Document R2prE7Eg3G9M07ao727ZymZj7

I CENTRAL SAFETY COMMITTEE MEETING OCTOBER 15, 1993 DISCUSSION ITEMS ON AGENDA FIRE RETARDANT CLOTHING: DISCUSSION ON 18SUES RELATED TO FRC, AFFECTED AREAS, WHEN CAN SLEEVES BE ROLLED UP, LIMITED USE GARMENTS, WINTER WEAR, ETC. SAFETY EQUIPMENT REQUIRED AREAS: DISCUSSION ON THE USE OF SAFETY GLASSES AND HARD HATS IN WALKWAYS OF WAREHOUSE. PROPER USE OF SAFETY SHOE ALLOWANCE: DISCUSSION ON POSSIBLE USE OF ALLOWANCE FOR SAFETY EQUIPMENT. THE ~ THIS OTHER THIS IS TO GIVE YOU A GENERAL IDEA OF THE DISCUSSION INTENDED, IF YOU HAVE SPECIFIC QUESTIONS, LET ME KNOW. i VAB.0001187649 TO: JEB, , (jfENp JDO, MAS,/ CMM FROM: CHRIS MARKERSON DATE: AUGUST 23, 1993 SUBJECT: CENTRAL SAFETY COMMITTEE MEETING -/&/26/93 AGENDA TIME: 10:00 DATE: THURSDAY, AUGUST 26, 1993 PLACE: MAIN CONFERENCE ROOM PURPOSE: CENTRAL SAFETY COMMITTEE TING CONTENT: SAFETY STATISTICS VCM AND / D OVEREXPOSURES V.A.S.T./PROGRESS Y PRESENTATIONS UPDATE 30 MINUTE AUDITS AUDIT RESULTS ACTION STEPS 10:00 10:10 10:15 10:25 10:30 11:10 11:20 10:10 10:15 10:25 10:30 11:10 11:20 11:30 ITEMS TO BRING: CALENDER NEXT MEETING: SEPTEMBER 3, 1993 AT :30 A.M. - MAIN CONFERENCE ROOM A * VAB.0001187650 VISTA CHEMICAL COMPANY ABERDEEN CHEMICAL PLANT Central Safety Committee Meeting Month of July, 1993 ON-THE-JOB INJURIES First Aid Cases Medical Cases Restricted Workday Cases Lost Workday Cases Total Cases Employee Hours Current Month No. Freq. 2 9.4 00 00 Current Y.T.D. No. Freq. 2 9.4 00 00 Previous Y.T.D. No. Freq. 1 5.0 00 00 00 2 9.4 00 2 9.4 00 4 1 5.0 . 42,350 42,350 40,053 No. of Days Since Last LWC No. of Days Since Last Recordable 297 37 OFF-THE-JOB INJURIES Total Cases Lost Days CONTRACTOR INJURIES First Aid Cases Med.Treatment Cases Lost Workday Cases 1 3 0 0 0 02 05 01 00 00 8 August 1993 VAB.0001187651 NUMBER OF INJURIES 9 August 1993 A ABERDEEN CHEMICAL PLANT INJURIES (Twelve Month Running Totals) 15- O J'91 A J O J'92 A J O J'93 A J MONTH TOTAL INJURIES --OSHA RECORDABLE VAB.0001187652 9 August 1993 ABERDEEN CHEMICAL PLANT CUMULATIVE RECORDABLE INJURIES A WORST (IMS) MONTH BEST (1808) -A-1889 MONTH Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun TOTALS 1985 1 1 0 2 0 1 2 2 0 0 3 1 13 ABERDEEN OSHA RECORDABLE INJURIES FISCAL YEAR 1986 1987 1988 1989 1990 1991 1992 21 1 1 301 1 21 1 010 0001 002 30001 01 2 100 1 30 00120 1 1 0 1 00 1 00 00000 1 1 1 3000 10 0 101 1 00 0023000 0000001 9 95 9 7 77 1994 0 0 VAB.0001187653 ABERDEEN VCM OVEREXPOSURES ALL DEPARTMENTS _i tu a. 3.5 9 August 1993 4 -*-C*0n*Ua** ABERDEEN VCM OVEREXPOSURES ----------- Monthly Number-----------Vinyl MainL Other Plant Month R NR R NR R NR R NR --Fiscal Year Cumulative NumberVinyl MainL Other Plant R NR R NR R NR R NR Apr May Jun 00010001 10000010 00100010 1 1210032 21210042 21310052 Jul Aug Sep Oct Nov Dec Jan^ Feb Mar Apr May Jun 00100010 00000000 01000001 00000000 00110011 00000000 00000000 10000010 1001001 1 00000000 00 0 00000 00000000 00100010 00100010 01100011 01100011 01210022 01210022 0121 0 022 1 1210032 21220043 21220043 21220043 2 1 2 20043 Jul 1 ) 0 0 0 0 0 1 0 10000010 R * With Respirator NR * Without Respirator VAB.0001187654 9 August 1993 ABERDEEN LEAD OVEREXPOSURES VAB.0001187655 SAFETY PRESENTATIONS ATTENDANCE AS OF 8/26/93 i, AERY ENIX VTM RICK SMITH n PAUL KLEIN f^\ CARLIE DENTON MIKE CARPENTER QjU*. JIM GIBSON <T W JIM STROBLB ST GEORGE FREEMAN^ EARL SMITH Cfj. ALLEN CROW RANDY GANTZ MIKE LUNSFORmDLJ JIM BIGGART BRENT WHITE i KEITH FOGG Premiere DON JACKSON AUSTINy ROBERT MARTIN Houston VELDON ME8SICK TOM GRUMBLES WAYNE HILGERS JANICE MECKLENBURG RON BAUER ERIC MEYER - POS8IBLE ABERDEEN MLC, DAM, JD0,(EE^) SCH, JME, JEN, TLC, JGR, FIVE H56rLY, OTHERS? MAS, CLW, RAC, VAB.0001187656 AUGUST 26, 30 MINUTE AUDIT SCHEDULE AREA VINYL - OLD MODULE AUPITQRg CMM, SJV, DAM MAINT./UTIL. - BOILER HOUSE & WATER PLANT RWS, JEN COMPOUND - PI BUILDING JEB, MAS, JME OTHER - LAB JDO, TLC, SCH A * * VAB.0001187657 TO: ^PUST SJV, JEB, JME, TLC, SCH, DAM, JEN, JDO, MAS, CMM FROM: CHRIS MARKERSON DATE: JULY 9, 1993 SUBJECT: CENTRAL SAFETY COMMITTEE MEETING - 7/16/93 TIME: DATE: PLACE: PURPOSE AGENDA 8:00 FRIDAY, JULY 16, 1993 MAIN CONFERENCE ROOM CENTRAL SAFETY COMMITTEE MEETING CONTENT: SAFETY STATISTICS VCM AND LEAD OVEREXPOSURES PLANT JEWELRY POLICY CONFINED SPACE ENTRY PROCEDURE S.A.F.E. ACTION STEPS 8:00 - 8:15 8:15 - 8:20 8:20 - 8:45 8:45 - 9:15 9:15 - 9:45 9:45 - 9:50 ITEMS TO BRING: CALENDER COMMENTS ON ATTACHED POLICIES AND PROCEDURES A VAB.0001187658 VISTA CHEMICAL COMPANY ABERDEEN CHEMICAL PLANT Centra] Safety Committee Meeting Month of June, 1993 ON-THE-JOB INJURIES First Aid Cases Medical Cases Restricted Workday Cases Lost Workday Cases dr l --Toi tal C ases ^ n-- Employee Hours F.............................................. ' .... 1 1 Current Month ... i. .................. '1 j ! Current I Y.T.D. --------------------- 11 Previous Y.T.D. i No. Freq. No. Freq. No. Freq. 1 ' 5.3 ! 16 1 b. ( 0 j 0 14 j; 2 iL |fi 10.6 i |j 4 *4 6 ii________I __________ 1i________ !i ; |0 j 0 11 1.7 r-i rr j * W 0.4 P 3 | 15.3 ! 