Document R0a0gmXJK8nQLVLEvY34mXwB

INDUSTRIES PPG INDUSTRIES, INC. INDUSTRIAL CHEMICAL DIVISION P. 0. BOX 1000 LAKE CHARLES. LA. 70601 J. R. FARST Assistant Works Manager November 17, 1977 Mr. Gus Von Bodungen Louisiana Air Control Commission P.O. Box 60630 New Orleans, LA 70160 Re: Permit Application - No. 3 Process Waste Incinerator Dear Mr. Von Bodungen: PPG is presently operating two permitted high temperature process waste incinerators for the thermal destruction of liquid and gaseous chlorohydrocarbon waste. PPG plans to install a third incinerator for the purpose of thermal incineration of vinyl chloride monomer (VCM) from the present manufacturing unit and the VCM tank car loading facilities. o The incinerator combustion chamber will operate at 2 200 F. The combustion gases will pass through the heat recovery boiler system for energy conservation. The heat recovery boiler system will produce 50,000 Ibs/hr of 185 psig steam. The No. 3 Incinerator will operate parallel to the two existing incinerators. Liquid organic waste and gaseous vents from existing operating units will be integrated into the feed system of the new incinerator system. The incinerator is designed with a primary and secondary scrubbers with adequate column design and packing for gas distribution for scrubbing. The incinerator scrubber system is designed to meet the VCM Federal emissions standards. PPG is installing VCM and chlorohydrocarbon analytical instrumentation for monitoring the secondary scrubber stacks from the No. 3 Incinerator and the No. I and 2 incinerators. SL 078226 Mr. Gus Von Bodungen November 17, 1977 Page 2 Our proposed application for the No. 3 Incinerator is attached. We are sending only two copies and one EIQ for you and your staff to review. We realize additional copies will be needed for the Commission members as the proposed permit is finalized. C. A. Burns, at 318-882-1200, ext. 2370, will assist you and your staff. Please be assured of our continued cooperation with your staff and the Commission. Very truly yours, JAMES R. FARST /as Attachment cc: C. A. Burns W. J. Peard J. E. Wyche III bcc: T. G. Taylor (letter only) G. K. Jordan It J. Arendt T. Ziehler L. Joiner T. C. Jeffery II II SL 078227 APPLICATION FOR APPROVAL OF EMISSIONS For: Installation of T: ird Process Waste Incinerator (Revised Apri! 1 , 1975) Send 14 copies to: Louisiana Air Control Coraiission P, 0. Bex 60530 New Orleans, Louisiana 70160 Attention: Technical Assistance 1. GENERAL INFORMATION Name of person or company requesting permit: PPG Industries, Inc., Chemical Division, U.S, Address: P.o. Box 1000, Lake Charles, LA 73601 Responsible person and his Title C. A. Burns__ _____ Environmental Control Specialist______ Date submitted: November, 1977Telephone No.510-612-1200 2. GEOGRAPHICAL LOCATION OF PLANT Description of location of plant or establishment and/or map section showing same: _________________ _____________________________ _ ____ Chemical Plant, Calcasieu Parish, Louisiana Section 3 and 4________________________________________ ____ Township 13-c, Ran^s 9-W Southwest District, Louisiana =1 SL 078228 Show ownership and use of adjoining property on map section or list below, tlst on/ residential areas near the plant or establishment and give distance from the plant or establishment: ___ ,,--,,-- ----- ------------------------------ -------- ,,--,--- See Exhibit I - PPG Area Land Allotment______ - Drawing ^32 A-bC'2,7____________________ * ol 3. LOUISIANA AIR CONTROL CO^'ISSION E'hSSION INVENTOR" QUESTIONNAIRE. A completed Emission Inventory Cuest'cnnaire (copy attached) is required. If a now 6 page questionnaire for This location has boon previously submitted, give date of submission June 15, 1977_____ ____ , A cgw>intec! "revIren" Cmlssicn inventory Guestiam a Irs must also Jn submitted wit's this application. Tho Emission 1 nventcry Quo*vt`ion*'a I ro meet bo con-:! -tod showing the entire emissions of the facility after molificaNone and/or coitions. 