Document RBJvO7X4D3z1BR6Jm2nBOokz

CHEVRON U.S.A. INC. ENGINEERIN ND MAINTENANCE DEPARTMENT EL PASO, TEaAS SPECIFICATION NO. EP-29'2-A April 22, 1977 Page 1 of 1 PLAINTIFF'S EXHIBIT CHV-748 SPECIFICATION NO. EP-292-A CONTRACT LABOR CHEVRON U.S.A. INC. EL PA SET REFINERY 1.0 SCOPE 1.1 CONTRACTOR shall furnish all^necessary qualified laborers arid equip ment to perform various typ^r of labor work throughout the refinery as authorized and directed by_ the COMPANY. 1.2 Duration of this contract will be for the calendar year 1977. 1.0 GENERAL -i 2.1 CONTRACTOR will abide by the_ rules and regulations as set forth in Refinery Instruction No. 1404, "General Instructions to Contractors Working Within the Refinery", which will be a part of the contract. 2.2 CONTRACTOR will expedite therwork as much as possible. Executing it in a neat, orderly, workmanlike manner. CONTRACTOR will leave work areas neat and clean. 2.3 One or more COMPANY representatives will be assigned to administer the details of the contract and to assign daily work priorities.for a given area within the refinery. 2.4 A time sheet listing each person working and each piece of rental equipment used, 'shall be filled out daily and signed at the end of each shift by the COMPANY representative assigned to the CONTRACTOR. 2.5 CONTRACTOR shall obtain permission daily from a COMPANY representa tive before starting to work^.n any plant. 2.6 COMPANY will furnish without_charge, fresh water, utility air and electricity. 2.7 CONTRACTOR shall use CQMPANY=purchasing department forms GO-111 to requistion material required^for work. The GO-111 form shall he signed by the COMPANY representative before the material is picked up by the CONTRACTOR at the refinery Storehouse. . Chevron BB 015073