Document R26w870YDw4Qo3b34Dm09gvXz
FRAZER PAINT COMPANY 2475 Hubbard Avenue Detroit, Michigan
TRADE MAKE; CATEGORY: COLOR: QUALITY:
Oil Stain Oil Stain Light Oak First
Pigment: 1.3" Light Cak Eye
Vehicle: 98.7% Mineral Spirits Benzol^ Lir.see'd 0'\ Drier
SCHEDULE I
Lbs. k
138 . I38 *
15 20
Yield in Gallons
Unit Cost
Total Cost
Weight
2.CO
5.0C
rer
gallon Storage & handling cost
finished through loss - \%
Droduct.
Laboratory
record
7. lbs.
C15
2.07
.06 6.28
.1? 1.95 .07 1.40 Storage 4: handling cost
through loss - 3^
8.00 .50
13.70 .41
Calculated Yield Manufacturing L0S3 - 2\% Actual Yield
'IS
45. 1.1
L3.9
Cost Analysis: Material cost per gallon Direct labor cost per gallon
Factory overhead per gellon Bulk cost per gallon Complete package cost per gallon, including filling charge Factory cost in package per gallon
TRICES
(a) To a company owned or controlled outlet (b) To an independent wholesaler (c) By company owned or controlled outletto retail customer (d) ' To an independent retailer (Dealer) (e) To other (Industrial)
(Contractor)
22.91
.52 .08
*.1842
None None 2.25 I.90 1,91 1.80