27 11.3 22 4 3 , ; 0 29 8.7 1.6 1.2 1 0 11.5 37,861 n, 477,454 i 1 503,642 No. LWC -- ' of Days Since Last 1 - L. 1L -. r i ; i |1 No. of Days Since Last i Recordable 266 6 ; OFF-THE-JOB r J................... \ Total Cases _iu INJURIES Lost Days --r- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0| 7 0 33 CONTRACTOR INJURIES 1" " ....... 1 1 1' ' First Aid Cases Med.Treatment Cases Lost Workday Cases 1-- 1 0 0 0 1 1 0 6 41 3 ... 0 0 7 July 1993 VAB.0001187659 NUMBER OF INJURIES 7 July 1993 ABERDEEN CHEMICAL PLANT INJURIES (Twelve Month Running Totals) Q" * "1 ii.< i i i r~i r i \ i i i i t i m t i < i < i < ^ i1 i..i J O J'91 A J O J'92 A J O J'93 A MONTH TOTAL INJURIES OSHA RECORDABLE * VAB.0001187660 ABERDEEN PLANT OSHA RECORDABLE INJURIES 4_------------------------------------------------------------------------------------------- T July 1993 Jui Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals UCL (48 Month) Average (48-Month) Current Month 1987 1 2 0 0 1 0 1 0 3 1 0 0 OSHA RECORDABLE INJURIES 1988 _____ FISCAL YEAR___ 1989 1990 1991 3 0 0 1 1 0 1 0 0 1 0 0 1992 1993 0 0 0 2 1 1 0 1 1 0 3 2 VAB.0001187661 7 July 1993 ABERDEEN CHEMICAL PLANT CUMULATIVE RECORDABLE INJURIES 14 MONTH WORST (1865) --k- BEST (1888) ~Ar 1883 MONTH 1985 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun 1 1 0 2 0 1 2 2 0 0 3 1 TOTALS 13 ABERDEEN OSHA RECORDABLE INJURIES FISCAL YEAR 1986 1987 1988 1989 1990 1991 1992 21 1 1 301 121 1010 0001 002 3000 1 0 1 2100 1 30 001201 1 0100 100 00000 1 1 1 3000 1 0 0101 100 0023 000 000000 1 1993 0 0 0 2 1 1 0 1 1 0 3 2 VAB.0001187662 I- ABERDEEN VCM OVEREXPOSURES ALL DEPARTMENTS net-(Monii) -4-- Awwb>(WMdi<0 CunrwtMonMi ABERDEEN VCM OVEREXPOSURES Month Monthly NumberVinyl Maint Other Plant R NR R NR R NR R NR Fiscal Year Cumulative Number Vinyl Maint. Other Plant R NR R NR R NR R NR Feb Mar Apr May Jun 00200020 00000000 000 10001 1 00000 1 0 00 10001 0 1 120003 1 1 120003 1 1 12 1 0032 2 1 21 0042 2 13 1 0052 Jul 0 0 1 0 0 0 1 0 Aug 00000000 Sep 0 1 0 0 0 0 0 1 Oct 0 0 0 0 0 0 0 0 Nov 001 1001 1 Dec 00000000 Jan'93 0 0 0 0 0 0 0 0 Feb 1 0 0 0 0 0 1 0 Mar 1001001 1 Apr 0 0 0 0 0 0 0 0 May 00000000 Jun 0 0 0 0 0 0 0 0 00 1 000 1 0 00 1 000 1 0 0110001 1 01 10001 1 01210022 0 1 2 1 0022 0 1 2 1 0022 1 1210032 2 12 20043 2 1 220043 2 1 220043 2 1 220043 R = With Respirator NR = Without Respirator VAB.0001187663 4 r 7 July 1993 ABERDEEN LEAD OVEREXPOSURES -f UCL {46Monti) MONTH -4- Avfaqt (40Monii) Hlh Currant Monii mm * VAB.0001187664 DRAFT To: All employees From: Chris Markerson Date: Subject: Plant policy on jewelry Attached Is the plant policy on jewelry# which Is effective This policy has been developed# not In response to a singlW Incident alone# but based on the frequency of jewelry related close calls#'and minor injuries. This policy was developed with an understanding of the value jewelry has to many people# particularly wedding rings# but is being Implemented based on the value we each have for our fingers# ears# and other body parts. Your cooperation with this policy is appreciated. VAB.0001187665 DRAFT JEWELRY POLICY PURPOSE To communicate the Aberdeen plant's position on jewelry; defining those articles of jewelry which are not allowed in the Vista Aberdeen facility. SCOPE: This policy applies to all personnel entering the Vista Aberdeen facility. This includes all Vista Aberdeen personnel, contractors, and visitors as specified in the policy. POLICY: In the workplace environment, jewelry has proven to be a source of injuries, therefore it is the policy of Vista Chemicals, Aberdeen plant, that specific types of jewelry shall not be worn in the Aberdeen facility. Those articles of jewelry which shall not be worn includes * rings * loop type * dangling earings which extend below the earlobe * any other jewelry item which supervision judges to be a hazard Jewelry items, such as wrist watches, chains / necklaSes worn inside the shirt, and studded earings are generally acceptable. As stated, this policy applies to all persons in the Vista Aberdeen facility; the exception to this statement are those visitors who's business is limited to meetings only, and who will not go beyond the administrative office areas. f PP mm mmmm p VAB.0001187666 To From Calculation Sheet Made By ______________ Date __________________ Page of V3-20G-S i Job No. Title _____________________________________ VAB.0001187667 TO: WS7 JEB, JME, TLC, SCH, DAM, JEN, JDO, CMM FROM: CHRIS MARKERSON DATE: JUNE 8, 1993 SUBJECT: CENTRAL SAFETY COMMITTEE MEETING - 6/11/93 AGENDA TIME: 1:45 DATE: 11, 1993~~-- PLACE: MAIN CONFERENCE ROOM PURPOSE: CENTRAL SAFETY COMMITTEE MEETING CONTENT: SAFETY STATISTICS VCM AND LEAD OVEREXPOSURES SAFETY WORK ORDERS INVESTIGATION ACTION ITEMS AUDIT LOG REVIEW AUDIT ACTION ITEMS DRILL RECOMMENDATIONS S.A.F.E. PROGRAM ACTION STEPS ITEMS TO BRING: CALENDER 1:45 - 2:00 2:00 - 2:10 2:10 - 2:15 2:15 - 2:30 2:30 - 2:35 2:35 - 2:45 2:45 - 