Document Qgv9gy0KmrxGw4jKRkZkmx0y6
AR226-2403
v
INTEROFFICE MEMORANDUM
Dates From
Depts
Tel N&s
7-JU1-1S89 Ol!i0pm MILLIAM E CRAMLEY
CRAMLEME PPD-"TEFLON"TECH
304-863-2742
TOi Howard A. Smith
( PPP46S AT ISCDWM2 )
Subjects C-8 in Groundwater-BWftpli-rig Way -1399
from
Prior to the local community
Site's decision
water supplies,
to not take any more samples a set of sampler were taken
in early May this yew. The results of this sampling follows
SAMPLE
PPB C-8
Site test well 27,
5/4/8S>
0.44
^12 drinking fountain, s/e/es
none detected
Lubeck Mater (Pla^tis), 5/7/89
0.73
L(iRttilteenHooucrk),ing3/4M/a8t9er
contaminated sample, analysis not possible
Me have been and continue to work with only small numbers of sample results. Therefore, th results shown her are eneourasing in that they do show a downward trend in the level of C-8 (see March meeting handouts), but we must be careful since we are looking at such a small number of sampling events.
During May, the decision was mads not to run any more
samples on off-site water supplies. Me will, however, continue
to sample the test well 27 snd 8212 drinking water quarterly.
BIDO'79088