ABDOO136560 ABERDEEN CHEMICAL PLANT INDUSTRIAL HYGIENE MONTHLY REPORT (^Month: January. 1986^1^ Date of Report: February 20, 1986 ROUTINE CHEMICAL DOSIMETRY All Sample Results CHEMICAL < PEL NO. % > PEL (OVEREXPOSURES) NO. % VCM Lead Total Particulates 83 98.8 14 82.4 6 100.0 1 3 0 1.2 17.6 0.0 Overexposures JOB CLASS EXPOSURE SOURCE Chief Operator Color Weigh Compounder 53.4 ppm, VCM Employee overexposed while working next to a new unit filter pack change. K 134.7 Micrograms Lead/MJ Employee overexposed while weighing up Cyastab 523, 564 and 988 in the color weigh room. Compounder 61.7 Micrograms Lead/MJ Employee overexposed while charging Line III blenders with Cyastab 564. Compounder 36.6 Micrograms Lead/M"* Employee overexposed while charging Line III blenders with Cyastab 564. * Respiratory protection was worn. VENTILATION The quarterly check of the compound ventilation system revealed decreased airflows through the Line III blender hoods. The hoods were then cleaned out by operations and re-checked, showing the flows to be back to acceptable levels. RESPIRATORY PROTECTION The plant's respirator program was revised and submitted for approval. ABDOO136561 Industrial Hygiene Monthly Report Page 2 IV. OSHA HAZARD COMMUNICATION STANDARD The plant's hazard communication program was revised and distributed to plant department heads for comment. Copies of Tel-A-Trains "Chemical Safety, Parts 1 and 2," videotapes were ordered for use in hazard communication training. Ringbinders for the plant's "Hazardous Materials Reference Books" were ordered. V. SHORT-TERM VCM EXPOSURES One set of short-term VCM exposure measurements was made during blanking of 744 reactor. The measurements were made, using REAL "Minimonitors" worn by three mechanics while they performed the work. As shown below. Mechanics "A" and "B" confined their work to blanking out the bottom of the reactor, while Mechanic "C" blanked out the condenser. Conclusions concerning the need for respiratory protection during this job are being deferred until additional samples have been taken. Mechanic A Sample Time (Min.) 145 TWA Result (ppm, VCM) < 0.1 Work Task Blanked out bottom of 744 reactor. B 160 < 0.1 Blanked out bottom of 744 reactor. C 160 5.1 Blanked out 744 reactor condenser. c: JF, JWW, DWH, PJK, WFH, CRS, VEM, RAF, AHS, CWT Tom Grumbles, J. R. Drumwright, M.D. - Houston %< PEL VCM u ABDOO136562 ABERDEEN CHEMICAL PLANT CHEMICAL DOSIMETRY TRENDS Lead 9 TOO! lotal Particulates '8F QT