2:55 2:55 - 3:20 3:20 - 3:30 VAB.0001187668 VISTA CHEMICAL COMPANY ABERDEEN CHEMICAL PLANT Central Safety Committee Meeting Month of April, 1993 ON-THE-JOB INJURIES First Aid Cases Medical Cases Restricted Workday Cases Lost Workday Cases Total Cases Current Month No. Freq. 00 0 0 0 0 Current Y.T.D. No. Freq. 5 3.7 2 1.5 3 2.2 Previous Y.T.D. No. Fre<a. 9 6.2 1 0.7 2 1.4 00 1 0.7 0 0 0 0 11 8.2 12 8.3 Employee Hours 37,653 269,799 288,820 No. of Days Since Last LWC No. of Days Since Last Recordable 205 ' 37 OFF-THK-JOB INJURIES Total Cases Lost Days CONTRACTOR INJURIES First Aid Cases Med.Treatment Cases Lost Workday Cases 0 13 0 0 0 * 4 69 0 1 0 6 41 3 0 0 4 May, 1993 VAB.0001187669 DATE 10/23/91 12/17/91 2/12/92 6/10/92 ABERDEEN PLANT RECORDABLE INJURY SUMMARY NAME FY1992 DEPARTMENT CLASS. L. REA MAINTENENCE RWC L. THREADGILL MAINTENANCE RWC T. STATEN MAINTENANCE MTO C. DAVIS COMPOUND MTO SPRAIN - ANKLE T BURNS - HANDS LACERATION - HEAD CONTUSION - WRIST DATE 10/07/92 10/29/92 11/25/92 12/03/92 02/02/93 03/24/93 NAME B. MCALLISTER A. PETTUS C. REED J. EASTMAN F. PHILLIPS J. WHITE FY 1993 MAINTENANCE COMPOUND COMPOUND YARD YARD MECHANICAL LWC RWC RWC MTO MTO RWC CONTUSION - LUNG T BURNS - LEGS CONTUSION - LEG T BURN - HAND LACERATION - LEG TENDONITIS - LEG VAB.OOOl187670 NUMBER OF INJURIES 4 May 1993 ABERDEEN CHEMICAL PLANT INJURIES (Twelve Month Running Totals) 30 25- 20 15- 10- 5- il O J'91 A J O J'92 A J O J'93 A MONTH TOTAL INJURIES OSHA RECORDABLE VAB.0001187671 ABERDEEN PLANT OSHA RECORDABLE INJURIES 4 May 1993 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Totals UCL (48 Monti) Average (48Month) -**- Current Month 1987 0 1 0 1 0 3 1 0 0 1 1 0 OSHA RECORDABLE INJURIES 1988 FISCAL YEAR 1989 1990 1991 0 0 1 0 0 0 0 2 0 1 1 1 1992 1993 2 1 1 0 1 1 0 s VAB.0001187672 4 May 1993 ABERDEEN CHEMICAL PLANT CUMULATIVE REOOnJABLE INJURIES 14 MONTH | -ME- WORST (1965) -4-- BEST (1982) --1903 MONTH Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep TOTALS 1985 1 0 1 2 2 0 0 3 1 2 1 0 13 ABERDEEN OSHA RECORDABLE INJURIES FISCAL YEAR 1986 1987 1988 1989 1990 1991 1992 3 2 0 0 0 1 0 0 0 1 2 0 1993 2 1 1 0 1 1 0 VAB.0001187673 4 May 1993 ABERDEEN CHEMICAL PLANT TOTAL INJURIES 12-MONTH RUNNING TOTALS I Straina/Spraine (4.0%) Other (4.0%) Injuries (12.0%) Bruises (16.0%) v \Y' V'-Vi' V AX'\ -. = " ?' -v'^nV.W'v \\ ` ; V: 'll =- \ V .. S '! \ i. \ Bums (16.0%) & Abrasions (46.0%) * VAB.0001187674 4 May 1993 ABERDEEN CHEMICAL PLANT OFF-THE-JOB INJURIES 12-MONTH TOTAL INJURIES N M J N M J N M JNM J*80 M 8 J'BI M 8 JU2 M 8 J*83 mm1 1 INJURIES DAYS LOST VAB.0001187675 ABERDEEN VCM OVEREXPOSURES ALL DEPARTMENTS *1 S May 1993 -S-UCL(48Mutfi -4-Awmi (WManH -ME- CiiwntMorth ABERDEEN VCM OVEREXPOSURES ....... Monthly Number---- Vinyl Main! Other Plant Month R NR R NR R NR R NR --Fiscal Year Cumulative Number-- Vinyl Maint Other Plant R NR R NR R NR R NR Dec Jan*92 Feb Mar Apr May Jun Jul Aug Sep 00000 00000 00200 00000 00010 1 0000 00 1 00 00 1 00 00000 0 1 000 000 000 020 000 00 1 010 010 010 000 00 1 1 100001 1 1 10000 1 1 1 120003 1 1 120003 1 1 12 10032 2 1 2 1 004 2 213 10052 214 10062 214 10062 224 10063 Oct Nov Dec Jan'93 Feb Mar Apr 00000000 001 1001 1 00000000 00000000 1 00000 10 1 001 001 1 00000000 00000000 001 1001 1 001 1001 1 001 1001 1 101 10021 201 2003 2 201 20032 m = with fUNUHFflta? NR = wttBout RainimtoF VAB.0001187676 ABERDEEN PLANT VINYL CHLORIDE MONOMER OVEREXPOSURE SUttiARY FY 1992 DATE 2/17 2/17 4/1 5/9 6/16 7/10 9/14 JOB SHIFT MECHANIC DAY MECHANIC DAY MECHANIC DAY OU "A" OP NIGHT MECHANIC DAY MECHANIC DAY CHF. OP. DAY SAMPLE 3.02 5.98 6.9 3.4 1.06 1.8 1.9 RESP. NO NO NO YES YES YES NO TASK CHANGING SPRAYHKAD - 745 RX * CHANGING SPRAYHKAD - 745 RX BLANKED D-500 CONDENSER CHANGING VCM FILTERS REMOVED BLANK FROM REGOV. LINE CHANGING OUT 903 COMPRESSOR UNKNOWN FY 1993 11/15 11/19 2/24 3/3 3/15 3/25 MECHANIC MECHANIC SHFT SUP MECHANIC OPERATOR MECHANIC DAY DAY DAY DAY A DAY 25.8 1.5 21.33 11.7 6.9 2.0 YES NO YES NO YES NO RMV/RPLC RAM VALVE ON D400 CHG. RX SEAL ON 742 OPENED D600 RX - HYDRO LIQ. VCM LINE, WRKD ON CORKEN CHNG RING SEAL H20 FILTERS UNKNOWN VAB. OOO1187677 S May 1993 * ABERDEEN LEAD OVEREXPOSURES MONTH UCLtfSMartN -4- Awwg> (4ilonl) HK- CuwnHifanli VAB.0001187678 ABERDEEN PLANT LEAD OVEREXPOSURE SUtMARY -I FY 1992 DATE JOB SHIFT SAMPLE EEL RRSP. 2/17 LH.3 CMPDR. DAY 81.5 33.3 YES CLEANING BLENDER 2/19 OOIDR-WEIGH DAY 90.1 33.3 YES WEIGHING LEAD MAT. 3/4 OOLOR-WEIGH DAY 58.8 38.1 YES WEIGHING LEAD MAT. 4/1 CODOR-WEIGH NIGHT 56.8 50.0 YES WEIGHUNG LEAD MAT. 5/8 COIOR-WEIGH DAY 52.6 44.4 YES WEIGHING LEAD MAT. 5/26 LN.l CMPDR. DAY 3983.5** 33.3 NO NONE KNOWN 6/15 COLOR-WEIGH DAY 72.1 36.4 YES WEIGHING LEAD MAT. ** DOSIMETER HAS PUT OH A TABLE NEAR LINE #1 AND LEFT OVERNIGHT. IT MAY HAVE BEEN TAMPERED WITH. FY 1993 VAB.0001187679 TO: C. H. MARKERSON FROM: DATE: J.B. AUTREY MAY 11, 1993 SUBJECT: SAFETY RELATED WORK ORDERS The status of the safety related work orders prior to FY93 is as follows: Waiting on