Document R26kR21qELO190eXONgzxda4a
WORK PLAN OF
MANUFACTURING IMPROVEMENT PLAN
FOR
AROCLORS DEPARTMENT 21(6/259
APPROVED: B. VJ. Corlew, Prod. Grp. Supt., Manufacturing C. "N." Deubner, Gen, Supt., Malnt
D. W. Jackson, Gen. Sup't., TSD
3, R, Savage, Mfg. Mgr
DATE APPROVED: DATE ISSUED:
PREPARED BY: ffoupu. (J / W. A. Krull
HONS 0350AA
MONS 0 3 5 0 4 5
Description
1. Conduct 1971 Safety Audit
2. Control Catalyst Mix Tank Temperature
3. Complete Lean To Steel Modifications
4. Upgrade 5th Level Steel
5. Resolve 1260 Quality Problem
6. High Temperature Power Factor Program
7. Install Control Lab Cle an Room
Estimated Man Days
20
10
0
10
. 10
50
10
8. Analyze Power Factor Data for Proposed Modifications
9. Study Possible Quality Degrading During Loading
10. TCB and TTCB Quality Evaluation
11. Install 70-30 Blend Storage Tank
10 20 15 20
DETAIL TASK LIST
Cap./Exp.
Justification
EDC
Responsibility
0
Safety
10/1/Tl Production/TSD/Safe'
0/2000
Safety
7/1/71 E&i, Maint. (Projee'
0/3000
Safety
3/1/Tl Maintenance
0/6000 0 TBD
2500/2500
0 TBD TBD
Safety
Quality . Imprvmt.
Quality Imprvmt.
Quality Measure ment
Quality Measure ment
Quality Imprvmt.
Quality Imprvmt.
9/1/71 Mech. Design, Maint 2/1/71 TSD 1/1/72 TSD, Proc. Tech. 2/15A1 Mech. Design, Maint
(Project)
yi/71 TSD 7/1/71 TSD 9/1/71 TSD
0/$40,000
Inc. Blend Capacity
1/1/72 Mech. Design, Maint (Project)
Description
12. Improve Drum Handling Facility
Estimated Man Days
20
1?. Start-Up Aroclor Incinerator
150 Incl. M-.R.
14. Start-Up Aroclor Fractionator
200 Incl. M.R.
15. Monitor Plant Severs for PCB
50
16. Monitor Plant Air
for PCB
'.
17. Change Out Aroclor Thermlnol Units
15 25
18. Install Paving and Curbing Around Tank Farm and Loading Areas
19. Install Paving and Curbing around Thermlnol Unit
5 10
20. Install Nitrogen Blanket on Mix Tanks and Reroute Chlorlnator
Relief Lines
20
21. Initiate Drum Reclaiming or Disposal
20
22. Install Aroclor Rework Project
5
DETAIL TASK LIST_______________________________________Page 2
Cap./Exp.
0/7000
430.000 100.000 800,000 150,000
Justification Labor Reduction
Pollution Pollution
EDC
Responsibility
10/1/71 TSD/foech. Design/Kaint.
(Project)
TSD/Maint. 8/1/71 (Project)
.
'Produc tion/Malnt./ 10/1/71 TSD (Project)
0
Pollution
Cont.
Pollution Grp ./TSD
0
10,000 10,060
Pollution Pollution
Cont.
Pollution Grp ./TSD
8/1/71 TSD/Maint. (Project)
40,000/0
Pollution
9/1/71
Mech. Design/Iaint.
(Project)
'
5000/0
Pollution
Mech. Design/Maint. 7/1/71 (Project)
0/6000
0 35,000
Pollution Pollution Pollution
4/1/71
TSD/Maint. (Project)
4/1/71 TSD/D&S
10/1/71 TSD/Maint. (Project)
MONS 035046
MONS 0 3 5 0 4 7
Description 23. Issue Revised SMP's
Estimated Man Days
5
24. Update and Issue Operating Instructions
10
25. Establish Key Variable Monitoring System
26. Develop Methods to Analyze Chlorine and Biphenyl
27. New Product Evaluations
30
20 60
DETAIL TASK LIST
Page 3
Cap./Exp. 0
Justification
Process Control
EDC 3/1/Tl
Responsibility Production/TSD
Wn0 Process
Production
Control
Process
2/1/riTBD
Control
TSD/Production/E&I
TBD TBD
Process Control
New . Earnings
i/i/re
As Needed
AR&D/E&I TSD/Production
APPENDIX F.
