Document R26kR21qELO190eXONgzxda4a

WORK PLAN OF MANUFACTURING IMPROVEMENT PLAN FOR AROCLORS DEPARTMENT 21(6/259 APPROVED: B. VJ. Corlew, Prod. Grp. Supt., Manufacturing C. "N." Deubner, Gen, Supt., Malnt D. W. Jackson, Gen. Sup't., TSD 3, R, Savage, Mfg. Mgr DATE APPROVED: DATE ISSUED: PREPARED BY: ffoupu. (J / W. A. Krull HONS 0350AA MONS 0 3 5 0 4 5 Description 1. Conduct 1971 Safety Audit 2. Control Catalyst Mix Tank Temperature 3. Complete Lean To Steel Modifications 4. Upgrade 5th Level Steel 5. Resolve 1260 Quality Problem 6. High Temperature Power Factor Program 7. Install Control Lab Cle an Room Estimated Man Days 20 10 0 10 . 10 50 10 8. Analyze Power Factor Data for Proposed Modifications 9. Study Possible Quality Degrading During Loading 10. TCB and TTCB Quality Evaluation 11. Install 70-30 Blend Storage Tank 10 20 15 20 DETAIL TASK LIST Cap./Exp. Justification EDC Responsibility 0 Safety 10/1/Tl Production/TSD/Safe' 0/2000 Safety 7/1/71 E&i, Maint. (Projee' 0/3000 Safety 3/1/Tl Maintenance 0/6000 0 TBD 2500/2500 0 TBD TBD Safety Quality . Imprvmt. Quality Imprvmt. Quality Measure ment Quality Measure ment Quality Imprvmt. Quality Imprvmt. 9/1/71 Mech. Design, Maint 2/1/71 TSD 1/1/72 TSD, Proc. Tech. 2/15A1 Mech. Design, Maint (Project) yi/71 TSD 7/1/71 TSD 9/1/71 TSD 0/$40,000 Inc. Blend Capacity 1/1/72 Mech. Design, Maint (Project) Description 12. Improve Drum Handling Facility Estimated Man Days 20 1?. Start-Up Aroclor Incinerator 150 Incl. M-.R. 14. Start-Up Aroclor Fractionator 200 Incl. M.R. 15. Monitor Plant Severs for PCB 50 16. Monitor Plant Air for PCB '. 17. Change Out Aroclor Thermlnol Units 15 25 18. Install Paving and Curbing Around Tank Farm and Loading Areas 19. Install Paving and Curbing around Thermlnol Unit 5 10 20. Install Nitrogen Blanket on Mix Tanks and Reroute Chlorlnator Relief Lines 20 21. Initiate Drum Reclaiming or Disposal 20 22. Install Aroclor Rework Project 5 DETAIL TASK LIST_______________________________________Page 2 Cap./Exp. 0/7000 430.000 100.000 800,000 150,000 Justification Labor Reduction Pollution Pollution EDC Responsibility 10/1/71 TSD/foech. Design/Kaint. (Project) TSD/Maint. 8/1/71 (Project) . 'Produc tion/Malnt./ 10/1/71 TSD (Project) 0 Pollution Cont. Pollution Grp ./TSD 0 10,000 10,060 Pollution Pollution Cont. Pollution Grp ./TSD 8/1/71 TSD/Maint. (Project) 40,000/0 Pollution 9/1/71 Mech. Design/Iaint. (Project) ' 5000/0 Pollution Mech. Design/Maint. 7/1/71 (Project) 0/6000 0 35,000 Pollution Pollution Pollution 4/1/71 TSD/Maint. (Project) 4/1/71 TSD/D&S 10/1/71 TSD/Maint. (Project) MONS 035046 MONS 0 3 5 0 4 7 Description 23. Issue Revised SMP's Estimated Man Days 5 24. Update and Issue Operating Instructions 10 25. Establish Key Variable Monitoring System 26. Develop Methods to Analyze Chlorine and Biphenyl 27. New Product Evaluations 30 20 60 DETAIL TASK LIST Page 3 Cap./Exp. 0 Justification Process Control EDC 3/1/Tl Responsibility Production/TSD Wn0 Process Production Control Process 2/1/riTBD Control TSD/Production/E&I TBD TBD Process Control New . Earnings i/i/re As Needed AR&D/E&I TSD/Production APPENDIX F. NO. ITEM 1 Reduce Drumming Costs WORK PLAN /?TT4CM& TO 0*4rAjtfC MtP EST. EST. &ro. Si**.