Document QgMjOx1Q01X4R58zjJ6rkL4zv
Company confidential
\ ANNISTON AROCLOR CLEAN-UP
Engineering Parameters and Recommendations for
Eliminating PCB Loss to the Environment
*
Johnnie Etheredge
April 28, 1971
035659A
I
TOWOLDMONOQ57529
Aroclor Removal Devices
1. \ Curbing around drumming and blending areas
2. Use buckets and pans for small leaks until repaired
,
3. Use adsorbents to clean up spills -- Anniston uses Oil Dry (trade name)
4. Use buckets at sample ports
5. Do not use detergents for clean up
6. Segregate contaminated and uncontaminated water
7. Carbon towers to remove PCB from product HC1 acid
8. Brink mist eliminators in off-gas lines drop PCB back into process
9. Condensers in off-gas lines, PCB recycled
10. Catch tanks in vapor lines
11. Drowning jets for vapors before emission to atmosphere
12. Keep vessels buttoned up
13. Use a sump in effluent line
14. Limestone pit -- HC1 is present in effluent
15. Carbon adsorption of Aroclor from plant effluent
16. Evaluation in progress -- Aroclor adsorption on a less expensive adsorbent
than carbon
'
0356595
TOWOLDMONOQ57530
AROCLOR WASTE SUMP
The 'purpose of an Aroclor waste sump is to separate and collect entrained Aroclor from the waste effluent. Aroclor (PCB) existing as a second phase may be removed from the waste stream through the use of a properly designed and operated sump.
Leaks and spills are generally major contributors to effluent contamination. Because Aroclor is heavier than, and almost insoluble in water (solubility of 300 to 400 ppb), a correctly designed sump will efficiently collect entrained Aroclor. A sump presently used at Monsanto's Anniston, Alabama plant in the Aroclor manufacturing process effluent stream yields an effluent below Aroclor solubility level.
The sump operates with an inlet stream flow of approximately 250 gpm containing HC1, Aroclors, process water and grit washed through the sewer system. The Aroclor removed (plus the solid grit material washed in through the sewer system) is collected in the bottom portion of the sump and pumped out at three month intervals, unless of course a major spill should occur.
The sizing of a sump is usually done by one of two methods or a mixture of both. The classical theoretical approach of determining settling velocities requires that both particle size and density must be known. The classical approach becomes complex because each type of Aroclor has a different particle size and density. For this reason a generalized approach, applicable to the range of Aroclor products produced at Anniston, has been developed for sizing a sump to collect this range of Aroclors.
The generalized approach combines these variables in a constant "k" called the sizing factor. The sizing factor along with the flow rate will give a surface area sufficient for settling Aroclor if the flow is evenly distributed along the inlet end of the sump. Space availability, terrain and other physi cal limitations can determine the width and length appropriate to the calcu lated surface area. Remeitfoer -- for efficient operation the inflow must be evenly distributed along the inlet end of the sump.
F.R. Formulas S.A. jj"
Where:
2
S.A. Surface area in ft.
F.R. * Flow rate in gallons per minute
gal
` k 1.66 win. ft 2 * sizing factor
rl-
03565%
Exan\ple: Anniston sump design F.R. 250 gpm
\ Therefore: S.A. -
gal. 250 Bin.
,
MiTi.--ft.
S.A. * 150.6 ft.2
Anniston sump is 10 ft. by 15 ft., or S.A. * 150 ft.^.
Three important factors to be considered in determining the depth of the sump are maximum possible spill, frequency of clean-out and turbulence created by incoming flow. The maximum possible spill can be determined by examination of the processing unit. Frequency of clean-out can be determined by available manpower and equipment. Correct distribution of the inlet flow across the
inlet side of the sump will minimize the turbulence. There are several methods of distributing the flow. The Anniston sump has three inlet streams entering below the liquid level. An examination of the cut-away sketch #1 in Appen dix A will explain the principle. A minimum vertical separation of 2 to 3 feet should be maintained between settled material and influent stream. The inflow enters the sump below the liquid surface to prevent mixing of floating organics that may appear.
The operation of a sump is simple and for that reason the necessary precautions for efficient operation are often overlooked or conveniently pushed aside for later consideration. However, to maintain efficient removal of Aroclor,
caution should be exercised during operation of the sump. A few potential problems that may occur are listed below.
Potential Problems:
,'
1. Solids washing into sump will be collected and, depending on character of solids, could be a problem in removal.
2. Regular cleaning is required to avoid overfilling the storage capacity for Aroclor.
3. Introduction of detergents or emulsifying agents (e.g., floor clean ing) will have a serious deleterious effect on sump efficiency.
4. Prolonged periods of operation at flow rates higher than design
capacity will result in decreased efficiency.
5. A sump alone will not remove materials lighter than water.
6. Care must be taken to prevent stirring of the settled Aroclor if cleaning is attempted while the pit is in operation.
7. A floating organic film with a high Aroclor content may appear on the sump surface.
These are only a few problems that must be"considered if a continuously
efficient operation is to be achieved.
