Document RJ6V5DjY58eLq6eeno4zEdMB7
EPA REGION 5 Enforcement and Compliance Assurance Division INSPECTION REPORT
Inspection Entry Date/Time Inspection Exit Date/Time Weather Media Statute(s)/Program(s) Type of Inspection
04/24/2025 08:55 AM (ET) 04/24/2025 11:28 AM (ET)
Announced: No Access: Granted
Water Clean Water Act, NPDES, Industrial Compliance Evaluation Inspection (CEI)
Permittee Name Facility or Site Name Facility/Site Physical Address City, State, Zip Code County/Borough/Parish Facility GPS Coordinates Mailing Address (If different) City, State, Zip Code
Hirzel Canning Co (0387000242) Hirzel Canning Co (0387000242) 411 Lemoyne Rd Northwood, OH 43619
41.60965, -83.47401
FRS ID
110008595760
Permit Number(s) (If Applicable) OH0135666
SIC and/or NAICS
2033
Lead Inspector: Joseph Forth
JOSEPH FORTH EPA REGION 5
Digitally signed by JOSEPH FORTH Date: 2025.06.13 10:25:52 -05'00'
Forth.Joseph@epa.gov
(312) 886-7275
Supervisor Review: Molly Smith
MOLLY SMITH EPA REGION 5
Digitally signed by MOLLY SMITH Date: 2025.06.13 11:17:38 -05'00'
Smith.Molly@epa.gov
1 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
SECTION I - INTRODUCTION
Site Entry and Inspection Objectives
EPA REGION 5 Lead Inspector, Joseph Forth, arrived at the Hirzel Canning Company (0387000242) (the "Site" or "Facility"), located at 411 Lemoyne Rd, Northwood, OH 43619, at 08:55 AM (ET) on 04/24/2025 for an unannounced inspection. EPA REGION 5 Lead Inspector presented credentials to Jessica Hirzel and informed the Facility that this was an EPA REGION 5 inspection to investigate as authorized by Clean Water Act (CWA) Section 308. This report is based on information supplied by Hirzel Canning Company (0387000242) representatives, direct observations made by the EPA REGION 5 inspector, records and reports maintained by the permittee and other information including: photographs taken by EPA REGION 5 inspector(s), physical evidence collected by the EPA REGION 5 inspector(s), measurements taken by EPA REGION 5 inspector(s), verbal or written statements made by information supplied by Hirzel Canning Company (0387000242) representatives during or subsequent to the on-site Inspection, and materials, processes, data, photographs, or documents shown, demonstrated, or submitted to the EPA REGION 5 inspector(s) by Hirzel Canning Company (0387000242) representatives during or subsequent to the on-site Inspection. In addition, information gathered prior to or subsequent to the Inspection from a review of EPA, State, and/or public records may be included in this report.
Attendees Organization
EPA REGION 5 EPA REGION 5 EPA REGION 5 Hirzel Hirzel
Attendee Name
Joseph Forth Megan Bobb Tatiana Frontera Jessica Hirzel Dan Jackson
Facility/Site Description
Title
Lead Inspector Inspector Inspector Plant Manager Wastewater Superintendent
Present in Opening Conf. Yes Yes Yes Yes Yes
Present in Closing Conf. Yes Yes Yes Yes No
EPA REGION 5 lead inspector confirmed the following facility information:
Hirzel Canning Company is a facility that processes and packages (cans) tomatoes and cabbage. During fresh produce season, the facility employs 80 employees. The Facility is open Monday through Saturday. The Facility is split into two seasonal plants. The cabbage plant operates from 7:00 AM to 7:00 PM and the tomato plant operates from 6:00 AM to 9:00 PM. From August to mid-October, the Facility processes tomatoes. From July to late October or early November, the Facility processes cabbage. The process begins with receiving the produce from the farms, once received the produce is washed with water. Hirzel grows 5% of the tomatoes used in the process, the rest of the tomatoes and cabbages are from contract farmers. Plant receives 30 truck loads of tomatoes and 5-6 truckloads of cabbage per day during processing season. Cabbage is passed through a tumbler system and sprayed with water. Tomatoes washed in the transfer trucks, the water then helps convey the tomatoes, via floating, into the plant. Water is also utilized for heating/steam and for sanitation of equipment.
Tomatoes are cooked in tanks and peeled. Minimal water is added to the product when canned, most liquid is derived from the produce. Off-season is when cabbage is canned and pasta sauce and other products are made.