**. (*i70 COST MAN-DAYS RESPONSIBILITY EDC COMMENTS ' A. Insulate #7 Storage Tank $2500 0 TSD (Process) 1/1/70 CAWdRTiTJ'.b B. Evaluate Improved Drumming 2. Increase Yields 05 TSD (Process) 6/1/70 Report Drafted A. Improve Blend Raw Material Yields 00 Production 1/1/70 Action Taken B. Chlorine Usage Study 3. Reduce Maintenance Costs 0 10 TSD (Process) 1/1/71 In Progress A. Determine Off-Gas Corrosion 0 10 TSD (Process) 9/1/70 MM&T Advice Needed B. Preventive Maintenance Lists 4. Maintain Quality . 0 10 Prod/Malnt. 3/1/70 In Progress .1 A. Roofs on Loading Docks B. Resolve Electrical Property Measurement 8000 0 C. Preloading Quality Treatment T.B.D. 15 0 20 TSD (Mech. Design' 6/1/70 TSD/Maint TSD (Process) 1/1/71 * Waiting for Lab Scrubber . Waiting for 4B MONS 035048 D. Ag Grade XC1 Test . 5. Maintain Adequate Capacity A. Replace Mix Tank Pumps B. Drowning Jet Evaluation 0 10 $5000 0 5 5 TSD (Process) 3/1/70 Check effect on Aroclor Maint. TSD (Process) 6/1/70 6/1/70 Obsolete. Check Capa city C. Improve Mix Tank Mixing 05 Production/ TSD (Process) 8/1/70 * Dependent on ability to reproduce electrical property measurements - 4b. Minor Modi fication WORK PLAN - (Continued) APPENDIX F. NO. ITEM EST. EST. COST MAN-DAYS 5. Maintain Adequate Capacity (Cont'd) D. Establish Minimum Drum n Inventory . 0 5 RESPONSIBILITY Production 6. Provide Safe Working Atmosphere A. Fume Removal System Addition $8000 10 B. Lime Delivery Facility 1000 5 TSD (Process) TSD (Mech. Design) C. Safety Audit Items T.B.D.. 15 Production EDC COMMENTS 3/1/70 7/1/70 Hold Extension of System waiting for fork lift app. 11/1/70 Ref. Safety Audit MONS 0 3 5 0 4 9 '7. Keep .Aroclor from Sewers A. Control Rupture Disc Discharge B. Install Sewer Basins C. Sewer Pollution Check D. Reduce Blow Tank Losses E. Determine Amount of Aroclor in Off-Gas F. Catch Wastes from Drip Pans & Sample Lines 0. Piping Modifications on Blow Tank 5000 15 $11,000 0 15 0 10 05 00 5^00 20 (TSD-Process) 6/1/70 Recycle to Surge Tank TSD (Mech. Design)7/1/70 Trap Aroclor TSD (Pollution Control) Cont. Sampling to continue TSD (Process) 10/1/70 Aroclor to sewer TSD (Process) Vl/70 At Dents. 217 & 218 Production 3/1/70 TSD (Mech. Design 5/1/70 ososeo snow APPENDIX F, WORK PLAN - (Continued) NO. ITS! ' EST. EST. COST MAN-DAYS 8 Maintain Control of Process A. Complete Process Variables Chart & Key Variable list 0 10 B. Revise Operating Instructions 0 10 C. Revise Std. Mfg. Process 0 10 9 Maintain High Level of House Keeping and Improve Operations A. Upgrade Control Room $14,000 0 B. Dismantle Obsolete Equipment 2,700 0 C. Road & Sewer Improvements 30,000 '20 D. Pave Tank Farm T.B.D.. 10 E. Replace Lean-to $200,000 30 RESPONSIBILITY EDC COMMENTS Production Production Production 4/1/70 In progress 7/1/70 In progress 12/1/70 In progress TSD(Mech.Design) 4/1/70 In progress Maintenance 3/1/70 In progress- TSD(Mech.Design) n rr n nn i? On Hold No work being done On Hold No work being done On Hold No work being done