Approval - 8 Complete _ rfz\ In-Progress The safety related work orders for April, 1993, is as follows: Waiting on Approval - 0 Complete __ 6 In-Progress -2 8 The safety related work orders for FY93 is as follows: i Waiting on Approval - 0 * Complete _ 31 In-Progress -2 ~~33 VAB.0001187680 t % VISTA CHEMICALS PLANT 05/04/93 08:03:28 PA6E 2 department 003 I0RI URDER SEARCH REPOST VQfijC ORDER NCI STAT WRX ORDER DESCRIPTION EQUIPMENT RED SUP LOCATION REC DATE 93 01AP5A C 93-OU49HMO AA REPAIR STEAM LEAR OK LINE TO EAST RILL IN SC LAB. 42MW 770000 AEG-- AEG JON LA-1`*002 VA1l IiVAJJtifJl?J 04/23/93 4A - VAB.0001187681 4 i 4 r 4 VISTA CHEMICALS PLANT 05/04/93 08:03:28 PACE 4 DEPARTMENT 008 DORK ORDER SEARCH REPORT WORK ORDER NO STAT Ml ORDER DESCRIPTION EOiilPKENT REO SUP LOCATION REC DATE P 93-0U533-000 AA REPAIR SHORE DETECTOR LOCATION US IN N.E. VHSC 640000 CH FDA NA- - 04/27/93 1 -f VAB.0001187682 * VISTA CHEMICALS PLANT 05/04/93 DEPARTMENT Oil SOAK ORDER SEARCH REPORT mi OWES NO STAT NOR! ORDER DESCRIPTION C 93-01*592-000 AA REPAIR THE EHERSENC? LI6HT ON IALL VEST OF 12 08:03:28 PAGE 4 EfliilPHENT * 420050 RE6 SOP LOCATION CAC FDA HA- - REC DATE 04/30/93 VAB.0001187683 VISTA CHEMICALS PUNT 05/04/93 08:03:26 PAGE 1 DEPARTMENT 055 mt ORDER SEARCH REPORT m ORDER m STAT RQRK ORDER DESCRIPTION 4 P 92-012588-000 AA REPAIR THE IECR UNDER THE 500 SERIES SILOS-- e 93-014910-000 AA INSULATE THE STEAK PIPIN6 AT THE P.A. UNLOADING EQUIPMENT SEC SUP LOCATION 090000 420000 - BillIK ___________ IBS CAC NA- LDH 6AH NA- m---- FDA------ NA---- OtU----foil-----OH 001 m---- GAR------ NA---- REC DATE IV/1J/ M 07/22/92 12/30/92 03/05/93 03/31/03 04/00/93 VAB.0001187684 VISTA CHEMICALS PLANT 05/04/93 06:03:28 PAGE 9 DEPARTMENT 08V DORK ORflER SEARCH REPORT H8RK ORDER NO STAT MRX ORDER DESCRIPTION EOOIPHENT REfl SUP LOCATION i P 92-012441-000 AA INSTALL FIRE EXTIWHISKERS ON TOP OF 410 t 417 SILO 440000 C 91-010354-000 AA REPAIR CMKtSTIBLE GAS DETECTORS 440000 CN FDA NA- TIN FDA NA- - REC DATE 07/13/92 04/21/93 VAB.0001187685 VISTA CHEMICALS PLANT 05/04/93 DEPARTHENT 090 U8RK ORDER SEARCH REPORT WORK ORDER NO STAT IGRX ORDER DESCRIPTION 08:03:28 PASE 10 EQUIPMENT RED SUP LOCATION REC DATE VAB.0001187686 ? I. VISTA CHEMICALS PLAMT 05/04/93 08:03:28 PAGE il DEPARTMENT 091 MORA ORDER SEARCH REPORT NORK ORDER NO STAT VOU ORDER DESCRIPTION EMIIPNENT REfl SUP LOCATION C P3-0UW4-000 AA UNPU6 VAODBN STSTER LINE IT TIE SEII-DOLI LEAD 93 01AAID mm 770000 tfOOOf ID m na- - REC DATE wmnj 04/30/93 TA jTirniflmIVi At Ml # fTTTTTB .i . * 4 VAB. OOO1187687 VISTA CHEMICALS PLANT 05/04/93 08:05*26 PAGE 12 DEPARTMENT 094 WORK ORDER SEARCH REPORT HORK ORDER NO STAT ROM BRIER DESCRIPTION EQUIPMENT REQ SOP LOCATION REC DATE 430/4* P 93-014257-000 AA CHECK AW CALIBRATE HONEYHELL - NEK WHILE ft? AViVllw*AWJI VATAVA OJBtt 570000 mm C 93-014304-009 AA REPAIR CAUSTIC LEAK AT CHECK VALVE ON DISCHARGE OF 770000 IFN FDA NA- - AGP----- FBA--- NA-------- OCP FHF NA- - 03/24/93 04/05/93 *i un im 04/08/93 VAB.OOOl187688 VISTA CHEMICALS PUNT 05/04/03 OEPARTHENT m HORX QR9ER SEARCH REPORT VORK ORDER NO STAI VGfil ORDER DESCRIPTION C P2-011026-000 AA INSTILL I SAfETT 5I6N NORTH OF 0-741 RX 08:03:28 PAS 14 EOUIPHENT REO SUP LOCATION RECMTE 316000 m NA CAC NA- - MTCJ2TLTIvXTLTIr 44/00m VAB.0001187689 I4 VISTA CHEMICALS PLANT 03/04/93 DEPARTMENT 097 MORI ORDER SEARCH REPORT V8RK ORDER MO STAT MORI ORDER DESCRIPTION C 93-01*024-940 AA REPAIR LEAK OH THE CAUSTIC U&0A9IN6 LIME 93 0USS2 3 016572 000 08:03:28 PA6E IS EOUIPMEMT RE9 SUP L0CATI0H REC DATE 770000 mm mm mm J0H 6AR TI--101 03/10/93 ai m/Bi TuTvrTtr Aimaun VII AVI IJ AIUf M191XIffifl-- -f VAB. OOO1187690 + - . ' VA&;V :> * vV " H /ISM CIOICALS PLAICT M/01/93 08:02:0$ PISE 5 RCMRTRENr 003 VOftK OSIER SEI8CH REPORT ROK ORDER NO STIT 8081 OtOEl KSC8IPTI8N 92-019798-000 80 INSTILL IAN8IT RINSES ON THE I0TIM Of 9-300 II 02*010709-000 H INSTILL UNRIT RINSES ON IRE I0TTN OF 9-000 81 02-010800-000 II INSTILL OMNI! RINSES IN THE WITH Of 9-300 81 92-010101-000 80 INSTILL IIN8IT RINSES ON TRE 80TTW Of 1-000 81 EIRIPRENT 8E0 SUP L8CITI0N 050MO 050000 030000 030100 * FRF SIR 81--300 FRF SIR 81--000 F8F SIR 81--300 FRF m 81--100 NEC SITE 03/23/92 03/23/92 03/23/92 03/23/92 Ujk * ta* * VAB. OOO1187691 iU CHEHICALS PLANT 04/01/93 06:02:03 FA6E A PARTNCHT 094 mi OROER NO * i* 12-010602-000 12-010103-000 12-010604-000 12-010105-000 STAT VA VA VA VA VORK 6RKR SEARCH REPORT * I6RE OSIER IESCRIPTI6N + INSTALL RANVAT RINSES OK IRE B61T6I OF 1-741 RX INSTALL KANVAT RINSES ON THE IOTTOI OF 1-742 RX INSTALL KAMMY RINSES ON IRE MTTM OF 1*743 RX INSTALL KANVAT RINSES ON THE IOTTM OF 0*744 RX * EOUIPHENT * 450741 450742 430743 430744 REO SOP LOCATION FVF SAN RX--741 FVF SAK RX--742 FVF SAN RX--743 FVF SAK RX--744 REC IATE 03/23/92 03/25/92 03/25/92 03/25/92 VAB.0001187692 Pige No. 04/11/93 1 ACCISENT NURIER RATE ACCI DENI IECOKRENAAIION ACC1BEHT INVESTIGATION RECQHENOATIONS STATUS REPORT STATUS ESTIMATED COUPLET ION RESPONSIIILITT DATE 91NR2 ft 03/09/91 