-2 -
Construction Details:
The solids that are washed into the sump create a problem when an attempt is made to remove the collected Aroclor. A sump pump that will handle the solids should be installed. Anniston uses the services of a commercial septic tank cleaner (Honeywagon). Neither a sump pump nor a Honeywagon removes all solids unless the pit is stirred. Therefore, a periodic shutdown of the sump is needed to achieve a thorough cleaning.
To prevent floating organics and trash from leaving the sump an underflow arrangement is used (see sketch #1, Appendix A). Because the floating film has a high Aroclor content a surface type skimmer is used in the Anniston sump. The surface skimmer used at Anniston is a model 610 Brill skimmer manufactured by Oil Skimmers, Inc., Cleveland, Ohio (see Appendix B). The tubing used by Anniston in the skimmer is Tygon R-3603 manufactured by U. S. Stoneware and lasts approximately four weeks per tube during continuous 24 hour service.
The Anniston sump has an acid brick and leak-proof membrane lining because the waste stream is slightly acidic. If the waste stream is not acidic, leak-proof concrete walls and floor are sufficient. ACI Standard Building Code was used for all reinforced concrete. A description of the acid brick and leak-proof membrane follows.
-3-
0356598
<$/ ee.:
,
vO,c/r^ -
-fT
jr fT
/d f ?,
.
.
XhoTaTed i?y c/ep7^ &i SJHtTi//oi //if/oCrd f'fc. cut/ fadTers shied ere?rlerf
M&Teri&l oi Ctoi&TrocTiSbJ'. . .
/fc/d fidd
i>rvc //Med re/A/P<Prc<td e&/ycrc-Tc 1$/,^ oc,J,c c?r-^d
rcsnJa nT m-m bro//e kc-ftoccH bnck q//d c<P//creTe,
fic.td >nch.
.
ffctd r&ii$Tani McrTac ~ f&n/ittir fbnw fhcd^r "6" <s>r I &>7/t> /.' S
Z
CCMcrcTe rs/aforc^d r%or cr uoqII
(rrreo7 /Z' M ceded
- fr/Mcr -'fe/i/tfris/ic *// er
CcdT>/J^ - fet/f/ttol ^/ot dr F<y.'z I ~
HeiH'fbx/.eKei'X'fertHf/y ^/n
"^t>a/
CtoX/N<3 * Te///Ht>dT *v<?/ f/-
r\ 4 fv
0356599
|
TOWOLDMON0057534
ftnFIiUI* /1 AtiNISTOH : /f/fOCIOK \V/t5TE SU/A p
#7
SpliNtiJt 7^credjcj e
3/U'/f'/
TOWOLDMONOQ57535
TOWOLDMONOQ57536
The MODEL 610 BRILL SKIMMER is designed to gather and remove oils, greases and floating oily scum from the surface of water, coolants or cleaning liquids. This unique process permits the re-use of these solu tions, thereby effecting substantial savings. It also assists in complying with government regulations concerning the disposal of greasy, oily or gummy con taminating liquids directly Into sewers or natural watersheds.
HOW IT WORKS The MODEL 610 BRILL SKIMMER gathers floating oil and grease, and elevates it to a maximum of forty feet from the liquid surface of scale pits, sumps, settling pondp or streams. This effective process is accomplished with a closed loop of special tubing, constantly moving and floating on the liquid surface. Floating greases and oils adhere to the outside of the tubing, and are conveyed up to a separator, where all greasy and oily contaminates are removed and drained into storage tanks. The cleaned portion of the tubing continues Its orbit and returns to the sump or reservoir to repeat the gathering process. The MODEL 610 BRILL SKIMMER fulfills a three-fold purpose, first, the original coolant is cleaned for re-use, second, oily wastes are consolidated with minimum water so that disposition Is greatly facilitated, third, a substantial amount of fine solid contaminants are removed with the oily scum.
GREASE OIL SLUDGE
skimmers
Manufactured by OIL SKIMMERS INC. a division of
The G. Brill Co., Cleveland, Ohio 44147
TOWOLDMON0057537
tE3[
CD
*
---------- s-------------- r4--1--------
| ;--rr
vll.l_____ -J
'
J----------------- Va
----- A---------- -- 205/i -------------------------- 1
---------- 36 --XX-----------
PART NUMBERS AND NOMENCLATURE
1. DRIVE WHEEL la. DRIVE WHEEL CHAIN 2. PRESSURE WHEEL 3. BASE 4. SCRAPER
5. COLLECTOR TUBE 6. REDUCER 7. ELECTRIC MOTOR, Va hp/
1725 rpm/TEFCBB 230/440 volt, 3 ph. 60 cycles 115/230 volt, Sph, 60 cycles 8. TUBE: GUIDE '
9. OUTRIGGER
FEATURES AND SPECIAL INFORMATION
Compact, rugged construction, designed to fit into small areas.
Self-regulating, will collect heavy greases and oils at an aver age rate of 800 gallons per day.
