Document RJQd3DqZBe8nMoboxXZrYq3EE

Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) 1/15/2020 Water Brine - CWA Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact: Eskridge Production Company Robertson Lease 36.206242, -96.000952 (Sect. 14, T 20N, R 12E) Tulsa, Oklahoma 74106 403 Wright Bldg. Tulsa, Oklahoma 74103 Tulsa County (918) 836-3058 Janice Eskridge WALLYJOW@COX.NET FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: N/A N/A N/A 21111 1311 Personnel participating in inspection: Kent W. Sanborn EPA 6 ECDWE Environmental Engineer EPA Lead Inspector Signature/Date Supervisor Signature/Date Kent W. Sanborn Digitally signed by Kent W. Sanborn DN: cn=Kent W. Sanborn, o, ou=6EN-WR, email=sanborn.kent@epa.gov, c=US Date: 2020.02.19 08:13:54 -06'00' Kent W. Sanborn GUY Digitally signed by GUY TIDMORE TIDMORE DN: c=US, o=U.S. Government, ou=Environmental Protection Agency, cn=GUY TIDMORE, 0.9.2342.19200300.100.1.1=68001003655426 Date: 2020.02.28 10:38:11 -06'00' Guy Tidmore Date 28 FEB 2020 Date 6ENFORM-019-8 (10/31/2019) 1 Section I - INTRODUCTION Eskridge Production Company/ Robertson Lease Inspection Date: 01/15/2020 PURPOSE OF THE INSPECTION EPA Region 6 inspector K.W. Sanborn visited the Eskridge Production Company oil and gas facility located near Tulsa, Oklahoma on 01/15/2020 for an unannounced inspection. There were no representatives of Eskridge Production Company present for the inspection. The inspection was conducted by authority of the Clean Water Act and the Safe Drinking Water Act to determine compliance with the Environmental Protection Agency (EPA) regulations. FACILITY DESCRIPTION This facility is known as the Robertson Lease and is located east of the Osage casino. Section II - OBSERVATIONS I observed fluids inside the secondary containment berm that were seeping out at the base. I saw a leak in a parted flow line under the lease road at the tank battery. Additionally, I observed 12 drums stored on location during the inspection. Section III - AREAS OF CONCERN The secondary containment berms were seeping and there were fluids in the containment area being released from the site. Section IV - FOLLOW UP EPA water enforcement will conduct a follow up inspection in approximately 2 months. Section V - LIST OF APPENDICES N/A 2 6ENFORM-019-8 (10/31/2019)