All wastewater has solids separated and is then applied to the grass fields behind the facility The spray field systems were brought online in Summer 2024. The fields have a capture system for the wastewater that then conveys the wastewater to the lagoon system. November through July is when the lagoon system is open and
2 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
actively discharging. The average flow when discharging is 0.15 million gallons per day (mgd). The 3 lagoons are connected in series. In Spring 2024, the barrier wall between ponds 2 and 3 was removed and the lagoons combined. Solid wastes are separated before reaching the lagoons and sent to a composting facility in Pemberville, OH. The Facility discharges via Outfall 001 to Wolf Creek. When the weather is below 32 degrees Fahrenheit, the Facility has the capability to discharge directly to the City of Oregon wastewater treatment plant (WWTP). This discharge is not identified in the Ohio EPA NPDES Permit #OH0135666. The Facility is only allowed to discharge from Outfall 001 during the day, while an operator is present. Dan Jackson, Facility staff, performs visual inspections of Outfall 002.
The Facility installed a new stormwater separation system to prevent stormwater from entering the wastewater stream. The front half of the Facility has a retention pond for stormwater, the back half of the property is segregated and does not route to the retention pond. Additional stormwater capital projects are in the planning stage. At the time of the inspection, the Facility's new stormwater separation system was not included in the SWPP given to EPA inspectors for review. The Facility also shared with EPA, during the inspection, that it was investigating installing a dissolved air floatation system (DAF) for further wastewater treatment. The sampling point for Outfall 001 is located at the valve which controls discharge to Wolf Creek. According to the Facility, grab samples are collected by Dan Jackson. The Facility was not, as of the date of inspection, recording the time at which pH samples were being analyzed to document the samples are being analyzed within 15 minutes from the time of collection. The Facility uses Jones and Henry Laboratories to analyze samples. Jones and Henry provide sample containers pre-filled with preservatives, and Dan Jackson collects the samples and transports the samples to Jones and Henry.
Facility/Site Information Location(s) Location/Area/Sub-area Application Fields, Treatment Lagoons, and Outfalls
Tomato and Cabbage Plants
Description
The fields in which wastewater is applied, the lagoons in which land filtered wastewater receives further treatment, and Outfalls 001 and 002.
All processes and equipment associated with the tomato processing plant.
SECTION II - OBSERVATIONS
Location: Tomato and Cabbage Plants
Observation #: JF1-OB-001
Date: 04/24/2025
Facility utilizes a caustic bath to separate skins from the tomatoes. According to the Facility, all floor drains in the production area connect to the wastewater system. The can cooler system recycles water throughout the day, then purges to wastewater at the end of the day. Storm drains in the produce unloading area are connected to the wastewater system.
3 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo(s) 1. IMG_0466.JPG 2. IMG_0465.JPG 3. IMG_0467.JPG 4. IMG_0468.JPG 5. IMG_0469.JPG 6. IMG_0481.JPG 7. IMG_0479.JPG 8. IMG_0480.JPG
Location: Application Fields, Treatment Lagoons, and Outfalls
Observation #: JF1-OB-002
Date: 04/24/2025
Screened wastewater is kept in aeration tanks until full, then discharges to be sprayed in the application fields.
At the time of inspection, Outfall 001 was discharging. Dan Jackson stated that the valve which controls the discharge had begun malfunctioning in early April 2025, allowing some discharge to continuously exit the outfall. At the time of the inspection the outfall was discharging. On May 15, 2025, after the inspection, the Facility provided a photo of the newly installed valve.
Photo(s) 1. IMG_0470.JPG 2. IMG_0478.JPG 3. IMG_0477.JPG 4. IMG_0473.JPG 5. IMG_0472.JPG 6. IMG_0476.JPG 7. IMG_0474.JPG 8. IMG_0475.JPG 9. IMG_0471.JPG
SECTION III - RECORDS REVIEW
Records may not be in sequential order.
Record: Other - Photo of Valve Replacement
Ref #: JF1-RR-006
Reviewed By: Joseph Forth
Facility provided a photo of the replaced valve for Outfall 001.
Record: Other - Safety Data Sheet
Ref #: JF1-RR-005
Reviewed By: Joseph Forth
AOC: No Reviewed Date: 05/15/2025
AOC: No Reviewed Date: 05/15/2025
4 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Facility provided the Safety Data Sheet for the caustic additive for the tomato process.