Removes floating oily scum containing high concentrations of grease, oilcoated'dirt, lint, paper, metal chips, and detergent gum.
The MODEL 610 BRILL SKIMMER is sturdily mounted, being bolted to a 4"x4" angle iron, which is secured to the edge of the sump or collection pit.
To determine the length of collector tube needed for your application, this simple formula Is recommended:
DOUBLE THE AMOUNT OF HOSE NEEDED TO EXTEND
FROM THE BRILL SKIMMER UNIT, TO THE LOWEST AVER
AGE LIQUID LEVEL IN THE PIT, THEN ADD 12 ADDITIONAL
FEET, this will allow adequate tube surface when the liquid
level fluctuates, permitting tube to float over and around
debris, trash or any floating objects in the pit without
tangling.
.
distributed by
OIL SKIMMERS INC.
Phone: 816.237.6iei
a division of THE G. BRILL CO., CLEVELAND, OHIO 44147 |
216-946-7747
- 8-
0356603
TOWOLDMONOQ57538
INSERTING TUBING IN MODEL 610 BRILL SKIMMER
A. Remove backplate, apply power and check direction of rotation.
B. Squeeze new tubing under tube guide lift up helical $craperand wind In tubing.
B. Rotate motor coupling until tubing passes under pressure wheel (2) insert tube between
inner and cuter rows of :eeth on drive wheel up to the next pressure wheel
A. Press down tubing between sprocket teeth, and continue to rotate drive wheelQin proper
direction until tubing is past second pressure
wheel
A. Continue to insert tubing past next pressure wheel by repeating previous Instructions.
CHECK LIST
Tubing in proper opening at right of spout --under tube guide-through hel ical scraper-between inner and outer teeth of drive wheel --firmly held in place by four pressure wheels- place tubing In opening on right side, extend along outrigger through the guide yoke, and over the outboard wheel. Unit is now ready for operation... be certain that motor will drive unit In proper direction,
OIL SKIMMERS INC.
1803 W. ROYALTON ROAD . CLEVELAND. OHIO 44147
A DIVISION OF THE G. BRILL CO. CLEVELAND, OHIO -,,9 ,
0356604
TOWOLDMONOQ57539
AROCLOR REMOVAL - HCL LIMESTONE NEUTRALIZATION PIT
'Introduction;
The Monsanto, Anniston, limestone neutralisation pit serves a dual role --
neutralization of waste Muriatic Acid (HC1) and removal of both dissolved
and entrained Aroclor. Limestone neutralization is satisfactory in Anniston's
case since the HC1 does not form insoluble salts with the limestone. The
limestone quarried and crushed within 30 miles of the plant site represents
the most economical alkali source in Anniston's particular case.
.
Neutralization of the waste HC1 is accomplished by gravity feeding aqueous
HC1 through a bed of limestone rock. The removal of Aroclor is effected in two methods. First, the limestone pit serves as a large settling basin to collect entrained Aroclor. Second, the soluble Aroclor is apparently adsorbed by finely divided inert residue freed from the limestone rock during neutrali zation of the aqueous HC1.
The effectiveness of the limestone pit in removing Aroclor was determined by laboratory analysis. Analysis of samples taken daily over a four month period of both the influent and effluent revealed a very significant drop in Aroclor levels across the Anniston limestone pit. At the present time, daily analysis of the pit effluent indicates average Aroclor levels far below the solubility level (300 to 400 ppb) of Aroclor. However, the low numbers cannot be main tained if detergents, emulsifiers or solvents are present in the effluent. In other words, any agent that increases the amount of soluble Aroclor in the waste stream decreases the amount of Aroclor removed by the limestone pit.
Size and Analysis of Limestone;
.
Anniston uses two sizes of limestone -- #2 and #6. The #6 is smalls 5% passes
through a 3/8 in. screen and 100% passes through a 1 in. screen. The small
rock (#6) neutralizes the HC1 quicker than the #2 limestone because it has
more effective surface area. However, if the #6 is not handled with caution
it will compact in the pit and a loss of pit size and life will be realized.
The #2 limestone is 1 in. to 2 1/2 in. in size. Neutralization takes a little
longer but the compaction problem is minor. At the present time Anniston is
using the small #6 limestone in the first 20 ft. of the neutralization chamber
and the large #2 limestone in the rest of the neutralization chambers. A
chemical analysis of the limestone used in the Anniston HC1 neutralization pits
is as follows:
"
-
. SlOj Plus Insolubles
R23 CaCOj Mg COj
2.446
' 0.80 93.459 3.116
Sizing of Limestone Pits:
The shape and size of limestone pits used by Monsanto, Anniston, were developed
for a specific set of variables and conditions present in the Anniston Plant.
No known set group of theoretical equations will logically fit the sizing of
the type 6f pits used by the Anniston operation.
