February 14, 1972 Trip Report
TO FILE
COMPANY CONTACTED:
DATE: FOR GOODYEAR:
FOR MONSANTO:
-3FB2SL J+-.-^s7 BjSJeryV, Hr COrey
B2SIr T. l^ffossage
'1010 E. L. Shlmley
B2SF N. T. Johnson
'"Vf"
T3P D. R. Miller
B2SC J. J. Rodjr/D. E. Roush
B2SD P. W. ^arin
J. R. Creager, Goodyear
J. R. Creager, Dir. of Manufacturing
D. C. Goodland, Mgr. Chemical Plants
Engineering
F. Tully, Director Mfg. Services
V. L. Peterson,. Purchasing
R. Collins, Purchasing
,
M. T. Buccl, Plant Mgr. (Point Pleasant)
J. Coonen, Plant Engr (Point Pleasant)
J. Mally, Mgr. Polyester R & D
E. 0. Wuerch, Mfg. Superintendent
E. j. Burkett, Corporate Engineering
B. C. Johnson, Corporate Engineering
R. K. Orbal, Corporate Englneerinj
C. Hiss, Corporate Engineering
T. L. Oossage, Marktg. Director, Specialty Products
E. L. Shlmley, Regional Manager D. R. Miller, Research Group Leader D. E. Roush, Heat Transfer Specialist C. Paton, Product Manager
HONS 064490
-2-
Introductlon This was the third visit made by the writer (Paten) to Goodyear concerning the conversion of.the heat transfer system at the Point Pleasant polyester plant from ThermlnolR fr-1 to a nonPCB fluid.
December 30< 1971 Visit to Akron where Jack Creager outlined high cost and other problems If plant were shut down In order to drain and change PR-1. At that time Goodyear asked us to evaluate the feasibility of sequential dilution of PR-1 by a non-PCB fluid (e.g. Thermlnol
66). '
January 13, 1972 Visit made to Point Pleasant plant to clarify heat transfer lay out so that feasibility of conversion methods could be carried out. .
Objectives 2/V72 Visit 1. To present Monsanto's opinion of possible conversion methods
based on Goodyear's input. 2. To determine if Goodyear thinks any of Monsanto's evaluations
have enough merit to warrant further study. 3. If #2 IS yes, which conversion method should be pursued and
what needs to be done In order for Goodyear to reach a final decision.
HONS 064491
-3-
Monsanto Presentation
Monsanto had considered three possible conversion methods:
Method
Major Disadvantages
1. Complete drain and refill.
Lost production. Thermal shock to reactors Cost estimate" 1.5-2 W(Goodyear)
2. Incremental draln/top-up with Thermlnol 66. (Gradual dilution of FR-1)
Short life of PR-1/66 blends Unable separate PR-1/66 High refill fluid cost
3. Incremental draln/top-up with Thermlnol 55 - oomplete dilution with Thermlnol 66.
Short life PR-l/55 blends Short life Thermlnol 55>600'F
#1 and #2 were essentially Ooodyear's proposals. #3 was a modi fication of #2, chosen because any dilution method requires a large volume of fluid and Thermlnol 55 is almost $2/gallon cheaper than Thermlnol 66. Furthermore the non-PCB fluids and PR-1 have overlapping boiling ranges making it Impossible to separate PR-1 from the non-PCB fluid so that the latter could be re-usod. Goodyear has experience of Thermlnol 55 at its Scoltsboro, Alabama plant.
Monsanto presented in greater detail a possible conversion pro cedure for #3.
Subject to Goodyear acceptance, Monsanto envisaged the following steps for method #3:
a) Installation of dump tanks and other safety equipment arising from Goodyear's discussions with their Insurers.
b) Conversion method dependent on thorough blend life studies of PR-1 blends with Thermlnol 55 and/or 66.
c) Segregation of the system (as it already is) into two parts: '>'80,000 andv60,000 gallons.
d) Dilute 80 M gallon system with 20 M gallon lots of Thermlnol 55 - incineration of FR-1-rlch drained material - UBage of Thermlnol 55-rich drained material to dilute 60 M gallon system. - convert from Thermlnol 55 to 66 when FR-1 content
around 5-8#. - dilute to 'w 2% FR-1 with Thermlnol 66.
HONS 064492
-4-
e) Dilute 60 M gallon system with Therminol 55 and 66 rich fluid drained from 80 M gallon system.
- incinerate all fluid drained from 60 M gallon
system
f) Estimated time between charges of non-PCB fluid around 2-6 weeks making a total conversion time of 2^ years. (Trying to spread out cost to Goodyear).
g) Without taking back-mixing into account new fluid consump tion estimated at:
Therminol 55 Therminol 66
Total
:220 M gallons :140 M gallons
360 M gallons
Monsanto (D. R. Mlller/D. E. Roush) presented stability data on FR-l/Thermlnol 55, PR-l/Thermlnol 66 and 3-component blends at 620P for seven days under a nitrogen blanket. (These tests are continuing).
