<>>oM in>he LocMioN) w< f. Taffee - Anniston, Alabama
rm i August 5, 1968
subject . CEA 1430-1452 Construction Progress
TO : W. A. Kuhn General Offices
1j. 1j. Faulkner J. C. Landwehr W. B. Papageorge H, L, Williams
These photos taken August 1, 1968 show progress over the past five working days,
UiSJ-A-i* looking southeast, shows the roofing installed on . the*north bay, east side. Two dry valve houses are visible
on the east side of the building also,
Jho,tp,,. 2; Looks north from the third floor of Building 28.
The most obvious change is in the flaker platform, where
forms are in place for the poured concrete floor, visible
on the west side of the building at about the elevation of
the eave line,
'
photo 3 6 4: These pictures pass from the location shown in photo 2 around to looking almost due west. Most of the work in these areas is of a nature that does not show well in the photos.
W. F. Taffee Enel