'
10 -
0356605
The numerous variables to be considered in sizing a limestone pit requires methods other than theoretical formulas. Flow rate, HC1 concentration, Aroclor concentration, length of pit life desired, available property for pit, chemical analysis of limestone, size of limestone available, efficiency desired for Aroclor removal, HC1 neutralization efficiency and material other than HC1 and A,roclor in the effluent stream are a few of the many variables involved. An effective and efficient limestone pit operation depends entirely on a thorough Investigation of each variable. Therefore, it is recommended that a pilot model be operated before a full scale operation is installed.
Although it is not recommended to use the Anniston operation as a proportional method of sizing other operations, it may be of value to know a few Anniston variables. These items may give an idea of what to expect.
1.. Waste influent
a. Flow - 700 gpm avg.
. b. HC1 concentration - 1% approx.
2. Retention time for neutralization - 15 to 20 min.
3. Total pit retention time - 25 min. avg.
4. Effluent from limestone pit
a. Solids
(1) 50 ppm avg.
(2) 1.5 to 250 microns
b. 100 ppb PCB avg.
Description of Facility;
Monsanto Anniston has two limestone pits designed and located for continuous operation. A flow diagram (fig. 1) shows how the pits are arranged and connected together for simultaneous or individual operation. For clarity in description the pits are numbered pit #1 and pit #2.
Reading the description of the two pits will reveal a discrepancy in size and arrangement of baffle walls. Although phe pits are not identical they both work reaspnably well. Experimenting in the field as to the best method of size and arrangement caused the discrepancies. Presently the recommended approach is pit #1 for operation and efficiency.
- 11 -
035660b
TOWOLDMONOQ57541
TOWOLDMONOQ57542
Limestone Pit #1
Fig. #2 Dwgs. D1300-C1-A
D1300-G1-A
Limestone pit #1 originally built for HC1 neutralization only is presently,
after minor revisions, used for neutralization and Aroclor removal. The physical dimensions and characteristics of pit #1 are as follows:
The influent flow measurement weir is a 6 ft. by 7 ft. acid resistant bricklined reinforced concrete box with a 12 in. wooden 90 V-notch weir.
The grit chamber measures 32 ft. wide by 20 ft. long at the top with 1:3 side slopes. The depth of the grit chamber is 4 ft. The walls and bottom are
reinforced concrete. Baffle "A" is an overflow baffle that forms the downstream end of'the grit chamber. The baffle is made of reinforced concrete 1 ft. thick by 32 ft. long by 5 ft. deep.
The neutralization chamber is 120 ft. long by 50 ft. wide at the top with 1:3 side slopes and 7 ft. deep. The neutralization chamber is the only portion of pit #1 to be filled with limestone.
Baffle "B" is an underflow baffle. See drawing D1300-C1-A for description.
The settling basin has two compartments. The first compartment is a 17 ft. continuation of the neutralization chamber void of limestone. The second
compartment is a reinforced concrete box 14 ft. long by 27 ft. wide and 10 ft. deep. The second compartment is sloped 1 ft. in 7 ft. from upstream to down stream end of the basin. A perforated suction pipe is used at the low end to pump inerts coated with Aroclor from the pit. Effluent leaves the pit in an overflow standpipe. The elevation of the standpipe controls the level in the pit.
The entire pit is coated with Lion
oa^ asphalt. * The neutralization
chamber has a 12 in. protective sand cover over the asphalt. See Appendix
for Lion Technical Bulletin CA fpr subgrade preparation and application of the
asphalt.
- 13 -
035bb08
TOWOLDMONOQ57544
Limestone Pit #2
Pig. #3 Dwg. 1300
Pit |2 is 200 ft. long by 60 ft. wide at the top with ls4 side slopes and approximately 6 ft. deep. The influent stream is distributed across the width of the pit through an 18 in. perforated Flextran pipe.
The Flextran pipe, product of Johns-Manville Company, was perforated by Anniston
personnel for the ejected flow in the Anniston Plant. The perforations are
2 in. holes 1 ft. apart.
.
Baffle "A", 66 ft. 6 in. from the distributor, is an overflow baffle. Baffle "B",
66 ft. 6 in. downstream of "A", is an underflow baffle. See drawing 1300 for
details.
''
All of the pit from distributor to baffle "B" is filled with limestone. The last section of the pit from baffle "B" to the overflow has 30 ft. of limestone and 36 ft. of settling area.
Effluent leaves the pit through a wooden 12 in. 90 V-notch weir.
The entire pit, dirt surfaces and exposed.concrete, are coated with asphalt.
- 15 -
0366610
TOWOLDMONOQ57545
OQtLVIt PRESS DIVISION ORAPHIC CONTROLS CORP.. BROOKLYN. N. V. tlilT STOCK NO. 4S0
IM
I
TOWOLDMONOQ57546
Technical Bulletin CA Published by Uan Oil Company, Et Dorado, Arkansas
The old cliche thot "History repeots Itself" is certoinly true In repord to the use of ospholt down through the yeors. The Bobylonion ond Sumerion civilizotions of 2500 B.C. found notive ospholts the only onswer to waterproofing problems In their tem ples ond poloces. Mon of the 20th Century olso is finding ospholt the most sotisfoctory ond economical onswer to some of his greotest problems. Modern Improvements In petroleum refining ond Intensive reseorch have developed petroleum ospholts of many types, ond from them hove come ospholtic products especially de signed to serve mony needs in the world of todoy.
