iil09 `"Kirs'ua'r^' -t'o tne provisions of Xrtic'le 5 of ihe'
General Terms and Conditions, Sub-Contractor shall perform The Work in accordance with the following changes:
A/ SFECIAL PROVISIONS? That part of this sub-contract identified as Exhibit C and entitled "Special Provisions" is hereby amended by the addition of the following Item 3?
3. The sub-contractor having made claim for payment of costs incurred because of delays in performance of The Work, created by causes above and beyond his control, in the amount of $ 3,762.30 and the Contractor having taken exception to these charges as being excessive; it is mutually understood and agreed that the Contractor snail make payment of a lump
sum of $1,1*69.38 in full settlement of sub-contractor's Invoice Nos. GR-221 and GR-237, dated March 31, 1967.
Lump Sum Net Price Increase
CHANGE IN GOKffiNSAflONs Total lump sum amount" increased from $39,760.00 to $37,229.38
CHANGE IN COMPLETION DATE? None
1.U69.38
Except as herein expressly modified, said sub-contract as heretofore amended and all the Terms and Conditions thereof shall remain unaltered and in full force and effect and shall apply to all the work performed hereunder.
ACCEPTED?
AUTHORIZED?
Gunite Refractories Corporation (Sub-Contractor)
...
-A
\
VcvJy*
Kaiser Engineers, Inc., Agent for Armco Steel Corporation
"(Contractor)
By /s/ B. E. Driscoll
**O Title _____ General Manager1 V
Date
rv-fiC' July 18. 1@ki)v
'
By /s/ D. A. Dalv______ Title Protect Manager Date June 28, 1967
SSSsjf
KEN 010804
INTER-OFFICE MEMORANDUM
TO AT
COPIES TO
Vem L. Frankson W. M. Schuck C. W. Graff H. C. Boucher (3)
See Distribution
DATE FROM
AT JOB NO.
subject
Sub-Contract No. 71U8-1318 - Change Order No. 1 Gunite Refractories Corporation
March 20, 1967 Donald K. Carlson
Middletown 71U8
Attached are conformed copies of subject Change Order. Copies are being distributed.
DECiprl
cc - with attachment
ARMCO
KAISER
F. W. Barnes P. R. Smith J. S. Lotz Reading File
D. A. Daly G. L. Roberts S. G. Imherr E. J. Denner L. H. Kash S. Ustel A. L. Gordon M. D. Wilson L. J. Gillett - Oakland R. J. Minarcini - Oakland
*W* F;'Boit - Oakland R. D. Sahlberg - Butler Central File Reading File
KEN 010805
DEVIATIONS FROM OR ADDITIONS TO SUB-CONTRACT AND SPECIFICATIONS
SUB-CONTRACT NO. 711x8-1318 DATED November 21. 1968 CHANGE ORDER NO. One
SUBJECT: Abresist Tile Installation DATE OF CHAN ORDER March 9. 1967
LOCATION M-ni Scale Flume System - Hot Strip Mill - Middletown Works, ' Armco Steel Corporation
SUB-CONTRACTOR:
Gunite Refractories Corporation 1301 Woodswether Road Kansas City, Missouri 6UlO$
DESCRIPTION OF CHANGE: It is hereby mutually understood and agreed that the Lump Sum Compensation is increased by the amount of $9,600.00.
Reason; Sub-Contractor's mistake in interpreting bid documents. SubContractor did not understand that maximum mortar thickness of 3/lx" referred to in Special Provision No. 1 (F) referred only to mortar used for setting tiles. He assumed that this statement made irrelevant the reference to an approximate lx" difference between elevation of concrete and tile.
It is also mutually understood and agreed that Sub-Contractor will apply this approximate lx" contour "build-up" with a cement gun.
