Document RJL629aDmDzn0Y6BL88y064qz

To From: Subject: Dr. R. A. Kehoe J. Cholak Meeting in San Francisco on June 18,.'to discuss progress of air sampling program in connection with Cal. Research study of the use of X*-105A. Attendants: Same as those attending meeting on May 21, plus the'following: : . J. L. Cooley l.: H. Porter \'y\: > J . Spence p _y ; - J . Sabina L. A. Gerlach, M.D. : Cal. Research Cal. Research Cal. Research DuPont DuPont X The /meeting; was concerned:': with ;a discussion of the progress of the environmental ^ through June 15. During this period Phases I and II had been completed and Phase III had been in progress for 12 days. The environmental findings to date were : reviewed and summarised. The data to date .showed. -t h e ;following relationships. p Phase I Mg. Pb/M3 at islands ': 34 . (36 samples collected) Mg. Pb/M3 - entire area Average ventilation-fpm Average T- F . r- CO-ppm 90 60 11 d . Phase II v 0;: Phase III 45 (64 samples collected) 100.7 (19 samples collected) , J! (86 samples collected) 88.6 (62 samples collected) 83 ;. 8 1. 5 10.4 40-50 ...61.6 16 . 0 0003982 2 The particulate lead picture was also reviewed and that in Phases I and II, the particulate matter was total lead present. The few samples thus far available indicated that the particulate matter was about 15^ of t-he ^ f ' " This was higher than expected and was thought to be due ~to th- ' poor ventilation during Phase III operation as compared with* thr- good rates of ventilation which were encountered for the Phase I and Phase II periods. The, average/concentrations of particulate matter in the air, as determined from the tapes of the A.I.S.I. smoke sampler, were found to be 5.2 and 6.1 micrograms/M3 for Phase I and Phase II operations respectively. Phase III tapes had not been analyzed by the time of this meeting. 1. . .. ,, There then followed a discussion on the biological samples and the reasons for sending them to Cincinnati. Cal. Research people felt thatthere.was-too long a lag in receipt of reports and, after considerable discussion and a conference with Dr. Kehoe by telephone, it was agreed that: - .. , 1. Biological specimens from Phase III work be pushed ahead ; so that "last i n ,! samples are,analyzed first. These ; samples will be shipped by air-mail in the future. ' V s'.': :. 2. Sufficient samples from Phase IT be included so that "a: continuous and^orderly record of results can b obtained. . .. 'a , - . _ 5 -.Additional urine samples will be collected and shipped to the DuPont laboratory at Antioch for analysis. . These results will be examined to observe.immediate , trends more rapidly and..will be made" available tot ,, Kehobfr.. inclusion in his report if he so desires. : :; 4. The biological testing program will be continued for . ` six, weeks, three, longer than originally planned. ... . ,: . ,:5. Air sampling will be continued in as complete a manner . a ....'V;''' ' as possible during the entire period of six we e k s . 0 0003983 6/ 25/59