One of the newest developments from the petro-chemicol loborotory is cotolytically blown ospholt, or "cot" ospholt os It is commonly colled. Originated ond developed by the Lion Oil Com pany under potent No. 2,450,756, cotolyticolly blown ospholt, using phosphorous pentoxlde os the cotolyst, hos been widely odopted throughout the United Stotes os o principo! moteriol for 'v. controlling secpoge In irrigation conols ond water supply systems,
One of the most serious problems of the modern world is the dryinQ up of streams ond the consequent lowering of woter tobies, necessitating construction of irrigation conols, woter storage pits, ond the domming of rivers to serve os reservoirs. Before the dis covery of "cot" ospholt, irrigation engineers found o greot deal of woter being lost through seepoge, ond they tried mony methods in on effort to control the wostoge, The woter which seeps from conols ond irrigation ditches is not only lost, but usuolly collects In lower ground oreas, rendering such oreos unproductive or neces sitating the Installation of expensive droinoge systems, In 1949, the U. S. Bureou of Redomotion estimoted that of the 15,650,000 ocre-feet of woter supplied for Irrigation, 3,900,000 ocre-feet, or 25 per cent, were lost In tronsit. With, the odvent of "cot" ospholt os the Ideol low-cost conol liner, much of this woste hos been ellmlnoted.
For conol linings, "cot" ospholt is used to produce o thick, tough, woterproof membrane, formed by sproying the very hot (400'F.) ospholt on the eorth's surface. This type of ospholt, now monufoctured by o number of licensees, hos been oppfied to over 6.5 million squore yords of conols ond reservoirs for seepoge control during the post five yeors, ond its use is constantly expand ing os new needs ore found for this versotile moteriol. Extensive tests mode by the U. S. Bureou of Redomotion in connection with conol lining construction, using the Lion cotolyticolly blown ospholt, hove shown the product to hove unusuol durability chor-
octeristics os well os o toughness ond flexibility which moke It unexcelled for this purpose. Experience hos shown thot, not only `is this type of construction probobly one of the most efficient meons ever developed for the control of seepoge, but It is the most economicol both In Initiol cost ond in length of service.
Although originally developed for the control of seepoge of Irrigation woter in conols ond reservoirs, newer uses Include con trol of Industrial wostes, preventing pollution of Qround woters, the leok-proofing of sewoge disposol ponds, the lining of reser voirs for the settlement ond filtrotion of munidpo! water supplies, ond erosion control on beoches ond form londs.
A most interesting opplicotion of "cot" ospholt is In connec tion with the foscinoting development of underground storoge for butone-propone hydrocarbons, In Scurry County, Texos, neor Snyder, the underlying salt domes become excellent gos storoge reservoirs by the simple expedient of pumping woter Into the soh domes, dissolving the salt, ond bringing the brine bock to the surfoce to be stored In pits lined with "cot" ospholt. This brine con be Injected bock into the reservoirs to lift the stored goses to the surfoce for commerciol use during the periods of heavy demond. Lion Oil Compony, Sunroy Oil Compony, Scurry Butone Products Company ond Phillips Petroleum Compony qre omong those who ore using "cot" ospholt os o liner in such brine ponds, This method of storing the brine prevents the pollution of the surrounding soil ond soves precious woter for reuse, moking possible on economicoily feosible operotion.
One of the lotest developments In the use of membrone ospholts is the stobilizotion of notural soils under highwoy ond oirfield povements by enveloping or "wropping up" these soils In membrones of "cot" ospholt. Simple, efficient ond duroble beyond oil normol requirements, yet low in cost, this method of pavement design promises to revolutionize the work of the highwoy engineer, allowing the construction of fost, smooth, high lood-carrving high ways ond oir fields ot o froction of todoy's cost.
The requirements for membrone ospholt as specified by the U. S. Bureou of Redomotion ore os follows:
The ospholt for the ospholtic membrone shotl be cotolyticolly blown ospholt cement ond sholl conform to the following specifi cations--
(ol Moteriol*--The moterlols supplied under this specifica
tion sholl be ospholts prepored only by the eotalytic-
U. S. Patent Number 2,450,756
17 -
0356612
TOWOLDMONOQ57547
. blowing treotment of osphohic petroleum. Aspholtic moteriols for which ferric chloride or other compounds of iron hove been used os cotolysts in the blowing operotion, will not be occeptoble.
(b) Generol requirement*---The ospholt shall be homoge nous, free from woter, ond shell not foom when heated to 347'F.
(c) Detolled requirements--Catolyticolly blown ospholt sholl meet the requirements shown below:
Flosh Point (C.O.C,),min........ ....................... 425F.
Softening Point (ROB).................. 175 to 200F.