......r
CHANGE IN COMPENSATION: Total Lump Sum Amount Increased from $26,160.00 To $3^.760.00
CHAN IN COMPLETION DATE: None
:
EXCEPT AS HEREIN EXPRESSU MODIFIED, SAID SUB-CONTRACT AS HERETOFORE AMENDED, AND ALL THE TERMS AND CONDITIONS THEREOF SHALL REMAIN IN FULL FORCE AND EFFECT AND SHALL APFLX TO ALL THE WCRK PERFORMED HEREUNDER.
ACCEPTED:
AUTHORIZED:
GUNITE REFRACTORIES CORPORATION (Sub-Contractor)
By /s/ Title
B. E. Driscoll
v*v* * *
General Manager________
KAISER) ENGINEERS, INC., AGENT FORVARMCO STEEL CORPORATION _n vX-S\ (Cbhtractor)
^ By /s/ Vem L. Frankson
*"
Title Manaeer - Procurement
KEN 010806
INTER-OFFICE MEMORANDUM
TO Vern L. Frankson AT W. M. Sebuck
C. W. Graff
date December 5, 1966 from Donald E. Carlson
Attached is a fully executed copy of subject Sub-Contract for your file. Conformed copies are being distributed as indicated below.
DKC/cf
cc - with attachment
AHMCO
KAISER
F. W. Barnes P. R. Smith J. S. Lotz Reading File
D. A. Daly G. L. Roberts E. J. Denner S. UstaL L. H. Eash A. L. Gordon F. P. Kennedy F. N. Norton M. D. Wilson S. M. Iyon L. J. Gillett - Oakland M. J. Janner - Oakland W. F. Bort - Oakland R. D. Sahlberg - Butler Central File Reading File
KEN 010807
-- *-
vj... ..
KAISER ENGINEERS, INC. Agent for
Armco Steel Corporation
SUB-CONTRACT
Sub-Contract No. 71U8-1318 November 21, 1966
This Sub-Contract is made pursuant to a Contract between Armco Steel Coiporation (hereinafter called "Owner") and Kaiser Engineers, Inc., (hereinafter called "Contractor") Agent for Armco Steel Corporation, whereby Contractor agreed with Owner to furnish engineering, construc tion, and other services relating to the expansion and modernization program at Owner's Middletown Works, Middletown, Ohio.
Contractor and Gunite Refractories Corporation (hereinafter called "Sub-Contractor") hereby agree that the following work shall be per formed by Sub-Contractor for the compensation and upon the terms and conditions hereinafter set forth on Face Sheets "A" and "B" of the Sub-Contract, and including Articles 1 through 37 of the General Terms and Conditions attached to and made a part of this Sub-Contract.
WORK TO BE PERFORMED: Furnish all labor, tools, supervision, materials, supplies, transportation and equipment (except as provided for in Exhibit "B" hereof) and do all things necessary to handle and install corrolete, Flume Liners in three (3) Mill-Scale Flume Systems of the Owner's Hot Strip Mill and Scale Pit Nos. 1, 2, and 3, all in strict accordance with Exhibit "A", all such work being hereinafter sometimes called "The Work".
PLANS, DRAWINGS AND/OR SPECIFICATIONS: Attached hereto as Exhibit "A", and by this reference made a part hereof.
ITEMS TO BE SUPPLIED BI CONTRACTOR: As per list attached hereto marked Exhibit "B", and by this reference made a part hereof.
LOCATION OF WORK: At Owner's Middletown Works, Middletown, Ohio..
WORK TO COMMENCE: As of the date of this Sub-Contract, with field work to commence- on date specified in Contractor's Notice to Proceed, to be issued to Sub-Contractor.
WORK TO BE COMPLETED: Time is of the essence of this Sub-Contract, and all work shall be completed by Sub-Contractor as soon as due diligence and good practice will permit,' but in no event later than April 25, 1967, or such extended completion date as may be applicable in accordance with and pursuant to the provisions of Article 15 hereof.
FACE SHEET "A"
./
iS
KEN 010808
X*'. * t~*
*ys
!.y . > x.
