Document RBreNxNvbrr37NmY447g7kpX
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* *REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12
100
PROTECTION
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
Deep Brook Estates
From:Andrew Spejewski, Inspector
ANDREWDigitally ANsDiRgEWn eSPdE JEbWySK
I
SPEJEWSKI
Date: 2023.02.15 13:45:44
-05'00 '
Thru:Stephanie Tougas, Inspector
To:File
I. Facility Information
A. Facility Name:Deep Brook Estates
B. Facility Location: Park Drive
Acushnet, MA 02743
C. Facility Contacts: Jose Castelo
1815 Acushnet Ave
New Bedford, MA 02746
508-889-1260, jcastelo@castelogroup.com
D. NPDES ID No (s).: MAR1004A8
II. Background Information
A. Date(s) of inspection: February 2, 2023
B. Weather Conditions: clear, dry, near freezing
C. US EPA Representative(s):
Andrew Spejewski
D. State / Local Representative(s): Pat Hannon, Town of Acushnet Conservation
Agent
ED_019088A_00019893-00001
E. Federally Enforceable Requirements Covered During the Inspection: EPA
construction general permit for stormwater
F. Previous Enforcement Actions: No federal actions known.
III. Type and Purpose of Inspection
Unannounced Evaluation of Construction Stormwater Compliance
IV. Facility Description
The facility is a future residential development. It includes a road running east from the
current end of Park Drive extending about 300 yards (" Park Drive "), and an unfinished
road running about 500 yards north from roughly the midpoint of the new portion of Park
Drive, that " Tuckaway Road ").
The site is fairly flat; Tuckaway Road slopes slightly down to the south. Park Drive is
more or less at the level of the surrounding terrain.
Both roads had been cleared and somewhat graded before the start of the current project
(two small stockpiles were observed near the roads with at least several years of weed
growth). A road running east from the north end of Tuckaway Road had been cleared and
graded; according to site personnel this road was not part of the current project (it was
not made clear whether a future phase of the development would use this road)
At the time of inspection, the developer had partially regraded the new section of Park
Drive and Tuckaway Roads, installed storm sewers, and constructed a basin at the east
end of Park Drive. A water line was being installed under the main road, and preliminary
clearing was underway for a basin east of Tuckaway Road.
V. Inspection
Mr. Spejewski and Mr. Hannon arrived unannounced at about 12:30 PM.
A. Opening Conference
Present on site was Nathan Gomes. Mr. Gomes said he was not the owner or the overall
contractor, but hired to do site work only.
Mr. Spejewski explained the purpose of the inspection, presented his credentials, and
gave Mr. Gomes a copy of the Small Business Information Sheet.
Mr. Gomes produced a copy of the SWPPP for the site. Mr. Gomes stated that he had not
been hired to do erosion control inspections under the NPDES permit.
Mr. Gomes explained that the roads had been originally built years ago, before the
current project. Mr. Gomes said that he began site work about August 2022.
2
ED_019088A_00019893-00002
B. Facility Tour
The only cleared areas on the site were the roads, a small staging area near the entrance,
and the stormwater basin area. The roads were rough graded only.
Along Park Drive a trench was being constructed; according to Mr. Gomes it was for
installing water lines.
Mr. Gomes said that catchbasins were installed but closed off. He showed a catchbasin on
Tuckaway Road near the intersection with Park Drive: the basin top was a few inches
above the surrounding dirt, there was a steel plate covering the opening, and filter fabric
had been placed over the opening (under the steel plate).
A little north of Park Drive, a small pool was east of and about ten feet below Tuckaway
Road. There was a channel a couple inches deep eroded into the slope leading down to
the pool, and some signs of sediment deposited in the pool. Mr. Gomes said this wetland
was going to be filled, with replication immediately north of it. There was no sign of
sediment being carried out of the pool to other areas.
A channel with flowing water ran south along the west side of Tuckaway Road. The
channel led to standing water on the west side of Tuckaway Road, which appeared to
drain across the road to the pool east and below Tuckaway Road.