Penetration ot 77F., 100 g., 5 sec.............. 50-60
Penetrotion ot 32F., 200 g., 60 sec., min....
30
Penetrotion ot 115F., 50 g., 5 sec. mox..... 120
Ductility ot 77F., 5 cm, per minute, min..... 3.5 cm
Loss ot 325F., 5 hours, mox........................ 1.0%
Penetrotion offer loss on heating, 77F., 100 g., 5 sec,, % of original, min......... 60.0%
Bitumen (soluble In corbon tetrochloride),min. 97.0%
,v APPLICATIONS--Construction requirements ore considered under 4 genera! dosses: (I) Seepoge Control, (2) Seepoge ond Erosion Control, (3) Erosion Control, ond (4) Soil Stobilizotion.
SEEPAGE CONTROL
Efficient, economlco! seepoge control con be obtoined by the use of the simple "cot" ospholt membrone. This membrone is constructed by sproylng the hot "cot" ospholt directly on the prepored, smooth subgrode, ond then covering the cooled mem brone with a loyer of soil or grovel.
PREPARATION OF SUBGRADE--New conols ond reservoirs must be excovoted to ollow for the thickness of the eorth cover over the membrone. Mony old conols ore olreody oversize os o result of erosion, so thot frequently no over-excovotion is necessory. For opplicotion purposes It is not necessory to trim the conol to ony exoct cross-section, so thot In mony coses much eorthwork con be loved by using essentioily the existing conol or reservoir. However, In both conols ond storoge pits, side-slopes must not be steeper thon I-3/4:1; otherwise, sloughing of the soil cover over the membrone moy occur. In some coses, If the cover soil is porticulorly unstoble, slopes of 2:1 ore desiroble. Subgrades should be smooth before Opptylng the hot ospholt. It is importont thot the subgrode be free of clods or large pebbles since it Is difficult to coot properly such projections. Smooth surfoces require less ospholt in the pro duction of o'perfect membrone. Conversely, o rough surface re
quires more ospholt ond greatly increoses the difficulties In obtain ing o completely woter-tight membrone. An odequotely smooth surfoce moy be obtoined by drogging first with o steel beom to knock down lorge projections, following with o smooth-foced steel roller to crush clods ond push pebbles into the subgrodes. Usually o roller weighing 50 lbs. per lineol Inch of width Is specified.
To Quord ogoinst undue weed growth, oil weeds, tules, cottoils or willows should be grubbed prior to beginning the drogging ond smoothing operofions. Where weed growth Is excessive. It will be wise to opply o good commercial soil sterilont containing sodium chlorote ond borox. This moterlol moy be opplied dry or in woter solution, not less than 8 ounces to the square yord, In the infested oreos. The sterilont should be opplied offer drogging ond rolling hove been completed,
Dry, dusty oreos of subgrode must be sprinkled with woter Immediately prior to opplicotion of the hot ospholt. Unless this is done, holidoys moy form in the membrone due to the surfoce tension of the hot ospholt. pomp, wet^ ond cold soil helps, rather thon hinders, the formotipcLof o flood .membrone.
APPLICATION OF MEMBRANE--The ospholt Is sproyed directly on the subgrode to produce o membrone of uniform thickness free from holes or holidoys. The usuol rote of opplicotion is 1.5 to 2.0 gallons per squore yard, with heavier opplicotions preferred for reservoirs and chemical ponds where leokoge moy be critical, ond for other installations where the subgrode is unovoidobly rough. Asphalt moy be opplied by hond sproys or by distributor bors con nected to o distributor with o flexible metol hose ond supported by suitable cobles or ropes. All posses of the sproys should be lopped to ovoid thin or bare oreos. Applications on side slopes ore usuolly mode prior to covering the bottom of the conol or reservoir. Such opplicotion In severol posses will ovoid excessive run-down ond puddling of the ospholt in the bottom. The tem perature ond pressure of the ospholt at the spray nozzle should be controlled to maintain o flat uniform sproy. An opplicotion temperofure of 350* to 400`F is recommended.
Rope supports or cleoted plonks should be provided for work ing on sJie slopes if the subgrode will be odversely disturbed when such meons ore not used. Roughened or disturbed oreos should be smoothed before opplicotion of the ospholt. Concrete oreos to which the membrone is to be bonded should be cleon ond free of loose moterlol, ond the ospholt should be opplied to approxi mately twice the normal thickness, topering to normol thickness ot o distance of approximately 12 inches from the edge of the con crete. If otmospheric temperatures ore low, or if the concrete is slightly domp, priming with o thin ospholt cutbock is recommended
before opplicotion of the merpbrone.
