Document QgYLoQkwj66vYYJZpKNV0jge7

ESCAMBIA PUANT INTEROFFICE MEMORANDUM To: Mr. E. A. Ray From: Re: Mr. Dale H. Francke March PVC Material Balance Dote: Copies: 10 April 1974 /R. E. Jones A. K. McMillan E. A. Primeau Attached is the March 1974 Material Balance for the Escambia PVC Plant. This is the second month this balance has been run and the first month of reasonably complete data. Calculations were made based on averages of data collected. Improvement in the analyses and flows will still he worked on so that accuracy can be improved. Hopefully data from continuous sam pling of the dryer vents, the blend tank vent, and the condensor vent will be used for about one-half of the April Balance when the Bendix Unit in the Finishing Building is operable. The overall balance for March shows an unaccounted loss of PVC-VC1 of 1. 90%. This is an improvement in accountability over February by . 7%. The overall accountability for the first two months of the program is 97. 77% or an overall lass of 2. 24%. DHF:bp Enclosures (2) Dale H. Francke AP00035I90 PVC - VC1 MATERIAL BALANCE PACE FLA^T MONTH OF March 1974 A. 1. VC1 Charged (based on billing weights) 2. VC1 Weight Difference B- PVC Out to Product: 1. PVC to Prime 2. PVC to off-grade Total PVC To Product Pounds 6, 825, 921 24, 087 6, 237, 000 224. ooa 6. 461, 000 % of VCl Sub-Total Charged Total 100. 00% . 35 91. 37 3. 28 94.65 c. | j PVC Losses 1. a) PVC to dump from Reactor bldg. b) PVC to dump from Dryer bldg. Subtotal to Dump 2. a) South. Dryer Discharge b) North Dryer Discharge Subtotal nut dryers 3. PVC to Pond in Effluent Water 3 8, 235 2, 315 40, 550 52, 41L 17, 274 69, 685 22, 230 Total-PVC Losses 132, 465 .56 .. 03 . 77 . 25 -59 1. 02 . 33 1. 94 D- Vl Losses , 1. a) South Dryer Discharge b) North Dryer Discharge , Subtotal from Dryers 2. VC1 in Effluent Water 3. VC1 from Open Reactors 4. VC1 in Blend Tank Vent 5- VC1 in Condensor Vent 6. a) YC1 from South Stripper b) VC1 from North Stripper Subtotal from Striopers . 7. 8. 9. VC1 in Vented Reactors (recorded) VC1 from Recovery System VC1 from. Venting Charge Pump Total VC1 Losses 1, 910 3. 034 4, 944 1, 004 2, 289 5, 581 4, 548 6, 198 891 7, 089 40, 000 12, 493 545 7R. 493 Total Accounted For Out 6 696. 045 \ Total Un -accounted For 129. 876 ^ - w Efficiency to: Prime Off.Gra.de Overall 91.3,7 3. 28 94, 65 Vria % ^0 - - ----- --------------- - -- 03 .. 04 .09 01 . 07 . 02 . 03 . 08 . 07 . 10 .59 .18 . 01 1. 1L 98. 09 1. 91 > ooo. i i i i ; , 1 ( ! * H ja i a U P tG INCH ^3a mm*m n-pp .nweaiaar^ww AP00035192