E. INCINERATOR REVIEH CONTROL ROOM PRESSURIZATION FIRE lORING AN ERERRGENCT n PROCEDURE IS RUNG CHANGED AND A JEN/OAR SHUT-OFF 10ITON IS KING INSTALLED IN THE CONTROL ROOM. 91NH3 00/14/91 BULK TRAILER RUPTURE REVISE A IHPLERENT A PLAN TO RESTRICT COHPOUNI COUPLETE, LIRE AREA IN ACCESS TO BULK TRAILER UNLOADING AREAS PROGRESS TO OPERATORS ONLY. TOO 92HR1 02/27/92 0-700 EVAC. VALVE HALfUNCTION AS VALVES IECORE AVAILABLE, IN PROGRESS R1SASSERILE AND ASSURE THAT INOTCATOR ARHS ARE ON STERS. OAR 92NR1 02/27/92 0-700 EVAC. VALVE HALFUNCTION PRASE OUT IKE 722 ACTUATORS REPLACE VITH 723 ACTUATORS. IN PR06RESS OAH // 92NH1 02/27/92 0-700 EVAC. VALVE MALFUNCTION INSTALL A PRESSURE SVITCH AND INTERLOCK ON EACH EVAC. CHARIER. CONSTRUCTION IN PROGRESS JEN/JDO 9ZNR2 ft 04/24/92 P-1 TRANSFER EVALUATE PIPING SPECIFICATIONS TO LINE CHECK IETERRINE IF EXISTING PIPING IS VALVE FAILURE. ACCEPTAILE FOR THE APPLICATION. COMPLETE, ROOTFICATIONSIN PROGRESS JEN ft If 92NH4 ft ft 09/00/92 PLASTICIZER REVISE PLASTICIZER UNLOAOING PIPING SO IN PROGRESS - LOV PRIORITY UNLOADING LINE THAT NO LINE CAN IE BLOCKED IN VHEN PRESSURIZATION FULL OF PLASTICIZER. JEN 92NN4 If 09/00/92 PLASTICIZER CONIUCT A PLANT-HIDE SURVEY TO COMPLETE FOR CORPOOND AND UTILITIES, 0NL0A0IN6 LINE IOEMTIFT AMD ADDITIONAL LIOUIO-PACKED VINYL TO PERFORM PRESSURIZATION LINES THAT HAY EXIST IK OTHER PARTS OF THE PLAN!. JDO ft 00/01/93 00/01/93 04/01/93 04/01/93 ft 00/01/93 it 03/01/93 It It ft It 10/01/93 ft 03/31/92 VAB.0001187693 Pag* No. 06/! 1/93 2 ACCIDENT NUMBER DATE ACCIDENT RECOMMENDATION ACCIDENT INVESTIGATION RECOMENDATIONS STATUS REPORT STATUS ESTIMATED COUPLETION RESPONSIBILITY DATE 93LT1 10/07/92 I. MCALLISTER RETROD fOR SECURING DEVELOPED AND IN PRACTICE RUT NEEDS TO MU LOST TINE A LIFT TRUCK FOR RA1NTENANCE. IE WITTEN INJURY 93LT1 10/97/92 I. NCALLISTER IETERNINE THE MEANS OF CONTROL IMPLEMENTED PROCEDURE. NOT NRITTEN. LOST TIRE RE001RED TO POSITIVELY RESTRAIN INJURY MOVEMENT OF EQUIPMENT DURING AUTOMOTIVE MAINTENANCE IN VHICK THE EQUIPMENT'S ENGINE IS RUNNING AND AN OPERATOR IS NOT IN THE NORMAL OPERATOR POSITION. DAN if 93LT1 10/07/92 I. MCALLISTER LOST TIME INJURY REVIEU EliSTING PLANT POLICIES AND PRACTICES CONCERNING FORK LIFT OPRATIONS TO ENSURE THAT TNEY ADDRESS SHUTD0VN OF THE ENGINE NHENEVER THE OPERATOR LEAVES THE DRIVER'S SEAT. IN PROGRESS CRN 93LT1 10/07/92 1. MCALLISTER DETERMINE THE NEED FOR THE HYDRAULIC LOST TIME LIFT. INJURY COMPLETE, TO BE REPLACED DAN // It 93LT1 19/97/92 B. MCALLISTER LOST TIME INJURY ESTABLISH A FORMAL FORK LIFT IN PROGRESS INSPECTION PR068AN FOR ALL PERSONNEL NHO MAY INSPECT A FORK LIFT. PR06RAM MUST INCLUDE DOCUMENTATION, RECORDS RETENTION, AND TRAINING REQUIREMENTS AND BE CONSISTENT KITH OSHA REGULATION CONCERNING LIFT TRUCKS. BAR 93LT1 19/07/92 D. MCALLISTER DEVELOPE FORMAL PROCEDURES FOR IMPLEMENTED LOCKOUT PROCEDURE, NOT LOST TIME PERFORMING MAINTENANCE UORK OK FORK VRITTEN. INJURY LIFTS. TRAIN ALL EFFECTED EMPLOYEES. DAM // // 06/01/93 06/01/93 ft 96/39/92 06/91/93 t/ ft 06/91/93 96/01/93 /I VAB.0001187694 Piqe No, 06/11/93 3 ACCIDENT HUNGER DATE ACCIDENT REC8HHENDATION ACCIDENT INVESTIGATION RECONENOATIONS STATUS REPORT STATUS ESTIMATED COMPLETION RESPONSIBILITY IATE nm\ 93NHI 93NR2 nm // // ll/2m CNAtLES KO SURVEY OTHER TRAFFIC AREAS WERE C8NTISIW T8 SIMILAR PROBLEMS COULD OCCUR. RAKE LEO * SUP MBDIf ICAITRNS AS NEEDED. IN PROGRESS - CORPOW, OTHERS NEEDED Ml's 11/15/92 CHARLES REED CONTUSION TO LEO - SUP REV1EI THIS INCIDENT UITR THE IN PROGRESS DEPARTMENT AW PLANT. EMPHASIZE AHARENESS OF POTENTIAL PROHERS AND THE NEED TO RELOCATE SAFETY DEVICES TO THEIR ORIGINAL LOCATION. Ms 12/03/92 PRTRAUC ANHYDRIDE SPILL - JERRY EASTRAN RTO REVIEU PROPER PROCEDURES FOR REPORTING COMPLETE OF ALL INJURIES. RH's 12/03/92 PHTHAUC ANHYDRIDE SPIU - JERRY EASTRAN RTO REVIEU PHTHAUC ANHYDRIDE AND CAUSTIC IK PROGRESS HSDS FOR FIRST AID TIEATRENT AND SPILLS, TRAINING PACKET TO IE PROVIDED TO SUPERVISOOS. CNR / SUPS. // // // 05/01/93 03/01/93 03/01/93 04/01/93 93HR4 93HH5 // // 02/02/93 FREDDIE CORRMICATE TO ALL EMPLOYEES THE IN PROGRESS PHILLIPS - RTO IRPORTANCE AND REOU1XERENT FOR: PROPER PLANNING OF ALL JOIS, SELECT ION OF THE CORRECT TOOL FOR THE JG1, AND TAKING THE NECESSARY TIRE TO PERFORN ALL JOIS IN THE SAFEST POSSIILE RANKER. 