1st(rated starting date t Estimated cote opera-, ol construction: March, I97Sft on will begin: October 21, 1975 hew facl 1 Ity: YesAddition: Yes "Glvo a brief description of proposed action and attach such information as flow diagrams, schematic diagrams, erasings, etc, nondec to convoy an understanding of llio processes .involved in t;-,e olani or establishment," PPG is Installing, a third process waste incinerator to be operated parallel with the existing two flSrfnjtted incinerators. The No. 3 incinerator will rive PPG'in-proved flexibility in the therma I decomposition of chlcrohyrirocarbcns from the several operating units; however, the third incinerator S'/stem will be the control device for the present vinyl chloride monomer manufacturing and tank car leading facilities. See Exhibit II - Schematic Flow Sheet from the present VCM facility and Exhibit III Schematic flowsheet for the VCM tank car loading facility. The No. 3 incinerator sysJgULwijl rave a waste neat boiler for energy conservation. The combustion ccse_$ from the Eacjn^rator pass through the heat recovery boiler (50 M Ib/nr of 135 psig steam)systern and exits fOISUdih a primary (ccid a_scpper) scrapper and toe nee trrougr. tns secondcry scruboer system. * 2= SL 078229 4 IDENTIFICATION AND LOCATION OF EMISSION SOURCES Enclose* a sketch shoeing specific location of point cr points of emission. Snow eoproxlmata distance (In foot) of ail such points from property lira. (Encn emission scarce shall bo numbered con secutively In The veer of pnrr.ir request, For example, tha first for Khich a pormlt Is requested In 1973 would bo designated as 1-73. S*e Exhibit IV - Stock Location from property line. Idontlfication Number 1-77 t Nairsp and Description of Source No. 3 Incinerator Secondary Scruboer Stack * i E *' 1 SSI ON ! STACK Identification! * :vyo op* ewi v | Di a-n, ! Liov. Con be Number j Velocity j Foot | Above Si'.x'oled Ft./Sec, ! * Or;->Je Y.-.s f.'n 1-77 | 265 163 53.9 31 1 IOC i Yes .... t . .. *5* - -- SL 078230 SUMMARY OF RUSSIANS AND THEM EFFECTS ON ANIENT AIR FC?.: OSr=rticulate Matter QS02 C0 rXjwc3i`10x PI Other HCI & Cl2 (Check One) Point Source (indicate # on map) 1-77 -- emissio; IS lbs/hr With Mi thout Control Control Process Ap{$atu$ Apparatus Weights, (Max) tons/hr Concentration of Follutar.t Cases in Discharge Oas PPM] ug/m-J Heat* Input Ringelmann Number or Opacity Particulate 12.4 NA NA 150* 19.4 x I04 NA ** CO 4.0 NA NA .50 6.3 x I04 t A NA . _N*_______ HCI 26.3 NA NA NA 200 41.1 x I04 NA NA NA 32.5 5.3 x I04 NA NA Z> crj lJ__ --------------1 o5 oCO o CO ( do . - I Hydrocarbon itoor' u., m 5.0 1.0 NA NA ------------ NA NA 25.4 5.5 8.0 x I04 4 1.5 x 10 NA ** Unable to estimate EFFECT ON AMBIENT AIR: |HTPr-Tiw Property l Line Maximum onng_e5TimoTi ^ UIIULIl V luuuii ~ 4.*+ nu ui /-ivtsruys? Stability Wind Speed Max. Ground Level Stability Class and Locations ** Class PPM ug/m3 m/sec PPM ug/n)3 Dist. Wind Dir. .. Part I CO __ __ 0.08 38 2008 W A' 2000 E 0.009 12 0S W A TDD0T __ __ 0.17 345 0S w A NA NA Wind Speed in/sec 4 4 4 HCI i2_ HC_ t _ ,, 0.002 3 wA 1 ow __ __ 0.001 4 0 s w A 1 2000 V\ 0.23 517 .2000 N SE D 1 - ------------------ ----------- -- ---- -. , i Coordinates referenced to plfint origin. Dispersion calculations by Briggs-Tumer Equations. All plants as required by'LACC. * ^ = Subpage____ _ of SL 078231 % 5. PROPOSES AIR POLLUTION CONTROL List tha air pollution a!) atenant treasures that v.ll I bo utilized to control tho emissions front the sources for tho plant or establishment. If no facilities are contannlaved, list Ihe steps uhicn v! 11 be taken to prevent tho emission of sufficient quontiTies of pollutants to result In undesirable levels. Give the source and Then tho abatement method for each source. Please Include Information such cs drawings, manufacturer literature, specification, caoacItlos and efficiencies