Document R22gbyaJjoxY3qg1GqzNmrvdz
* HEALTH, SAFETY & ENVIRONMENTAL AFFAIRS
* UNION * * CARBIDE *
SOLVENTS & COATINGS MATERIALS
P. O. BOX 471
_____TEXAS CITY,TX 77592
May 28, 1987
Mr. Eli Bell Executive Director Texas Air Control Board 6330 Highway 290 East Austin, Texas 78723
Re: Renovation Notification
Dear Mr. Bell:
This is to notify you, as required by 40 CFR 61.146, that Union Carbide Corporation, Old Ridgebury Road, Danbury, Connecticut 06817, as owner, plans to engage in renovation activities as described below:
Insulation will be removed from 450 square feet of equipment located in Building 17, "Isopropanol", at 3301 5th Avenue South, Texas City, Texas 77590. The equipment is approximately 25 years old.
Removal of the insulation is scheduled to start on July 1,
1987, with completion by September 1, 1987.
Procedures to be
employed in the handling and disposal of the asbestos material
will conform to the requirements in 40 CFR 61.147 and 61.152.
All asbestos materials removed will be disposed at Gulf Coast Waste Disposal Authority, Loop 197, Texas City, Texas.
Yours very truly.
G. L. Rivera
cc: Dr. E. R. Ibert - GCACD, La Marque
kem/
Bcc : C. L. Dudnick - 500 J. B. Evans - 500 K. E- Martin F. G. McWhorter
L. D. Pell G. M. Whipple - 500 R. E. WoodcockA. P. Yalcinkaya
UCTC 1S883
-t
n
\
r
'C
Plant Procedure I-B-b
Attachment #1
UNION CARBIDE CORPORATION
TEXAS CITY PLANT
NOTICE OF INTENTION TO DEMOLISH OR RENOVATE A STRUCTURE OR
rAcmrrcMTAiNifiG asbestos materisl
i . Description of the facility:
/yZ/s////s^/m,
/o'
/
oJ 8/*Lr, / -7_________
Age (approx, years) ^3
Size
6 Prior Use
<f_
.2 Estimate of approximate amount of friable asbestos materials present:
(Area in sq. ft. or linear ft.)
*/J> & 5<? f /
Estimation technique used:
3. Location of facility: \R/dc
Scheduled starting day: Q'j/jh'A' /, /f/7
4.
CX<tXcrrJ^Scheduled completion day
- /'. /"f/7
5. Mature of planned demolition or renovation: /'U .... 'a . .a-..
....
t-
Method to be used:
.-C-x ... -rf,.
6. Name cf person that prepared the form:
Location and telephone nunber: Date:
^
fc XS>
!$
NOTE: This form must be completed and delivered to the EP Department (Bldg. #1) at least 30 days ahead of the scheduled starting day of the planned danolition or renovation, or as soon as possible following an emergency renovation
ope rati on.
Apri 1/I 985:1 67U$
UCTC 18884