93HH5 // OH's 04/01/93 SUPERVISORS 06/30/93 SUPERVISORS 06/30/93 VAB.0001187695 Page No. 06/11/93 1 REVIEW NUMBER REVIEW NAME -f LAST REVIEW DATE ABERDEEN PLANT SAFETY REVIEW LOG ACTION STEPS TAKEN? FY90 FY91 FY92 FY93 FY94 FY95 FY96 90-1 CATALYST FREEZERS APR 93 YES 90-2 REACTOR SEAL OIL SYSTEM MAY 90 YES 90-3 WASTE STORAGE MAY 90 YES 90-4 EXPLOSIVE GAS MIXTURE SEP 92 MONITORS YES 90-5 CATALYST INJECTION POTS MAY 90 YES 90-6 RUPTURE DISK INSTALLATION FEB 90 YES 90-7 PLANT CHLORINE SYSTEMS SEP 92 YES 90-8 LADDER PROGRAM MAY 90 YES 90-9 VCM UNLOADING SYSTEM MAY 90 NO 90-10 LEAD IN THE LAB SEPT 90 YES 90-11 HEARING SAFETY SEPT 90 NO 90-12 500 SERIES SILOS 90-13 3-M AIR HATS SEPT 90 YES * SEPT 90 YES 90-14 CORKIN COMPRESSORS SEPT 90 YES 90-15 SULFURIC ACID SEPT 90 YES UNLOADING AND STORAGE 90-16 OVERHEAD AND TRUCK CRANES AND SLINGS SEPT 90 YES 90-17 SCAFFOLDING INSPECTION PROCEDURE JULY92 + YES 91-1 91-2 91-3 OXYGEN MONITORS AUDIT MAY 92 ACID CLEANING RIG FEB 91 VCM BLEEDERS MAR 91 NO YES YES OCT SEP SEP MAY FEB SEP SEP MAY MAY SEPT DEC SEPT SEPT FEB SEPT FEB FEB SEPT MAY VAB.0001187696 Page No. 06/11/93 2 REVIEW NUMBER REVIEW NAME LAST REVIEW DATE ABERDEEN PLANT SAFETY REVIEW LOG ACTION STEPS TAKEN? FY90 FY91 FY92 FY93 FY94 FY95 FY96 91-4 BREATHING AIR SYSTEM MAR 91 91-5 COMPRESSED GAS CYL. STORAGE (LAB) MAR 91 91-6 BIO DISK SAFETY MAY 91 91-7 HAND TOOL INSPECTION DEC 90 91-8 DELUGE SYSTEM FEB 93 91-9 ENVIRONMENTAL SAMPLING JUN 91 91-10 REACTOR INTERLOCKS OUN 91 92-1 CMPD. MILL ROLL ERMERGENCY STOPS MAR 92 92-2 BULK TRUCK UNLOADING MAR 92 92-5 BULK NITROGEN SYSTEM 92-6 VCM OSHA REGULATIONS 92-8 MANBASKET PROCEDURE & SEP 92 EQUIPMENT NO MAR VAB.0001187697 a q e No. 06/11 / VG i SAFETY REVIEW REPORT * REPORT K VI D t" P I I il*' i* REVIEW DATE h>>tfe*hi.|k I 111 Ir i a-ri +4 c- . I'** W' *\ I- r- - * J da- -- - I t-.Mabtl.*' >1 lY -- 1 If* H 1 Ib 1 * k-M- 4 T >. M d ii|- p-| f D! * Td f ' P P 4 B-P*PI-fcrhB^9 d p r M J bi bl H I ' rf < 4 iddl 1 " *4 1-t H J k f. ad-lip * sT ip-p.t -Ml HMM pi W-+11 H COMP DATE I4IM 1 **MI I >4 i<*d, 90-9 MAY 90 *\ /** 90-11 SEPT 90 GAM 91-4 AR 91. WBG 91 4 MAR 91 WBG 9 2 -1 MAR 92 JVC INSTALL LOW PRESS. SHUTDOWN ON Hi CORKIN PUMP CONST PROG DAM UPDATE PLANT NOISE COOP ENGINERING CMM PROJECT FOK SUMMER 93 MOVE LOW PRESS. ALARM FOR FRESH AIR SYS. CONSTRUCTION COMPLETE. NEEDS ACCEPTANCE DAM PUT H20 LEVEL ALARM FRESH AIR TANK IN CONSTRUCTION COMPLETE. NEEDS * J f t- I- * **A i"1 / ** f" rv r** - ! W I** 1 t I ,1 `I1.- . DAM I NS ! rtl-1- !:.{" 11-L. I i Vt S i UP I;i J. bC uHrr a , PROJECT it tp i I i. N i r UNERRING SCH 04/01/93 09/01/93 02/01/93 0 2 / 01 / 9 3 t *1 j y 4y*4 *-- *4 k MAR 92 L D i EVALUATE EXISTING FAL P R 0 T E C T10 N E 0 UIP M E NT JDO 01 / fi'[ /q'Z / .** 4. / / iJ r"*i.*. ;*w-* -1r\1 T1 j/*O-v ' *t V W / V A J* W r, 4:.- 'J ,, "`t MAR 92 L..DH 7 . tjr*-1 -n AO / T O V7/ / C 1*11 p i'\l. 1 . 00-4 ,* a.* f A9 / 9 7/ MLC :" j *"t si / 4*-, T \ Uf A 3- / Q 7/ ML. C ry\ ***> **** /ri. J1 A 9/92 MLC UPDATE HOPPER TRUCK (UN)LOADING OPERATING PROCEDURES. IN PROGRESS UPDATE MANBASKET CERTIFICATION STAMP SET UP MANBASKET IN VMS R E C E R TIFIC A T10N AND STAMPINtr4\/f SYSTEM TO BE PROOF TESTED AFTER MODIFICATIONS AS PER SAFETY AUDIT. INSTALL GRAB RAIL AROUND THE ENTIRE :r of inside BASKET JDO II f V / / D A 1*1 MLC VAB.0001187698 Page No 06/11/93 SAFETY REPORT REVIEW NUMBER DATE + H- I * RECOMMENDATION STATUS Hl<*t till! -1*441^1 h| (4f t rf*4 92-4 9/92 92-4 9/9 2 MIX MLC 92-4 9/9 92-4 9/92 MLC MLC 92-4 9/92 MLC 93-1 2 /93 DEK /j- It j ? -j 2:/93 DEK 93-1 2./93 Z"> -y -i /93 DEK DEK 93-1 9/93 DEK il?o 4/93 7 Q Ht n*a 4/93 RHS RHS 93-2 4/93 -:HS V PROVIDE OVERHEAD PROTECTION OH BASKET ENSURE PROPER RATING ON RIGSING AND PROOF TEST DOCUMENT LOAD RATING OF WIRE AND THEN PROOF MARK BOOM TO GIVE OPERATOR CLEAR INDICATION OF BOOM LENGTH PROOF TEST AND DOCUMENT TEST tI *t tl W ANTI-TWO-BLOCKING DEVICE INSTALL DELUGE OVER FILTER PACKS IN OLD AND NEW MODULES INSTALL DELUGE OVER D~600 LOW" PUMPS. SET UP P-M. SCHEDULE FOR HEAT SENSORS. DELUGE SYSTEM OVER BULLETS SHOULD BE SABLED. POSITION NORTHERN MOST MONITOR TO REACH D-300 REACTOR INVESTIGATE IMPROVED LATCHING SYSTEM INVESTIGATE AND CORRECT CONDENSATE DRAINAGE ON FLOORS WRITE A W.O. TO HAVE GRATING INSTALLED OVER FLGOr* Cf\; o RES PONS.. *(! m i4i ififf' COMP DATE tyLC / DAM DAM DAM / / DAM cm / / CMM a4 CMM / CMM JD0 J DO / JDO // / VAB.0001187699 P a a e Mo 06/11/93 " -j l Vi* o w* w * r J LW "V 7 O " i: SAFETY REVIEW *** | + A * *+ f 4* f A f.J * H4 if lift *+' -*"*n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . i *kl>1 MIMI44 |i4ft | -H_ 4 * T * k * + + ##+4 *" k>'B + T-B + '-*- mi m m 4. * T B^ MB B*| p + B #B MV INVESTIGATE HEED FOR ADDITIONAL FIRE PROTECTION tM toLfoN FREEZER AREA IMPLEMENT P.M. FOR OPERATION OF TEMP ALARMS ON ALL FREEZERS WRITE W.G TO HAVE LIGHTS REPLACED WITH LOW TEMP. *Jr rOLERANT LIGHT A IMPLEMENT M r hA r m SCHEDULE FOP INSPECTING AND r', 1 v 1 j/-\ n. H P,B I ^ j 4 *X*t : f V l#fe I #* I UI 1J1 j *1 '* * DOOR GASKETS #4*4 ttlftli ilktlfif k kfl |i CO IIP' ,, DATE JDO / * / VAB.0001187700 DRILL RKOOttfSNDATIONS (PY 92) Table Top Drill Determine who directs the ambulance at n Determine how many Scott AirPaka in area Provide specific emergency duty training Establish tornado evacuation sites. Provide tornado training. Respona. CMM CMM cm CMM CMM Assign personnel to report to pump houses (day and night). Assign personnel for traffic control during emergencies. Evaluate use of flashing lights when p.a. system can't be heard. CMM JEN CMM Determine who is supposed to meet the ambulance? Bomb Threat Drill CjL/ <?2y Create and train a crisis management team. Train personnel on treatment of threatening phone calls. Establish a crisis command center for team above. CMM JEB CMM CMM / JEB 1. Provide annual hose handling practice. New Unit Recovery Drill CMM Review procedure for dealing with fatalities. Call the fire dept, as soon as fire is detected/reported MERCAPTATN RESPONSE CMM&JEB CMM 1. _3-J) 4 5\ 6, 7. 