Document(s)
1. CAUSTIC - SDS.pdf
Record: Other - Lab Chain of Custody Form
Ref #: JF1-RR-004
Reviewed By: Joseph Forth
AOC: No Reviewed Date: 05/15/2025
Facility provided chain of custody record form.
Document(s)
1. nw-lab_007735.pdf
Record: Process Description/Flow Diagram
Ref #: JF1-RR-003
Reviewed By: Joseph Forth
AOC: No Reviewed Date: 05/15/2025
Facility provided product process flow and wastewater flow diagrams.
Document(s)
1. NORTHWOOD Product Process Flow Diagram.pdf 2. NORTHWOOD Wastewater Flow Schematic.pdf
Record: Other - SWPPP
Ref #: JF1-RR-002
Reviewed By: Joseph Forth
AOC: No Reviewed Date: 05/15/2025
Facility provided Stormwater Pollution Prevention Plan (SWPPP) from October 2023.
Document(s)
1. SWPPP Northwood 10-12-2023.pdf
Record: DMR Reports
Ref #: JF1-RR-001
Reviewed By: Joseph Forth
AOC: No Reviewed Date: 05/15/2025
Discharge Monitoring Reports (DMRs) for February, March and April 2025.
Document(s) 1. report (1).pdf 2. report (2).pdf 3. report (3).pdf 4. report (4).pdf
SECTION IV - SAMPLING ACTIVITIES AND ANALYTICAL RESULTS No sampling was conducted.
5 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
SECTION V - AREA(S) OF CONCERN
Area(s) of Concern may not be in sequential order. The presentation of Area(s) of Concern does not constitute a formal compliance determination or violation.
AOC Reference #: JF1-OC-FD AOC:
Opening Conference
The Facility was not, as of the date of inspection, recording the time at which pH samples were being analyzed to ensure the samples are being analyzed within 15 minutes.
AOC Reference #: JF1-OC-FD AOC:
Opening Conference
When the weather is below 32 degrees Fahrenheit, the Facility has the capability to discharge directly to the City of Oregon WWTP. This discharge is not currently listed in the Ohio EPA NPDES Permit # OH0135666.
AOC Reference #: JF1-OC-FD AOC:
Opening Conference
The Facility has not updated their SWPPP to include the new stormwater system mid-2024.
AOC Reference #: JF1-OB-002 AOC:
Location: Application Fields, Treatment Lagoons, and Outfalls
At the time of inspection, Outfall 001 was discharging. Dan Jackson stated that the valve which controls the discharge had begun malfunctioning in early April 2025, allowing a portion of the discharge to continuously exit Outfall 001, including constantly during the inspection.
SECTION VI - CLOSING CONFERENCE AND FOLLOW UP
Closing Conference
The EPA REGION 5 Lead Inspector held a closing conference with Facility personnel at 11:28 AM (ET) on 04/24/2025 for the inspection. During the closing conference, EPA REGION 5 Lead Inspector discussed the observations and Area(s) of Concern identified during the inspection. Observations and Area(s) of Concern have not yet been evaluated for a formal compliance determination.
Follow-Up
6 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
U.S. EPA staff requested documentation of the repair of the Outfall 001 valve on 5/30/2025. On 6/2/2025, U.S. EPA staff requested documentation of whether Hirzel has measured the receiving water flow volumetric rate or received approval from Ohio EPA to exceed a discharge rate of 90 gallons per minute, per cubic feet per second of the receiving stream.
Communication Log U.S. EPA Staff received documents from Jessica Hirzel on 5/20/2025.
SECTION VII - LIST OF APPENDICES 1. Photo Log 2. Document Log
7 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
APPENDIX 1: PHOTO LOG
04/24/2025 - 04/24/2025
Photo #1
04/24/2025 10:20 AM
No CBI
No PII
Tomato and Cabbage Plants
Photo of tomato washing area and peeler feed.
IMG_0465.JPG Photographer: Joseph Forth East
Photo 2
04/24/2025 10:21 AM
No CBI
Tomato and Cabbage Plants
Photo of water spouts to fill tomato trucks
No PII
IMG_0466.JPG Photographer: Joseph Forth East
8 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo 3
04/24/2025 10:28 AM
No CBI
Tomato and Cabbage Plants
Photo of can cooling system.