MQNS 064493
-5-
Goodyear's Response
1. Goodyear Is six months away from beginning actual change of
PR-1 due to time needed to install dump tanks and other
safety equipment.
'
(Jim Coonen later called me to say six months was minimum with nine months a probability).
2. Goodyear still lean to a dilution of PR-1 with a suitable
non-PCB. They were willing to study use of Thermlnol 55 as
the 'starting" fluid and the idea of using drained fluid
(non-PCB rich) to dilute the other half of their system was
of Interest.
3. Goodyear very quickly ruled out dilution over a 30 month period. They want conversion once begun to proceed as fast as possible.
A. Jim Coonen outlined the following conversion method.
a) Input of non-PCB fluid from 20 M gallon storage tank into 80 M gallon portion at minimum of 10 and maximum of 50 gallons/minute. This means dilution of FR-1 at rate of lb-72 M gallons/day.
MONS 064494
-6-
b) Pumping 1" around 1000 gallons/minute within heat transfer system creating high degree of mixing (hence not diluting KR-1 in cutlet fluid as quickly as would be the case at slower mixing rates).
c) Initial outlet fluid from 80 M gallon portion would be drained to T/Cs for subsequent incineration.
d) As non-PCB content of drained fluid gets to around 75-80# it will be fed to 60 M gallon portion via one or two 8 M gallon tanks at a rate of 10-50 gpm.
e) Filtration was considered between the two "halves" of the heat transfer system to prevent debris being circulated.
f) Goodyear might start at 50 gpm rate and back off to 10 gpm. (They want to minimize thermal shocks to the system.)
5. Goodyear data so far on FR-l/'fhermlnol 66 blends shows "they are out of the woods at 60# Therminol 66".
6. Goodyear want Monsanto to investigate feasibility of Monsanto having a plant heat transfer system where dilution of FR-l with 55/66 could be demonstrated. Alternatively Goodyear may be able to u3e a pilot plant unit.
7. Monsanto/Goodyear need to recalculate fluid requirements for dilution on basis of Jim Csonen's proposed method (assuming perfect mixing).
HGNS 06*495
-7-
Actlons Required Communication Line
1. C. Paton/j. Creager
2. (If #1 is possible) J. Coonen/D. E. Roush
3. D. R. Miller/j. Mally
4. Goodyear 5. D. R. Mlller/J. Mally
6. Goodyear 7. C. Paton/j. Creager
8. D. E. Roush/j. Coonen 9. D. E. Roush/E. J. Burkett
10. D. E. Roush/j. Coonen
Action Item
Availability of Monsanto unit to test PR-1/55-66 dilution.
If yes, CP outline proposed program to JC.
Goodyear furnishes Monsanto with data required from such a demonstration.
Agreement on laboratory tests for PR-1/55 and/or 66 blends.
aoodyear/Monsanto to continue blend tests.
Establish engineering budget.
Isolate and quantify lobollers from PR-1 blends with Thermlnol 55 and 65.
A.I.T. characteristics of lobollers.
Installation of fire protection equipment/dump tanks, etc.
Estimate of fluid volume required for dilution to 10, 5 and 2% PR-1 per j. Coonen proposal. (Should be car ried out by both Goodyear and Monsant engineering).
Investigate in-line filtration to re move debris.
Investigate expansion tank lobollers quantity/precautions re flammability and explosion limits.
Preheating of non-PCB fluid - steam heating of colled T/C - skid-heater at Point Pleasant - ship heated fluid
HONS 064496
11. c. Paton/M. T. Bucci 12. Monsanto 13. D. R. Millei/J.. Mally
14. D. E. Roush/J. Coonen
-8-
Meeting at f.pple Grove to discuss logistics of conversion.
Handle incineration of 400-500 M gallons ol' fluid.
Monitoring change-over - fluid decomposition - PR-1 c entent - system capacity
portable distillation at Apple Grove or Anniston (if degradation during converslon was greater than present side-stream "still could handle).
HONS 064497
9-
G oodyear d e c is io n on co n ve rsio n
m ethods
2/14 2/21 2/28 3/6 3/31 V30 5/31 6/30 7/31 8/31 9/30 10/31 11/30
Cfcdo Cc>Od co c X 01
t-, CO
Pc <f-d oc
fcr
C) <J>
U Cl
MrjOHj
0) <H
> rd
T3 >
oo cd
o
P Ca> E0) Ht-i atDWp
co
*o u
* 4)
cad> o
>>
VO r-i
4)
TJ T5
H 4> 3C
rCHi ctr*d.4 *4> TJ
CU
U)U cH \h
. 3cr
co .1 uid i >>
H I'O*0
c.
3i 04 ,
c 4a)
On this time-table, actual change-over of PR-1 could begin In August at the earliest. If delayed we will run Into fall/wlnter weather which could create problems.
Future meetings will be set up as approrplate.