NO. ITEM 1 Reduce Drumming Costs
WORK PLAN /?TT4CM& TO 0*4rAjtfC MtP
EST.
EST.
&ro. Si**.**. (*i70
COST MAN-DAYS RESPONSIBILITY EDC
COMMENTS
'
A. Insulate #7 Storage Tank
$2500
0
TSD (Process)
1/1/70 CAWdRTiTJ'.b
B. Evaluate Improved Drumming 2. Increase Yields
05
TSD (Process)
6/1/70
Report Drafted
A. Improve Blend Raw Material Yields
00
Production
1/1/70 Action Taken
B. Chlorine Usage Study 3. Reduce Maintenance Costs
0 10
TSD (Process)
1/1/71 In Progress
A. Determine Off-Gas Corrosion
0 10
TSD (Process)
9/1/70 MM&T Advice Needed
B. Preventive Maintenance Lists
4. Maintain Quality
.
0 10
Prod/Malnt.
3/1/70
In Progress .1
A. Roofs on Loading Docks
B. Resolve Electrical Property Measurement
8000 0
C. Preloading Quality Treatment T.B.D.
15 0
20
TSD (Mech. Design' 6/1/70
TSD/Maint TSD (Process)
1/1/71 *
Waiting for Lab Scrubber
. Waiting for 4B
MONS 035048
D. Ag Grade XC1 Test
.
5. Maintain Adequate Capacity A. Replace Mix Tank Pumps B. Drowning Jet Evaluation
0 10
$5000 0
5 5
TSD (Process)
3/1/70
Check effect on Aroclor
Maint. TSD (Process)
6/1/70 6/1/70
Obsolete.
Check Capa city
C. Improve Mix Tank Mixing
05
Production/ TSD (Process)
8/1/70
* Dependent on ability to reproduce electrical property measurements - 4b.
Minor Modi fication
WORK PLAN - (Continued)
APPENDIX F.
NO. ITEM
EST.
EST.
COST MAN-DAYS
5. Maintain Adequate Capacity (Cont'd)
D. Establish Minimum Drum n
Inventory
.
0
5
RESPONSIBILITY Production
6. Provide Safe Working Atmosphere
A. Fume Removal System Addition $8000 10
B. Lime Delivery Facility
1000
5
TSD (Process)
TSD (Mech. Design)
C. Safety Audit Items
T.B.D.. 15
Production
EDC
COMMENTS
3/1/70
7/1/70 Hold
Extension of System waiting
for fork lift app.
11/1/70 Ref. Safety Audit
MONS 0 3 5 0 4 9
'7. Keep .Aroclor from Sewers A. Control Rupture Disc Discharge
B. Install Sewer Basins C. Sewer Pollution Check
D. Reduce Blow Tank Losses
E. Determine Amount of Aroclor in Off-Gas
F. Catch Wastes from Drip Pans & Sample Lines
0. Piping Modifications on Blow Tank
5000 15
$11,000 0
15
0 10
05
00
5^00
20
(TSD-Process)
6/1/70
Recycle to Surge Tank
TSD (Mech. Design)7/1/70 Trap Aroclor
TSD (Pollution Control)
Cont.
Sampling to continue
TSD (Process)
10/1/70 Aroclor to sewer
TSD (Process)
Vl/70
At Dents. 217 & 218
Production
3/1/70
TSD (Mech. Design
5/1/70
ososeo snow
APPENDIX F,
WORK PLAN - (Continued)
NO. ITS!
'
EST.
EST.
COST MAN-DAYS
8 Maintain Control of Process
A. Complete Process Variables
Chart & Key Variable list
0
10
B. Revise Operating Instructions 0 10
C. Revise Std. Mfg. Process
0 10
9 Maintain High Level of House Keeping and Improve Operations
A. Upgrade Control Room
$14,000
0
B. Dismantle Obsolete Equipment 2,700
0
C. Road & Sewer Improvements
30,000 '20
D. Pave Tank Farm
T.B.D.. 10
E. Replace Lean-to
$200,000
30
RESPONSIBILITY
EDC
COMMENTS
Production
Production Production
4/1/70 In progress
7/1/70 In progress 12/1/70 In progress
TSD(Mech.Design) 4/1/70 In progress
Maintenance
3/1/70 In progress-
TSD(Mech.Design)
n rr
n
nn
i?
On Hold No work being done
On Hold No work being done
On Hold No work being done