No PII
IMG_0467.JPG Photographer: Joseph Forth East
Photo 4
04/24/2025 10:31 AM
No CBI
Tomato and Cabbage Plants
Photo of rotary screen.
No PII
IMG_0468.JPG Photographer: Joseph Forth East
9 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo 5
04/24/2025 10:34 AM
No CBI
No PII
Tomato and Cabbage Plants
Photo of aeration tank and solids dumpster.
IMG_0469.JPG Photographer: Joseph Forth West
Photo 6
04/24/2025 10:36 AM
No CBI
No PII
Application Fields, Treatment Lagoons, and Outfalls
Photo of spraying field.
IMG_0470.JPG Photographer: Joseph Forth North
10 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo 7
IMG_0471.JPG
04/24/2025 10:38 AM
No CBI
No PII Photographer: Joseph Forth
Application Fields, Treatment Lagoons, and Outfalls Downward
Photo of wastewater collection pit from spraying field that will be pumped to the lagoons.
Photo 8
04/24/2025 10:40 AM
No CBI
No PII
Application Fields, Treatment Lagoons, and Outfalls
Photo of pond 1 and inlet pipe.
IMG_0472.JPG Photographer: Joseph Forth West
11 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo 9
04/24/2025 10:41 AM
No CBI
No PII
Application Fields, Treatment Lagoons, and Outfalls
Photo of pond 2.
IMG_0473.JPG Photographer: Joseph Forth East
Photo 10
04/24/2025 10:43 AM
No CBI
No PII
Application Fields, Treatment Lagoons, and Outfalls
Photo of pond 4 and discharge valve.
IMG_0474.JPG Photographer: Joseph Forth West
12 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo 11
04/24/2025 10:46 AM
No CBI
No PII
Application Fields, Treatment Lagoons, and Outfalls
Photo of Outfall 001.
IMG_0475.JPG Photographer: Joseph Forth Northeast
Photo 12
04/24/2025 10:46 AM
No CBI
No PII
Application Fields, Treatment Lagoons, and Outfalls
Photo of Outfall 002.
IMG_0476.JPG Photographer: Joseph Forth East
13 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo 13
04/24/2025 10:47 AM
No CBI
No PII
Application Fields, Treatment Lagoons, and Outfalls
Photo of outfall signage for Outfalls 001 and 002.
IMG_0477.JPG Photographer: Joseph Forth East
Photo 14
04/24/2025 10:52 AM
No CBI
No PII
Application Fields, Treatment Lagoons, and Outfalls
Photo of stormwater outfall valve.
IMG_0478.JPG Photographer: Joseph Forth Downward
14 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo 15
04/24/2025 10:57 AM
No CBI
Tomato and Cabbage Plants
Photo of cabbage tumbler.
No PII
IMG_0479.JPG Photographer: Joseph Forth Cabbage Plant
Photo 16
04/24/2025 10:58 AM
No CBI
No PII
Tomato and Cabbage Plants
Photo of cabbage wastewater holding tank.
IMG_0480.JPG Photographer: Joseph Forth Downward, Cabbage Plant
15 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
Photo 17
04/24/2025 11:01 AM
No CBI
Tomato and Cabbage Plants
Photo of tomato pit waste water.
No PII
IMG_0481.JPG Photographer: Joseph Forth Downward, tomato plant
16 of 17
Hirzel Canning Co (0387000242) Inspection Date(s):
04/24/2025 - 04/24/2025
APPENDIX 2: DOCUMENT LOG
Document Type
DMR Reports DMR Reports DMR Reports DMR Reports Other - SWPPP
Process Description/Flow Diagram Process Description/Flow Diagram Other - Lab Chain of Custody Form Other - Safety Data Sheet
Document Name
report (1).pdf report (2).pdf report (3).pdf report (4).pdf SWPPP Northwood 1012-2023.pdf NORTHWOOD Product Process Flow Diagram.pdf NORTHWOOD Wastewater Flow Schematic.pdf nw-lab_007735.pdf
Contains CBI No No No No No
No
No
No
Contains PII No No No No No
No
No
No
Uploaded By Joseph Forth Joseph Forth Joseph Forth Joseph Forth Joseph Forth Joseph Forth
Joseph Forth
Joseph Forth
CAUSTIC - SDS.pdf
No
No
Joseph Forth
Date Received 5/15/2025 5/15/2025 5/15/2025 5/15/2025 5/15/2025 5/15/2025
5/15/2025
5/15/2025 5/15/2025
17 of 17