Sub-Contract No. 71U8-1318
BOND: Not required.
` COMPENSATION: Sub-Contractor agrees to perform The Work for the following Lump Sura price, which includes all present and future state, federal and local excise and transportation taxes, and all other taxes pertaining to the transaction except the Ohio sales and use tax applicable under the following circumstances:
Any Ohio sales and use tax liability on personal property trans ferred under the Sub-Contract by the Sub-Contractor to Owner, 'will be accounted for by Owner under its Direct-Payment Permit No. 161-M. Any Ohio sales and use tax liability for materials transferred to Owner as improvements to Owner's real property'will be determined by Sub-Contractor in cooperation with Owner; such tax is Sub contractor's direct responsibility, but Owner will reimburse SubContractor over and above the price stated below for the amount
of such tax.
LUMP'SUM
$ 26.l60.00
ADDRESSES:
Sub-Contractor:
Gunite Refractories Corporation 1301 Woodswether Road Kansas City, Missouri 6ijl05
Contractor:
Kaiser Engineers, Inc., Agent for Arraco Steel Corporation P. 0. Box F Middletown, Ohio k$0h2
LIQUIDATED DAMAGES: None. Article 31 of the General Terms and Conditions hereof is inapplicable and is hereby deleted.
ADDITIONAL EXHIBITS: The Special Provisions attached hereto as Exhibit "C", and the Standard Conditions attached hereto as Exhibit "D", are by this reference made a part hereof.
In Witness whereof, the parties have made and executed this Sub-Contract as of the day and year first hereinabove written.
GUNITE REFRACTORIES CORPORATION (Sub-Contractor)
KAISER ENGINEERS, INC., :AGENT FOR ARMCO STEEL CORPORATION
(Contractor)
By h/f" /('ir. Title
/(
- ' 'X' / - A - Title Manager - Procurement
FACE SHEET "B"
KEN 010809
1
~y< .
*r.
.
Sub-Contract Ho. 7148-1318
EXHIBIT "A" PLANS. DRAWINGS AND/OR SPECIFICATIONS
.
The following drawings and specifications are by this reference incorporated herein:
DRAWING NO. - REV. NO. - DATE TITLE
600029
0 . 3-4-66
General Arrangement of Hot Strip Mill
600030
0 3-4-66
General Arrangement of Hot Strip Mill
600458 600459
4 4-20-66 Inlet Flume, Scale Pit #3, Plan & Sections 2 4-20-66 Scale Pit #3, Sections and Details
600466
1 5-24-66 ' Scale Pits #1 and #2
600473
1. 11-18-65 Inlet Flume @ Column Line 29
600475
1 11-18-65 Inlet Flume
600546
2 3-31-66 Roughing Mill
600606
1 12-30-65 Mill Table Sections
600607
2 8-31-66 Mill Table Sections
600756
2 6-21-66 Roughers #1 and #4
601355
2 9-30-6$ Scale Pit #3, Flume Arrangement
601378
a. 8-24-65 Scale Pit #1, Flume Arrangement
601379
I 8-24-65 Scale Pit #2, Flume Arrangement
601380
0 8-24-65 Scale Removal System
601638
2 11-3-65 Scale Removal System
601639
1 11-3-65 Scale Removal System
10355
12-14-65 M. H. Detrick Co., Mill Scale Flume System
10356
12-14-65
M. H. Detrick Co., Mill Scale Flume System
10357
12-14-65
M. H. Detrick Co., Mill Scale Flume System
10358
12-14-65 M. H. Detrick Co., Mill Scale Flume System
KEN 010810
T-iy.