Except at the pool (noted above), Tuckaway Road was generally at or slightly below the
surrounding terrain, with no signs of significant flow off of the road.
Mr. Gomes stated heavy equipment east of Tuckaway Road about halfway to the end was
about to begin clearing trees for a stormwater basin east of the road; he said another basin
would be near the north end of the Tuckaway Road.
A culvert with a moderate flowing stream passed under Tuckaway Road. There was silt
fence around the stream on both sides. Mr. Gomes explained that during storms, the
stream would overflow onto the road, and that he was planning to build up dirt and rock
around the culvert entrance to prevent that.
The north end of Tuckaway Road was below the terrain to the north. A dirt road ran to
the east. The dirt road and area around it had heavy weed growth and did not appear to
have been disturbed in several years.
Park Drive was also near or below the surrounding terrain with no signs of significant
flow off the road. At the east end a large area (at least an acre) had been cleared and
graded. A stockpile was present at the west side of the cleared area, with no signs of
stabilization.
A sediment basin was in the cleared area. Mr. Gomes stated that the basin had
overflowed earlier, but he had built up the walls since then. No stabilization was seen on
the basin or the flat cleared areas surrounding it.
3
ED_019088A_00019893-00003
Mr. Gomes said that hydroseeding was planned soon. Mr. Spejewski asked how the grass
would be established in February. Mr. Gomes agreed it would be difficult to grow.
Sediment was deposited into the flat wooded area east of the basin, but no deposits could
be observed more than about 20 yards from the site.
The group returned to the site entrance and had a short closing conference with Mr.
Gomes.
While leaving the site, Mr. Spejewski observed the condition of the site entrance: A 20-
foot section of gravel and rip - rap was in place, but significant quantities of mud and
sediment had tracked onto the gravel and onto the paved pre - existing part of Park Drive.
D. Closing Conference
Mr. Spejewski confirmed with Mr. Gomes that Mr. Castelo was the owner and had
control of spending at the site, and that Mr. Castelo would be the best person to contact
for follow - up about the site.
Mr. Spejewski and Mr. Hannon thanked Mr. Gomes for his time and departed at
approximately 1:30 PM.
Picture List:
[Note: the camera was set for Eastern Daylight Time, while the inspection took place
during Eastern Standard Time, therefore the timestamps for photos are one hour later than
actual time]
IMG 2883.JPGSWPPP cover page
IMG 2884.JPGSWPPP operator identification
IMG 2885.JPGFacing west to existing Park Drive
IMG 2886.JPGFacing east along Park Drive, about midway point
IMG 2887.JPGFacing north up Tuckaway Road, from Park Drive intersection
IMG 2888.JPG[Inspector camera error, showing Mr. Gomes]
IMG 2889.JPGCatchbasin on Tuckaway Road, with steel plate lifted
IMG 2890.JPGWetland east of Tuckaway Road, slightly north of Park Drive
IMG 2891.JPGWestland east of Tuckaway Road, and slope draining to wetland
IMG 2892.JPGFacing north along west side of Tuckaway Road
IMG 2893.JPGFacing southeast over Tuckaway Road, near midpoint
IMG 2894.JPGInlet to culvert under Tuckaway Road
IMG 2895.JPGOutlet from culvert under Tuckaway Road
IMG 2896.JPGFacing east from north end of Tuckaway Road
IMG 2897.JPGFacing southeast over basin at east end of Park Drive
IMG 2898.JPGBasin east of Park Drive
IMG 2899.JPGFacing north, over outlet of basin
IMG 2900.JPGSediment in woods east of basin
IMG 2901.JPGSediment deposits east of basin
4
ED_019088A_00019893-00004
IMG 2902.JPGStockpile just west of basin
IMG 2903.JPGSite entrance, facing west along existing Park Drive
IMG 2904.JPGDetail, existing Park Drive next to site entrance
*
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.