Document R27n4z2n6z8qvevjOz6Z9G4kV

/ Monsanto 'no (.t i ior>i j. r. Savage - General Office Bait UPJIC1 : March 5, 1971 FEBRUARY 1 PCB REPORT Ct: Mr. H. S. Bergen P. B. Hodges TO : Mr. W. B. Papageorge I Oeneral Office A. W. 0. Krummrlch Plant pi Levels In Sewer A. Aroclor losses from the Aoclor Department trench averaged 0. 04 lbs/day ranlng from 0. 03. to 0.17 lbs/day. No samples were obtained from the blow tank drowning Jet but this loss has previously been measured at 0.5 lbs/day average. Data covers the period from 1/17 to 2/4. Losses from the treatment plant for the Bame period averaged 55 lbs/day. Range for 6 samples was 19 to 161 lbs/day. Data from 2/4 to 2/16 Is not available at this time due to column contamination of the laboratory QLC. B. Data for the month of January from the main plant sewers give an average total loss of 47 lbs/day. Average loss measured at the waste treatment plant influent Is 84 lbs/day. ' One sample taken from the Village sewer (Rogers Terminal) analyzed 0. 033$t PCB's which is equivalent to about 500 lbs/day. Apparently Rogers had dumped a wash the day this sample was taken (1/26/71.) This probably explains the difference between the plant loss and the treatment plant Influent. Sediment samples from 4 of the plant sewers were high in PCB's ranging from 0. 05 to 0. JIJS. Projects To Reduce sewered PCB's From Aroclor Department Two projects remain to be completed. Estimate 2422 to pave and trench loading and storage areas, and Estimate 2811 to pave and curb under the Therminol unit design packages are out. Projects are scheduled for completion by 6/1. MOMS 096.340 |N I AtV >. Page 2 W. 0. Krummrlch Plant Program To Eliminate Sewered PCB's From Using Departments A. Design packages were completed for the change-out of Thermlnol units to Thermlnol 66 in Depts. 270, 275, 258, 273. 239, 248 (2 units). B Five Thermlnol units in Depts. 243 and 244 will be changed out to a mixture of Thermlnol 55 and TCB. No projects are necessary. C Project package and estimate to change out Dept. 222 (PNA) Thermlnol unit is on hold pending final decision on future of permanent PNA. This decision Is expected by 3/8/71. D. Dept. 245 Thermlnol unit change-out Is still being evaluated. EDO for the evaluation is 4/1/71. E. Pydraul A-200B has been placed In two of the three hydraulic systems In Dept. 251. F. All Aroclor trailers, including Rogers trailers, are being washed at WQK's Rip Track. PCB Levels In The Atmosphere Design package for Estimate 2675 to replace the nitrogen purge with a nitrogen blanket at the mix tanks has been rescheduled for completion by 6/1/71. This will reduce air pollution about 5 lbs/day which is Insignificant compared to losses from some Thermlnol unltB. Major Project Status A. MCS 1016 (CEA 2417) The final draft of the Appropriation Request Is being forwarded for approval. New fixed capital requested Is $820,000. Foundations are essentially complete and column erection 1b scheduled for March 10. Start-up Is still targeted for June. B. Incinerator (CEA 2415) - Major items of the Zulk Incinerator package have been . shipped. Foundations are complete and 75# of the piping fabricated. Start-up targeted for first week of May. Project was approved ($590,000 Including ln-department improvements) In November. MONS 098341 Page 3 B. Anniston Plant Aroclor Wastes Current level of Aroclor losses during February averaged | 1. 95#/day (182 ppb). | Breakdown of the numbers are: 27 day average 105 ppb 1. l3#/day Increase due to adding limestone to #2 HC1 pit 77 ppb 0.82#/day 182 ppb ! 95#/day Projects And Evaluations 1. Acid-proofing of #1 HC1 (It was delayed due to Inclement weather. Proofing completed as of 3/1/71. Pit Is now ready for service pending addition of limestone. 2. Installation of the reactor-clarifier. Experimental facilities for evaluating PCB removal by powdered adsorbent addition followed by flocculationclarification removal of solids Is complete. Start-up has been delayed by various mechanical problems. Start-up is now targeted for week of 3/1/71. Spills There were no Bpills during February. J.R. Savage md MONS 098342