EXHIBIT "A" PLANS, DRAWINGS AND/OR SPECIFICATIONS
PAGE 2
DRAWING NO. - RE7. NO. - DATE TITLE I
103j#
5-1-66 M. H. Detrick Co., Mill Scale Flume System
10360
12-1U-65 M. H. Detrick Co., Mill Scale Flume System
10361
12-1U-65 M. H. Detrick Co., Mill Scale Flume System
10362
12-lii-65, M. H. Detrick Co., Mill Scale Flume System
SPECIFICATIONSt 1. ASTM Designation C-11&, Aggregate for Masonry Mortar. 2. ASTM Designation C-270, Masonry Mortar Type WN".
KEN 010811
. S; Contract No. 71U8-1318* EXHIBIT "B" ITEMS TO BE SUPPLIED BI CONTRACTOR 1. Abresist tile already located at Kaiser-Engineers Warehouse in wooden cases (approximately 1*500 lbs. per case). 2. Source of potable water in Hot Strip Mill at various outlets. 3. Sanitary facilities as located at various points throughout the jobsite. li. Electrical power, hhO volt, three phase, and 120 volt, single phase, at Contractor's distribution panels. 5. Storage space near the site of The Work for storage of materials. 6. Crane service, with operator, to off-load crates of abresist material from Sub-Contractor's truck in area adjacent to flume, as designated by Sub-Contractor. 7. Concrete flume, in accordance with structural concrete drawings. 8. Grade line in flume.
ken 010812
,,"m V? ,I,.IWI?*T* **'
"<* * * *< * ` .,^-- Jub-Contract No. 71^8-1318
EXHIBIT "iC" SPECIAL PROVISIONS
1. It is mutually understood and agreed that the following descriptions and
construction conditions apply to The Work and are, by this reference, '
xf.-di s
incorporated into Exhibit nAn Specifications:
. v-Sx, ;
(a) Abresist tile will be loaded by Contractor on Sub-Contractor's trucks in Contractor's warehouse compound.
".-'/.'Vv:
(b) Sub-Contractor shall take due care in handling abresist tile, which is a somewhat brittle material and the edges chip if not ' handled carefully.
"
(c) Manufacturer's drawings, which are listed, indicate the tile placing
for the three (3) systems. These drawings indicate the number of
pieces required, piece numbers, and number of pieces shipped. Each
cast liner is individually marked and its position indicated on
the installation drawings.
*-
(d) Back of tile shall be cleaned of ary loose particles prior to installation.
'-"V.-
(e) Grout forming flume contour shall have rough finish.
(f) Mortar bed for tile shall be 1/2" to 3A" thick. Tile shall be pressed so that mortar wrill squeeze out and form a lA6" to 1/8" joint.
(g) No more than two (2) rows of liners shall be installed vertically at one time. Allow twenty-four (2ii) hours to set.
. '
(b) Cross section of concrete flume has been indicated on manufacturer's drawings. Invert elevation of abresist lining is approximately ]*" higher than concrete cross section of flume. Mortar thickness can vary to insure invert elevation is as shown on manufacturers drawings.
(i) The general description of the Abresist Liner Tile is as follows:
Material Shipping Weight: Approximately 237>00 lbs.
Material Net Weights Approximately 216,350 lbs.
Fused cast, annealed blocks, 1-1/4" average thickness (weight: 17. lbs./Sq. Ft.) made in West Germany from basaltic rock material and cast to fit contour of concrete trench for laying/setting in a sand and cement mortar.
i
KEN 010813
Minp*
*crr
ar-. u^'-iy.rw
W i/i I"J
rn |l "'ll
?i:::I provisions AGZ 2
Included in the above quantity is an allowance of approximately three percent (3%) of the total tile requirement for normal breakage and damage in shipment and handling (Contractor's inspection indicates material received in good condition).
(j) Contractor will arrange to have the manufacturer's American Licensee, the M. H. Detrick Coiqpany, Chicago, Illinois, provide the Sub-Contractor one or two days of installation instruction at the commencement of work.
2. Sub-Contractor shall perform The Work in such a manner as to cause no interference with the normal operation of Owner's Middletown vvorks.
KEN 010814
KEN 010801