Document RGvk90y5jyq05VxQ3L4kQEwz
Minnkota Power Cooperative, Inc Milton R Young Station Unt 1 and 2 A14559 013
Rev 2 May 22, 2024
Table 3-1 -- Example MRY Unit 2 Cost Underestimations Summary
Parameter
EPA Hypothetical
800 MW
EPA Assumed MRY U2 Costs
447 MW
Est. Actual MRY U2 Costs
447 MW
Current Hg Compliance (4.0 IIDTTBtu) Cost 1
S2.6 M
$0.3 M
$1.9 M
Current Hg Removed
1,295 lb
77 lb
149 lb
Current C/E (S per lb Hg Removed)
2,004
3,845
12,754
Hg Control System Annualized Capital Cost BPAC Cost @ 5 lb/MMacf M-Prove Cost
Not included S7.5 M
Not included
Not included $0.6 M $0.2 M
$472k 2 $1 3 M 3 $1.6 M 4
Future Hg Compliance (@ 5 lb/MMacf) Cost
S7.5 M
$0.8 M
$3.4 M
Future Hg Removed (EPA Assumed @ 1.2 lb/TBtu) Future C/E ($ per lb Hg Removed)
1,447 lb 5 5,083
110 lb 7,040
216 lb 15,678
Incremental C/E (S per lb Hg Removed)
28,176
14,360
22,217
Note 1 -- EPA example only based on sorbent. EPA assumed current compliance cost includes sorbent and chemical fuel additive. Est. actual apst based on 2023 MRY Unit 2 usage rate & pricing for both sorbent and chemical additive. Note 2 -- Cost of $5.0 million dollars from S&L project database was annualized using a capital recovery factor calculated based on annual interest rate of 7% (pre-tax marginal rate of return on private investment, EPA Cost Manual Section 5) and 20 year evaluation period (EPA Cost Manual Section 6) Note 3 -- Cost based on EPA assumed rate but using 2023 MRY BPAC pricing. Note 4 -- Cost based on 2023 MRY Unit 2 u sage rate & pricing instead of assuming same as sorbent costs. Note 5 -- Based on calculated value for EPA example inlet Hg of 1,542 lb s (current Hg coal content)-- 95 lbs (future emitted amount). However, the EPA example identifies 1,468 lb for the increme ntal cost effectiveness calculation.
Mercury Testing Results for the MATS Residual Risk and Technology Review
Sierra Club FOIA 2025-EPA-04883
14 Si --gr -vt & Lulu/ay
ED_018388_00000327-00028
SC_EVERSPLIT0006337