PLANT MANAGER'S SAFETY BOARD MINUTES OF FETING February 27, 1985
I. PLANT STATISTICS A. Texas City Plant Safety Performance Summary - January
INJURIES WITHOUT LOST WORKDAYS (medical treatment only)
LOST WORKDAYS CASES RESTRICTED ACTIVITY DAYS AWAY FROM WORK CASES
FATALITIES
TOTAL RECORDABLE CASES
1984 JAN YTD
00
00 00 00 00
00
1985 JAN YTD
00
00 00 00 00
00
1985 TARGETS
4
0 0 0 0
4
INJURY RATES PER 200,000 MANHOURS
TOTAL INJURY-TIR TOTAL RECORDABLE-TRR TOTAL LOST WORKDAY-TLWR DAYS-AWAY-FROM-WORK-DAWR
1984 JAN YTD
1985 JAN YTD
1985
1985
MFIC
TARGETS TARGET 1984
9.50 0.00 0.00 0.00
9.50 0.00 0.00 0.00
5.91 0.00 0.00 0.00
5.91 0.00 0.00 0.00
__--
0.30 0.00
--
___
0.80 ---- -
___
0.82 0.21 0.19
B. Off-the-Job Safety Performance
Cases
Frequency
January
0 0.00
POLICY CHANGES
A. Fire, Entry and Special Permit Procedure
The elimination of leadman' s signature on permits has been reviewed with operating and maintenance field personnel. A statement on the policy change will be issued by Tom Ryan to be conveyed to all personnel. This change in procedure will take effect March 18, 1985.
SC 002396 LAIV1003603
PMSB Minutes of Meeting - February 27, 1985
Page 2.
III. ACTION ITEMS
A. Ex-Battery Limits Pipelines
This issue has been settled and the original document with a few revisions will be followed. Exceptions to the policy will be defined by Manufacturing and Distribution and conveyed to their personnel.
B. Chemical Matrix Data
Chemical matrix data sheets will be developed for units and labora tories. These will be reviewed by a committee to assure uniformity. Sheets will then be displayed in high visibility locations for use by all personnel.
C. Instrument PM Lists
Reviews are now taking place. Updated lists will be made available to all necessary personnel.
D. Annual Safety and Housekeeping Inspection
Action items need to be reviewed and a status report given at next month's PMSB.
E. Painting of Safety Shower/Eyebath
An estimate was made of the cost of painting safety showers and eyebaths in the plant with high visibility fluorescent green paint. The cost for this work would be approximately $50,000 for the plant (over 400 units). PMSB approval given. Information will be disseminated to the units concerning this.
/dgb
R. T. Hammann
SC 002397
LAM003604
PLANT MANAGER'S SAFETY BOARD
Bostick
0-8
Forsthoffer 0-5
Gatewood
1Z
Hammann
0-22
Hanmond
0-12
J. S. Hagood B. C. Lancaster J. D. McPhail D. W. Metten S. G. Pappas
0-7 CED 0-6 OA-19 0-10A
G. T. Ryan G. E. Smal 1 G. L. Tromblee
G. L. Wofford
0-5 0A-12 0-10 OA-7
PMSB Meeting Minutes Distribution:
Anderson, W. T. Attra, R.
Barfoot, D. A. Bailey, E. P. Bell, E. W. Berry, A. M. Bobo, W. R. Carlisle, J. F. Conrad, A. H. Curtis, B. P. Cruse, C. M. Danner, G. A. Daues, G. W. DuPuis, E. R. Eby, R. T. Evans, P. W. Fritz, R. M. Gaul, J. Hancock, C. M. Haynes, W. M. Hernandez, R. A. Jackson, R. S. Juhl, W. G.
0-18 OA-19
51D 11 OA-19 SS-14 SS-14 OA-4 0-5 2R-46 PER 0-21 0-21 0A-13 0A-11 0A-11 1R-16 AB-1 0-21 0A-13 OA-3 0-10A OA-13
Kos, D. D. Lacy, H. M. Latimer, W. W. McCune, L. C. Meisetschlaeger, G. Newman, S. 0'Donnel 1, W. Osburn, V. P. Orum, G. A. Parker, R. V. Parks, J. C. Pease, D. Reid, W. Rolingson, W. R. Saunders, P. K. Schroeder, H. Sharp, R. Trafton, J. G. Triplett, W. H. Uriarte, A. K. Vanderhoven, P. Walker, W. D. Wise, D. R.
Yeretsky, S. J.
OA-9 0-6 0-13 0A-11 0-7
0-21 ED SS-14
2PD 0A-9 0A-9 AB-3 OA-19 1R-16 3R-16 OA-19 PER 0-6 OA-4 2R-2 OA-19 0-4 OA-13
OA-7
3/5/35 NOTE: Notify Dorothy Bibby (3069) of any changes to the above mail codes.
SC 002398