1 MeJhod_of_AtUchment (Coittiracd)
(c) Coated Insulation to be applied Inside the Duct with meUl screws or mechanical fasteners (cross out one) applied on upper surface ol horizontal runs. Benjamin-Foster 81-71, 81-81, or equal adhesive, used on vertical sides and bottom surface of horizontal runs. Ad hesive to be applied in 4" wide strips at one foot Intervals, and then ridged slightly by using a serrated trowel.
When applying coated Insulation Inside the duct, cut to fit cross sec tional dimensions with the side pieces overlapping the top and bottom. Attach tides and bottom with coated side exposed, pressing firmly In to the adhesive to form a good bond, and then apply top piece and fas ten firmly in place, with prescribed fasteners on the pins or the screws and washers. Point all Joints of Duct insulation with BFC 81-33 or equal adhesive to Insure tight join!*.
5. Special Finish - (Cross out all or all but those desired)
(a) Canvas or Asbestos Paper Place metal edges of 26 or 28 gauge Gal
vanized MeUl or thin aluminum bent at right angles on all corners of
Insulated duct (if desired) and
os. canvas orf
Asbestos paper applied with Benjamin-Foster 81-42 V "Lagfas", or
equal.
(b) White Insulating h Finishing Cement - Welding plus or mechanical fasteners must be used on all four sides of duct - using pins approxi mately l/2" longer than the thickness of the insulation.
Impale the insulation over the pins and secure it with clips pressed tight, then apply poultry netting or metal lath on all four sides and corner beading on all edges - and secure with second fastener on same pin. Then apply a minimum of 3/8" Baldwin-Hilt Super Pow erhouse Cement, or equal, and trowel to a smooth finish.
(c) Painted Surface Paint Duct Insulation with Rubber Base Paint.
(d) Out-Door WeatheTproofin" - When ducts are outdoors, apply metal lath over the Insulatlcr. - attaching it by tie wires to the metal fasteners holding the insutatiun in place.
Apply a minimum of 3/8" thickness of Baldwin-Hilt Super Powerhouse Cement, or equal, on the metal lath, and trowel to a smooth finish. Allow to dry. Apply a first coat of 5aldwin-Hill Vapor Seat Mastic (4 gal./lOO sq.ft.), or equal, Ihen press into the still "wet" Vapor Seal Mastic, a layer of woven glass cloth. Then apply a second coat of Vapor Seal Mastic (8 gal./lOO sq. ft,) and allow to dry.
Oaiti May 21, 1956 Supwisdeu New Rage
230308
Duct Insulation Specification to0*< 2