Document RJ7j7vLoZBe20BgDdEkxMKdgB

GENERAL SPECIFICATIONS FOR STEAM TURBINES SURFACE PREPARATION: The surfaces to be insulated must be thoroughly clean from any motenol, such as dust, oil, old insulation, or floky rust which is apt to interfere with the proper bonding of Asbestospray's High Temperoture Fiber insulotion and the metal. Wherever nuts and bolt threcds are to be protected, the opplicotor should cover them with asbestos cloth or poper, thus preventing the fiber from adhering to the threods. All open piping must be masked to prevent the osbestos fiber from entering the turbine. SUPPORTS It is recognized that supports w i! be necessary on the iower half of the turbine cosing only. Supports on the upper half of the turbine ere at the owner's option. Supports may be in the nature of the following: Where permi s $ b>e, rectangular 1 8 *3 8 split pins as supplied by K.S.M. Division of Omark , or approver equal spaced approximately '8" on center should be welded to the casing by the manufacturer, owner or contrcctor. Where welding s no* permitted, the casmg should be drilled for 1 '4" studs or eye bolts in lieu of the welded pms Speea washers are to be used with the studs. Heavy gauge tie wire, looped so as to form rabbit ears, :c~ oe used witn the eyeboits. When strap brackets are necessary, they are to be welded, when permitted, or fastened to the flange at the four quarter pa nts APPLICATION The application of Asbestospray's High Temperature fiber insulation to a turbine is o unique and interesting process. This is one of the few times : >s recommended that the fibers be applied in more than one loyer. This is done so as to assure the most efficient msuiation coating possible, it is also important to note the special application procedures which must be followed to assure the owner a fast economical and successful insulotion. These procedures ore as follows- If you ore to start on the bottom, select o suitable area (one which would oct os o key) to start your sproying. Apply the insuia* an so os to form o layer approximately 2'j inches thick. This initiol layer is not pressed in the stendard manner. The first 2]/j inch coating is compressed with the sharp or knife edge so as to form a a.iited pattern. This process provides o tightly knit insulation where it is needed most ond at the same time provides o key where the succeeding loyer will successfully knit with the primory layer of insulotion. When ond where space permits, the whole casing should be done in this monner. This will permit heat to be introduced to the turbine, reducing the normol stortup time. As the mechanic compresses the fiber with the sharp edge of his trowel, he starts his mechanical support of the insulation by bend.ng one side of every second split pin, attaching a speed clip to every second stud or by pressing flat into the insulation one side of the rabbit ears. ^ r>.| tn The sproy process now continues with the opplicotor building up the insulation coating until the unpres^J thickness is approximately i to 1 inch above the specified or recommended thickness. The insulation isgg then lightly tamped or pressed with o wooden trowel or float, the edges of which hove been rounded off os to eliminate tool marks. If a fine finish is desired, an over spray of atomized water and stroking of th^ fiber surface with a finishing trowel will produce the desired effect. Care should be exercised, however<b hold the trowel in a slightly tilted position when stroking, or the trowel will dig into the yet soft coatingB Where an easy separation point around the flanges is desired for repair work, the fibers are applied so that r' the coating tapers into o feather edge at the flange. The fibers are then pressed and troweled smooth, at this point wetted asbestos paper is applied to the troweled surface and the spray process is now continued over the flange to complete the insulation of the turbine cosing. It is known that while the asbestos paper will in no way affect the insulation coating, it does facilitate easy removal of the insulation-oround the flonge. In order to establish a uniform program of application, it is suggested thot the insulation be applied in the following manner: 1. The underside of the turbine casing. 2. The steam tronsfer I ines above the turbine easing. 3. The top half of the turbine cosing. 4. The horizontal flonge. 5. The steam mains. 6. The valve chests and auxiliaries. 2 C311S1S1 HMBB-0006096 NOTES- 1. HIGH DENSITY LAYER. 2. NORMAL DENSITY. 3. KSM RECTANGULAR WELDING PINS 1/8" x 3/8" SPLIT BY THE PROPER LENGTH. 4. ALTERNATE: IF WELDING IS NOT PERMISSABLE, CASING TO BE DRILLED AND TAPED FOR STUDS AND SPEED WASHERS. 5. STRAP BRACKET SCREWED ON. 6. STRAP BRACKET WELDED ON. 7. S.S. STRAP 3/4" x .020" THICK. 8. SEAL. 9. SEPERATE FLANGE JOINT ISOLATION. TURBINE FINISH 1 031.12122 MHBB-0006097 NOTES- 1. HIGH DENSITY. NORMAL DENSITY. KSM NO. 10 GA. PIN AND W % \W' SPEED WASHERS OR EQUAL. 1" HEXAGONAL 20 GA. WIRE MESH. ALTERNATE: IF WELDING IS NOT PERMISSABLE, CASING TO BE DRILLED AND TAPPED FOR STUDS AND SPEED WASHERS. FINISHING CEMENT TURBINE FINISH 2 031.12123