Document RJGVLwVRE53VB3YZRo5p5n3kn
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS
77 WEST JACKSON BOULEVARD CHICAGO, IL 60604
DATE: SUBJECT:
FROM:
MAR 1 5 1n1q
CLEAN AIR ACT INSPECTION REPORT Tradewater Refrigerant Services, Elk Grove Village, Illinois
Charles Hall, Environmental Engineer c_.,, ),h,J,{
AECAB (MN/OH)
THRU:
Brian Dickens, Section Chief AECAB (MN/OH)
TO:
File, Tradewater Refrigerant Services, Elk Grove Village, Illinois
BASIC INFORMATION
Facility Name: Tradewater Refrigerant Services
Facility Location: 650 Morse Avenue, Elk Grove Village, Illinois
Date of Inspection: 08 March 2019
EPA Inspector(s): 1. Charles Hall, Environmental Engineer 2. Natalie Topinka, Environmental Scientist
Other Attendees: 1. Karneron Perry, Process Technician 2. Gabriel Plotkin, Chief Operating Officer by telephone during closing conference 3. Kevin Schwartzenberg, Director of Engineering by telephone during closing conference
Purpose of Inspection: chlorofluorocarbon reclaimer
Facility Type: chlorofluorocarbon reclaimer
Regulations Central to Inspection: 40 C.F.R. Part 82, Subpart F
Arrival Time: 08:40 a.m. CST
Departure Time: 09:55 a.m. CST
1 of 5
Inspection Type:
ISi Unannounced Inspection
ISi Announced Inspection
OPENING CONFERENCE
[gJ Credentials Presented
lz:I CBI warning to facility provided
The following information was obtained verbally from ATTENDEE(S), unless otherwise noted.
Process Description:
Tradewater receives refrigerants including R-11, R-12, and R-134A in containers that range in capacity from 12 ounces to 1,000 pounds. The number and type of containers received is verified against the number and type of containers expected. The containers are added to Tradewater's inventory and placed in the appropriate storage area. A technician tests the refrigerants with an analyzer to make a preliminary assessment of the refrigerant type and purity. Refrigerant is filtered to remove particulate matter and moisture (water) and consolidated into larger containers including 1,000-pound cylinders, 10,000-pound bulk tanks, and 35,000-pound ISO tanks.
Tradewater samples the refrigerant and has it analyzed by an Air-Conditioning, Heating, and Refrigeration Institute (AHRI) -certified laboratory to determine its purity. Depending on the results of the analysis, Tradewater may further process the refrigerant by distillation, filtration, or use of a desiccant bed. Currently, Tradewater ships the refrigerant in 35,000-pound ISO tanks to a third-party-facility for destruction. In the future, Tradewater may also reclaim refrigerant to AHRI-700 specifications and offer it for sale.
TOUR INFORMATION
EPA toured the facility: Yes
Photos were taken during this inspection. Videos were not taken during this inspection.
Field Measurements: were not taken during this inspection.
CLOSING CONFERENCE
Requested Documents: The inspectors requested: A process flow diagram; and The potential to emit calculations for the Plasma Enhanced Melter
2 of5
Compliance Assistance: The inspectors did not provide any compliance assistance. Concerns: During the closing conference, the inspectors stated that they did not identify any concerns.
SIGNATURES
Lead Inspector: Section Chief:
3 of5
Appendix A: Log of Photographs
Photograph Number RIMG000l.jpg R.I~1G0002.jpg
Date and Time
03/22/2019 09:00 a.m. 03/22/20-19 09:02 a.iLYL
RIMG0003.jpg RIMG0004.iog RIMG0005.iog RIMG0006. ju!:! RIMG0007.io!:! RIMG0008.jpg
03/22/2019 09:04 a.m. 03/22/2019 09:06 a.m. 03/22/2019 09: 17 a.m. 03/22/2019 09:20 a.m. 03/22/2019 09:20 a.m. 03/22/2019 09:21 a.m.
Description
Storage area for cylinders
J~,arge cyli11der u111oadi11g area~ Rcceivi11g Doc-1c jrt
background Analyzer Small cylinder and container unloading rack Waste drum storage area Plasma Enhanced Melter Consolidation cylinders Wet scrubber for Plasma Enhanced Melter
4of5
CONFIDENTIAL BUSINESS INFORMATION SECTION
Facility Name: Tradewater Refrigerant Services Facility Location: 650 Morse Avenue, Elk Grove Village, Illinois Date ofinspection: 08 March 2019 Photograph of Plasma Enhanced Melter taken on 03/22/2019 at 09:20 a.m. Photograph of Consolidation cylinders taken on 03/22/2019 at 09:20 a.m. Photograph of Wet scrubber for Plasma Enhanced Melter taken on 03/22/2019 at 09:21 a.m.
5 of5