- 18
03bbbll
I
TOWOLDMONOQ57548
Adequote sofety devices such os goggles, sofety masks ond heovy gloves should be used by workmen ond sproy men,
Sproy equipment ond the distributor must be flushed with distillate prior to shut-downs or storoge. The distillote used for flushing the sproy equipment should not come in contoct with the completed membrone, ond oil distillote must be removed from the sproy system before beginning membrone opplicotions,
COVER MATERIAL---The primary purpose of cover moterio! is to hold the membrone in ploce to prevent lifting ond destruction by Sub-surfoce hydrostotic forces or flowing woters. In oddition, the cover protects.the membrone from weothering ond from mechonicot Injury such os moy result from the hooves of livestock. In generol, on eorth cover not less than 12 Inches In thickness is recommended. Groded sands ond grovels generolty form the most stable cover moteriol. Woter-deposlted silts ore the leost stoble.
Where woter velocities exceed opproxlmotely 1.5 feet per second, or where turbulence or wave oction exist, grovel blonkets of pit-run oggregote ploced 3 to 6 inches deep (or more) over the eorth cover ore odvisoble. The greater the erosive possibilities, the lorger should be the moximum site of the oggregote. If condi tions ore severe, the use of ospholt mocodom, os described, in the v following sections, is recommended.
Cover moteriol is generolly ploced by costing from draglines, but In large reservoirs roodways of cover moteriol moy be built over the membrone ond the soil houled ond spreod from within the oreo. Doting of soil cover over the berm is usually objection able since sliding soil or rolling rock moy injure the membrane.
COSTS--The cost of Burled Aspholt Membrone will vory with the type of Installation, the ovollobility of proper backfill moteriols, ond other factors. Costs on the overage type of project, which Include oil excavotion ond bockfill for o completed job, ore from 40c to 70c per square yard
SEEPAGE-AND-EROSION CONTROL
CANALS AND DRAINAGE DITCHES --In conals ond drainage
ditches where the water velocities ore high, on ospholt-penetroted
macadam cover con be placed directly on the "cot" asphalt mem
brone to prevent erosion. In reservoirs, the ospholt-penetroted
mocodom cover olso moy be used to prevent displacement of the
cover moteriol by wove oction ot the beoch line.
'
' To produce the mocodom cover, o uniform covering of grovel hovlng o thickness of 2 to 3 Inches is placed over the ospholtic membrone. The grovel should be uniformly graded with 95% re tained on o 4*-inch screen ond 100% passing through o one-inch screen. This grodinQ Is necessory In order to produce o loyer of rock
or grovel which will be sufficiently "open" to permit penetrotion by the ospholt opplied to the surfoce. After the rock or Qravel hos been corefully ploced, it is bound together ond cemented with o heovy opplicotion of "cot" ospholt. The ospholt must be opplied slowly, with o "flooding" oction, to secure deep penetration of the rock loyer. If the ospholt is opplied fost or with light sweeping strokes. It will build up on the surface ond deep penetrotion connot be obtained, From 1 ~*A to 3 gallons of ospholt per square yord ore required for thorough penetrotion of the rock loyer.
if o smooth surface Is desired, o fine oggregote possing Vi-inch ond retoined on o 1/4-Inch sieve con be applied of the rote of 25 pounds per squore yord ond keyed in by light rolling while the ospholt is still hot, Such construction con be in two or more loyers to provide o blanket of additional weight if erosion conditions ore very severe,
MEMBRANE SEALS IN EARTH DAM CONSTRUCTION--The use of membrone ospholt on the upstreom foce of doms, on the bose under the fill, ond on the reservoir floor opens up new possibilities in construction of earthen doms on sites thot before were not economically feasible.
In the "Pacific Builder ond Engineer" for October, 1951 there oppeors on interesting description of plans for on eorthfifled dom approximately 3,600 feet long and 36 feet high at the volley floor. The use of cotatyticolly blown ospholt membrone over the entire upstreom foce of the dom ond on the bose under the fill will moke possible watertight storoge of'10,000 ocre-feet of woter. The site for the reservoir had been considered severot times in the post by engineers, but wos not considered feasible with either o clay-core wall or sheet piling.
In such construction, o membrane completely covering the foce of the dom prevents seepoge from the reservoir from enter ing the fill of the dam; the membrane on which the fill is con structed prevents the water rising by hydrostotic pressure Into the fill; the membrone extended upstreom on the volley floor, for vorying distances os conditions require*, procticolly eliminotes loss through seepoge by Increasing the distance woter must trovel.
The membrone on the foce of the dom should be ;overed by a select earth or sond cushion which in turn should be covered by compacted pit-run fill. The top loyer should be slog, or stone riprop, or ospholtic concrete. The membrone on the bose of the dom (upon which the fill is to rest) should be ploced on prepared subgrode ond protected by a select eorth or sond cushion, ond in the reservoir by an eorth cover.
.
*
<> ^
With the ovoilability of cotolytic membrone ospholt, con* struction of doms Is possible In oreos where only porous soils ore
-19 -
* "The length of travel of any seepage should be 10 times the static head at the particular location. If at a certain point on the dam there Is a depth of 25 feet of water, the total length of membrane under the dam plus the membrane upstream from the dam on the valley floor should total 10 x 25 feet or 250 feet."