6- In response to a possible gas release, the boiler house should shut the gas off from outside. The plant emergency alarm should be sounded for suspected gas releases. The emergency plan should address who turns off the A/C for various areas and where. Determine how to best handle outbound traffic during emergency situations. Increase knowledge and procedures on operation of gas heaters The pipeline operator shall notify the plant prior to adding mercaptain in the future. Determine fastest and most effective way to contact pipeline operator; numbers correct / up to date. Procedure needs to be developed to address reseating the relief valve at the receiving station when the gas has been shut-off. DAM CMM CMM JVU DAM GAM DAM DAM VAB.0001187701 .ureg^*hou 1 dbe?deye*lrfl3ed tono^pffy tjjp'"boilejaguse pri mg^ dopa'a f&tfige s&ursecr^r s( _ A USDS for roercaptain shall be obtained. JVU ii. The availability of a good, reliable combustible gas instrument CMM should be addressed. y plan shall address community notifications cm and who is responsible for ensuring notifica takes place -r 1. 4.\ --s 5. ft 7y Line 1 operator upstairs did not hear the alarm Contractors working near rail scale did not hear the alarm Phone numbers to the evacuation / assembly areas shall be put on the phone list. Better guidance on proper shelter areas for weather shall be provided. The use of radios for drills and emergencies shall be clarified Provide a weather monitor for the compound supervisors office Tornado procedures shall be revised to address watch, warning, and alert levels as noted in the 5/21 memo. CMM CMM cm CMM CMM SCH cm i <N CO VAB.0001187702 TO: DISTRIBUTION FROM: DATE: H. Garrison Noveaber 13, 1989 SUBJECT: SAFE PROGRAM Tha Plant Manager's Natural Team has analyzed the SAFE program and baaed on the results of FY 1989, has mads several revisions to the program. We believe the revisions will improve the overall effectiveness of the program and will recognize and provide incentive for identification/corrective action for safety deficiencies which impair our ability to improve our plant's safety performance. The revisions include a change in categories and definitions of observations made. There are five categories and-each carry a point value (maximum -- 4, minimum -- 1). Your weekly goal is based on a minimum number of points/week versus a minimum number of reports/week and is dependent on your department and job duties (closely parallels last year's goals). The following attachments are provided to help better define the revised program: Attachment I Attachment II Attachment III Revised SAFE Reporting Form Scoring System/FY 1990 Goals Category Definitions/Examples The revised program will become effective December 3, 1989. If you have any questions or comments, please pass them on to your department head. H. GARRISON PLANT MANAGER HDG/gsc SAFE.113 Distribution: cc: THH AWS JJM JDH BJM JBB GHF JDG JES RDF R2B AED MLC WGC AJV RSB JMC TCL DFN HVW VAB.0001187703 Attachment I SAFE Supervisory Action For Excellence Observation Classification: UNSAFE ACT - Obvious Potential For Injury (4 Points) O UNSAFE ACT - Minina1 Potential For Injury (2 Points) LJ UNSAFE CONDITION - Obvious Potential For Injury (3 Points) O UNSAFE CONDITION - Minimal Potential For Injury (2 Points) OTHER (1 Point) Description: (Details------Who, What, When, Where): `* r Corrective Action: What specific action have you taken to correct this observed safety deficiency? Preventive Action: Aat additional action have you initiated to ensure that this observed safety deficiency is eliminated ami prevented from recurring? Person(s) Notified/ Copied: Date Supervisor Signature VAB.0001187704 SAFE SCORING SYSTEM Attachment II Unsafe Act - Obvious potential for injury Unsafe Act - Obvious potential for injury Unsafe Condition - obvious potential for inj ury Unsafe Condition - minimal potential for injury Other 4 2 3 2 ** 1 if Engineering Lab Office Maintenance Operations Safety 2 4 4 4 44 4 VAB.0001187705 Attachment III Definitions of the Categories used in the SAFE Reports I. UNSAFE ACT : When a person is observed in an act or activity which places themselves or someone else in a hazardous situation because he or she failed to follow standard job procedures, plant safety rules, or procedures which may not be written down but are the accepted safety practice. For a SAFE report to be classified as an Unsafe Act, the person peforming the act must be identified on the report. \ A. There are 2 types of unsafe acts, the difference* is explained below: 1. Unsafe Act - Obvious potential for injury When a person performs an action that puts themselves or someone else in a position where there is obvious or high potential for near term injury or harm to occur. 