needed for evaluation of such control equipment and tech niques used in conTrollir.g each scurco, Fleaso Include dele that oach osttmaTcd data operation will begin. Any inforr.'ition about the method used for abateing tho source will facilitate tho evaluation of The application. Stock. No. 1-77 - Process Waste Incinerator. The No. 3 Incinerator will be the Control device far the present vinyl chloride monomer (VCM) plant and present VCM tank car loading focilities. The No. 3 Incinerator system will operate parallel to the two existing incinerators. Liquid organic waste from the. Bottoms Plant and gaseous waste from the liquid-phase EDC, OHC-EDC, Per/Trichloroethylene, "Tri-Ethane" II, end the VCM will be incinerated. The incinerator unit is being manufactured by Trane Thermal Company, Conchohacken, Pennsylvania. The No. 3 Incinerator operating temperature of the combustion chamber will be 2200 F. and retention time will be c minimum of 0.75 seconds. The combustion air capacity Is designed at 750,000 scfh. The No. 3 Incinerator will be equipped with an auxiliary burner for added flexibility In operating the system. The combustion gases from the incinerator pass through the heat recovery boiler system and thence to the scrubbers. The Incinerctor will have c primary (acid absorber) scrubber and a secondary scrubber. Each of the scrubbers is designed for adequate gas distribution for scrubbing. Details are shown on Exhibit V, attached. The secondary scrubber will be monitored from the stock with analytical instrumentation for VCM end chlorohydroccrbons and in accordance with requirements of EPA regulations. Exhibit V - Schematic of No. 3 Process Wcste Incinerator System. The combustion of the vent gases from the present VCM facility, i.e., manufacturing unit and VCM tank car loading, is shown cs Exhibit VI. The No. 3 Incinerator vent gas flow rote is shown as Exhibit VII. 5 * - SL 07823 6. AUTHORITY AND CERTIFICATION This application is submitted in accordance with the provisions of the Regulations of the Air Control Commission, State of Louisiana. I. ____ J. R. Farst certify, under the pro- visions in Louisiana and United States lav/ which provide criminal penalties for falsa statements, that this Application for Approval of Emissions, including all attachments thereto, contains information which is true and correct to the best of my knowledge and belief. Company Signature of Responsible Officer P. O. Box 1000, Lake Charles,LA 70602 J, R. Farst Address Name of Responsible Officer Assistant Works Manager Title of Responsible Officer 882-1200 Ext. 2348 Telephone No. T. C. JEFFERY REG. No. 5591 REGISTERED PROFESSIONS ENGINEER fi X ' Thomas C. Jeffery, Manager, Development and Licensing Name (typed)' and fi'tTa" 5691 Professional Lngmaering Registration No. Louisiana State Registered SL 078233 V 1f'! SL 078234 .M , 1*: ny.-r i'^n -,-pp^nSi uus cHAJtiB, toudbi tX.ul) Al I r-T^NT HFiAwlNC, - . v * -- t1 * SL 078237 FP6 mUSTF/EC, INC. LAFF FwWLEE, LA. "NNtMAnC OF PROCESS WASTE FDR EXHIBIT N9 Y 3 I/VCI.NFFA7QR W/7Z/ .!'NRUBBER /IN 7-77 SAT lot?. SL 078238 i PPG ZNDUSTF/ES, INC. SCFEMAZ/C OF PROCESS' WASTE FOP EXHIBIT A? JT LAEF CFARLES, LA. #/ I "E Z/VC/Z/FFATOF WELL SCRUBBERS /T17-77 SETTLE!2 SL 078239 SL 078235 TO /HC//VERATOR TO VC STACK FROM SPHERE TO SPHERE SCHEMATIC OF I/CM TANK -CAP / GAPING PPG /NDUSTP/PS, /AC. LAKE CNAPLES, lA. SCPEMAF/C or VCM rAA//r CAP LOAD//VG rx/6/r //? m DATE- //-/7- 77 SL 078236 COMPOSITION OF VENT GASES FROM VINYL CHLORIDE MANUFACTURING AND VCM TANK CAR LOADING COMPONENT Nitrogen Vinyl Chloride 1, 2 Dichloroethane TOTAL LB/HR 2224 1916 58 4198 WT % 53.0 45.6 1.4 100.0 EXHIBIT VI SL 078240 NO. 3 INCINERATOR VENT GAS FLOWRATE NITROGEN CARBON DIOXIDE WATER VAPOR OXYGEN HYDROGEN CHLORIDE CARBON MONIXIDE CHLORINE NITROGEN OXIDES PARTICULATE MATTER HYDROCARBONS TOTAL LB/HR 47,536 16,302 15,236 2,179 3 4. 5. 26, 12. 1. 81,304. EXHIBIT VII SL 078241