TOWOLDMONOQ57549
Here a Urge canal near Cody, Wyoming, (Shoshone Project) Is shown In use after seating with POj "cat" asphalt to prevent loss of valuable water by seepage.
ovolloble.' Expensive cloy core-woll or sheet-piling methods ore no longer necessory when the membrane lining is used,
EROSION CONTROL
If the seepoge problem is not important, erosion control moy be obtained reodily in ditches ond on spillwoys by the use of on ospholt-penetroted mocodam cover os described In the previous section, second porogroph. The subgrode should be smoothed before the opplicotion of the loyer of grovel (the plocement of the initio) membrone being omitted). The "cot" ospholt is then slowly "flooded" to properly penetrote the grovel.
SOIL STABILIZATION
Uses of ospholtic membranes in soil stabilization include (o) enveloping the soil base, (b) os o coplliary border, ond (c) os o shoulder or o shoulder-ond-ditch membrone. In these opplicotions the cotolytic ospholt serves os o woter-tight barrier to molntoln o low or o constant, predetermined, moisture content In the soil moteriol ond thus to stobilize the load-beoring copocity.
Solis with oppredoble contents of cloy hove high b'eoring strengths If their moisture content is maintained at o low volue, The beoring strength of such soils under such conditions is usually more thon sufficient for their use os a bose moteriol in povement construction. Loss In strength ond troublesome volume changes ore prevented by the membrone envelope, which maintains the moisture content ot o constonf predetermined volue. The use of oggregate bose courses Is minimized or eliminoted, depending on the supporting volue of the enveloped soil.
In such construction o membrane is sproyed upon o prepored plone surfoce os on o fill, or in on excovoted trench with sloping sides. The membrane should not be less thon %-inch thick to provide o reosonoble foctor of sofety with the construction methods ond stresses opplied (2,1 gol. per sq. yd.). The membrone should be corefully Inspected prior to covering ond oil thin oreos ond voids (holidays) should be corrected. The first loyer of soil, ploced to o minimum 6-Inch depth over the membrone by drag line or by dozer, is compacted by o pneumotic-tired roller or by o trock-ioylng troctor. After the Inltiol loyer has been compocted, the remoinder of the fill is ploced ond compocted by conventionol means. The moisture content of the soil should conform to normol compoction practices. On completion of the fill, the top ond sides ore sprayed with membrone to complete the envelope. (In certoin coses the top membrone moy not be necessory If on odequote woter-tight weoring surfoce is ploced in its steod). With the top membrone In position, bose construction Is ploced os re
quired, with o cushion course directly over the membrone. By means of such simple methods, existing soils con be mode into stoble boses.
Membranes con be used os copillory breoks under boses or subgrodes subject to saturation or frost oction through the presence of woter immediately below these elements. The barrier will con trol both copillory ond vopor moisture, With such a seol, the use of bose moteriols hovlng o high content of 0.02 mm. size fraction is practical In oreos where frost susceptibility is o problem. Loyers of gravel customorily used os copillory breoks but which frequently foil becouse of filling with copillory soil moteriol, ond which permlt vapor phase possoge of moisture, ore reploced by a simple, reodily opplied, osphaltic membrone.
Side ditches ore sometimes the source of destructive moisture in the subgrode ond bose. The use of ospholtic membranes in such opplicotion is entirely similor to thof in conols.
Thus Lion's new cotolytic ospholt, o product of petroleum re search, hos been found efficient ond odoptoble in controlling woter ond solution seepoge, ond for maintaining moisture content ot the desired level in engineering construction.
COVERAGE REQUIREMENTS FOR MEMBRANE ASPHALT
Weight, Ibs./gol. ot 60F............................................. 8.5 Gollons ot 60oF., per ton............................................. 235 Film thickness ot 1.5 gollonsot 60F/sq.yd........... 0.27 inches Film thickness ot 2,0 gollonsot 60F/sq.yd........... 0.36 inches Film thickness ot 2.5 gallons ot 60F/sq.yd........ 0.45 inches Tons per ocre ot1.5 gollons ot 60c>F/sq.yd........... 31.0 Tons per ocre ot 2,0 gollonsot 60F/sq.yd........... 41.4 Tons per ocre ot2.5 gollons ot 60F/sq.yd............ 51.8 Multiplier for volume reduction
to 60F. from 350F.......................................... 0.9024 Multiplier for volume reduction
to 60F. from 375F.......................................... 0.8944 Multiplier for volume reduction
to 60F. from 400F.......................................... 0.8864 Multipliei for volume reduction
to 60^. from 425F.......................................... 0.8784
For further information obout the utilizotion of membrone lining in specific coses, oddress your inquiries to
LION OIL fey COMPANY
ASPHALT SALES DEPT. gtfflTtV EL DORADO, ARKANSAS
0356615
AROCLOR ADSORPTION ON ADSORBENT OTHER THAN CARBON
A study is presently in progress to evaluate the removal of Aroclor by
adsorption on a less expensive adsorbent than carbon and then removing the
adsorbent by flocculation.
.
- 21 -
0356616
TOWOLDMONOQ57551