2. Unsafe Act - Minimal potential for injury When a person performs an action that does not pose an immediate hazard but has some minimal or remote potential to cause injury or harm. II. UNSAFE CONDITION : A physical condition or circumstance that could cause or contribute to the occurrence of an accident or injury. A. There are 2 types of unsafe conditions, the difference is explained below: 1. Unsafe* Condition - obvious potential for an accident or injury. This is a condition or circumstance that is in a "ready mode" to produce an accident or injury. 2. Unsafe Condition - minimal potential for an accident or injury. This is a condition or circumstance that needs attention but does not present an immediate safety hazard to personnel. III. OTHER : In this category are reports of plant security rule violations, housekeeping, and any safe report that can't be classified as an unsafe act or condition. # VAB.0001187706 EXAMPLES OF UNSAFE ACTS - OBVIOUS POTENTIAL FOR INJURY - 4 points Failure to use respiratory protection where required. Standing on top 2 steps of a stepladder or top 3 rungs on an extension ladder. Seeking in the plant where smoking is restricted. Failing to lockout a motor before working on it. Using a cutoff saw without a faceshield. Climbing a ladder without it being tied off or held in position by another person. Blinding a pump without a permit. Working outside a handrail without a safety belt. Welding in the reactor area without a fire watch. Entering a vessel without a hole watch. Adding catalyst to the cat bomb without goggles and gloves. Offloading a truck at the warehouse with a forklift without chocking the truck wheels. Entering chemwash shack without protective gear. Sandblasting without protective air hood. Failure to flag off the ground area under overhead work where the potential for dropping material is present. Failure to wear hearing protection in an area where "Hearing protection is required". Using a roll-around scaffold without locking the wheels. Looking into a vessel without breathing air and the vessel has not been cleared. Climbing a stationary ladder with a tool or instrument in your hand. Dumping salt bags without using the lift table. Improper lifting or failure to use tools/devices to assist lifting. Securing a door with wire. VAB.0001187707 J EXAMPLES OF UNSAFE ACTS - MINIMAL POTENTIAL FOR INJURY - 2 points Personnel falling to wear sideshlelds in the plant where there is mininal exposure to airborne foreign bodies. Failure to wear safety glasses in the lab or instrument shop when no work or activity is not underway that night pose an injury potential. Failure to wear a hard hat in open area where no overhead hazards exists. Concrete truck driver failing to wear a substantial work boot. VAB.0001187708 UNSAFE CONDITIONS - VITH OBVIOUS POTENTIAL FOR ACCIDENT OR INJURY - 3 POINTS Oily rungs on a ladder. Sharp edges on a handrail. Oil spills on the floor. Broken rungs or legs on a ladder. Failure to replace empty SCBA bottles and store the SCBA's in their storage box after use. Material left in walkways presenting a slip/trip hazard. A board with nails sticking up left on the ground. Live electrical wires exposed. Equipment not properly prepared for blinding. Ladders being used in doorway and not flagged off. Sewer covers left open and not barricaded - personnel could step in. VAB.0001187709 UNSAFE CONDITION - MINIMAL POTENTIAL FOR ACCIDENT OR INJURY - 2 POINT Step ladder left standing in walkway. Nitrogen bottle with top cap on was left unchained at the bottle rack. Fuel hose on the diesel tank is cracking. Bleeder plugs nlssing on AMS ports. Plugs nlssing on conduit junction box. Loading dock gate was left open. Colloid lift table was left up with access doors open. VGM tank car not chocked. Grounding cables not attached on VGM tankcar while offloading. Access to fire extinguisher, eyewash, or safety shower is blocked. ( VAB.0001187710 * OTHER. SAFE REPORTS - 1 POINT General Housekeeping Chocks being used without the "chock* sign. Bleeder not painted as required by policy. Railcar not placarded, sealed or labelled properly Fire monitors not positioned correctly. Fire extinguisher not inspected the previous month Plant gates left open (security). Vessels not lsbelled per the plant policy. Installation/replacement of safety signs. Improperly stored respirator. VAB.0001187711 OKLAHOMA CliY PVC PLANT l Supervisory Action For Excellence WAS OBSERVATION OF SOMEONE DOING SOMETHING WRONG AND/OR UNSAFE? UNSAFE ACT WAS OBSERVATION OF A GENERAL HOUSEKEEPING NATURE ------IE.. NOT CREATING EMINENT HAZARD? NO WAS OBSERVATION OF A CONDITION THAT CREATED A SAFETY OR HEALTH HAZARD? NO WAS OBSERVATION OF HEALTH ISSUE THAT IS IN THE PREVIOUS QUE (EXAMPLE: SECURITY) HOUSEKEEPING RULE VIOLATIO NO WAS OBSERVATION A RESULT OF A CONDITION THAT WAS CREATED BY A SAFETY RULE. POUCY OR REGULATION VIOLATION? NO UNSAFE CONDITION OTHER SHOULD NOT BE RECORDED AS A SAFE 01187712