Document RGzMeXNMd8YQEByX2O0qnoYB

Operation Report Pyranol - Dept. A-246 August - 1963 PRODUCTION SUMMARY Scheduled Actual - 493,532# 493,532# Inventory Downtime 72.30* YIELDS Standard Actual Y.T.D. * Theory on TCB Yield on TTCB - 99.0* No production 96.2* Loss in yield due to reworking Pyranol 1488 to improve resistivity. SIGNIFICANT ITEMS THIS MONTH Quality trouble was experienced with Pyranol 1488 due to low resis tivity. The material was made 4 times to attempt to meet the resis tivity spec, of 3000 x lO^. Tiiis spec is very high and causes difficulty with producing about one batch in three. Resistivity measurements and making high resistivity material is especially difficult during the hot-humid part of the summer. One car was shipped and returned due to contamination after final samples were taken PRODUCT - Pyranols 1st of Mo. Last of Mo. Whse.Stock Dept. Stock - Total - 532,789# 100,000 '635,789' 366,500# 376,200 '"742,700" E. E. Martin ghw 0S\N 296552 STLCOPCB4066465