Document QY540ZLR58RZJY9Yn5yEyd24

3A*' CORPORATION HCTTJiTNfl PRODUCTS DIVISION SECRET . COMPANY COWfTDPTgAL RESEARCH LABORATORIES - DATE: SEF1SHBER17, 1970 SOUTH BOUND BROOK, NSW JESSE! REFORT NO. 435-10 INDUSTRIAL PRODUCTS: INSULATION PUNT RUN AT GLOUCESTER. AUGUST 11. 1970 INTkjpUOTIONi The second plant run of Calsilit* with blooehod sulfate pulp as a replacement for Aaoeit# fiber a* made at tha Glouoastar plant. The purposes of tha aaoond plant run were to verify tha phjsloal propartiaa obtained on tha first plant run and to provide suffioient Material for actual field installations. This report presents tha results of this aeoond run* DESCRIPTION CP RUN: On Tuesday, August 11, a plant run consisting of one batch of Calellits was aada at tha Gloucester plant. The sain difference between the second run and the first run sade on June 23 was the reduction la the asount of bleached sulfate pulp used to conform to the asount of Aaosite presently being used in the aanufacture of regular Calslllte, Again as in the first run the bleached sulfate was used as a replaeesent for Aaosite fiber on a lb ./lb. basis. The bleached pulp used for this run has the trade naae Skeens which is normally available at Gloucester. The saae procedure was used in the preparation of the gel batch as was used on the first run. This consisted of adding the bleached sulfate pulp a sheet at a tine to the sixer containing heated eity water. After the addition of the last sheet of pulp the batch was nixed for 10 minutes prior to the addition of Disalite. Fros this point the remainder of the batch preparation was the saae as that used for regular Calslllte. No difficulties were encountered in the molding of the block and pipe covering. The following materials were molded from this experimental batch. Presa # 1 2 4 7 8 Sise 36m x 36" x 2" block 12" x 36" x 1#' block 8" x 2)4" pipe covering 2" x 1" pipe covering 12" *2)4" pipe covering # of Pieces 40 30 40 30 gangs of 3 90 27 Sons minor squirting was encountered in the molding of the 8" x Zfl* pipe ooverlng. However, as only one of the five sines pro duced exhibited any squirting, the operators at the Gloucester plant felt that it was attributable not to the experimental batch but to the solder itself. MICH07670 OAF CCBPOBACCN -2 - SECRET - COMPANY CCNFIDSNTIAL REPORT NO. ^35-10 ------- Formal procedures for autoclaving and drying war* uaad with this experimental material* Mo difficulties were encountered and no adverse affects due to the experimental batch were apparent. TEST RESULTS i The testing of this material was done at Gloucester by the personnel In the Control Lab. A summary of the results is attached to this report: FIELD INSTALLATION: Cfa August 2?v 1970, the experimental Calsillts was placed on the 12-inch pipe along the south side of the power house at Gloucester. For this trial the old insulation was removed from approximately a 12 ft. seotion of the pipe. The old Insulation was a double layer installation. The new insulation consisted of a single layer ZH Inches thick. The first 3 lineal feet froa the righthand side is regular Calsilite, the next 9 lineal feet are Calsilite made with bleached sulfate pulp. The pipe covering wae Just wired onto the pipe. Mo attempt was made to cement the Joints or cover the entire Insulation as is normal practice. Mo difficulties were encountered with the Installation of this experimental material. The pipe covering fit very accurately onto the pipe. Present plans call for this installation to remain Just wired onto the pipe and to be in spected periodically to determine any adverse effects from this heated pipe having a surface temperature of 00* F. CONCXUSICNSi The following conclusions were drawn from this run: 1. Mo operating diffieultiea were encountered in either the batch preparation or in the molding of these products. 2. In general, the physical properties approximated those obtained on the first run. 3* The weight loss after 24-hour exposure at 1230* F. was the only property not meeting GaF Specifications. 4. Mo difficulties were encountered in the one field in stallation made thus far. RBCOHHBTOATICNSt Zt is reoommended that: 1. Additional field installations be made with the experi mental Calsilite on hand. MICH07671 QAT CORPORATION SECRET - COMPANY CONTIDBiTlAL REPORT NO. 435-10 -3- 2. The one field inatallation completed end any othere that re made be carefully followed to ascertain any adverse effects on the Calalllte of high temperature exposures. 3# Evaluate the effect of recycling filtrate water to ascertain whether this procedure would cause any operating difficulties. She writer would like to take this opportunity to express his appreciation for the assistance and cooperation he received during this plant run and for the test results supplied him. . HH:pas h. HOKXAK MICH07672