Document QXzrO55Kp3kw4Lx58w67Ljnro

HEAT STRESS INSi1 KCTION ANU AUDIT UNIT/AREA/BLDG RECOVERY AUDIT BY ____________Mario Gutierrez___________________ A. LOCATION REQUIREMENTS ,1. Potential heat stress places documented. 2. Maintenance aware if potential exists. DATE 8/29/80 YES SEE NO COMMENT _X____ _______________ (1) x. B. PERSONNEL REQUIREMENTS 1. Air cooled suits available if needed. 2. Cold water available. X X C. COMMENTS: (1) The dial thermometers which read the temperature at the 4th and 5th level of 539 are both broken. HEAT STRESS INSPECTION AND AUDIT UNIT/AREA/BLDG ENERGY____________________________ AUDIT BY ______________ Mario Gutierrez_________________ A. LOCATION REQUIREMENTS ,1* Potential heat stress places documented. 2. Maintenance aware if potential exists. DATE 8/29/80 SEE YES NO COMMENT X (1) X (2) / B. PERSONNEL REQUIREMENTS 1. Air cooled suits available if needed. 2. Cold water available. X X C. COMMENTS; (1) There is no documented procedure (*) for doing work in front of steaming boilers or in the hot areas of the powerhouse. (2) Maintenance personnel may be aware of hot areas but because there is no ______ procedure they don't know to what extent._____________________________ (*) There is a written procedure for entering #4 boiler while the gas turbine is running. BRE 0308 HEAT STRESS INSPECTION AND AUDIT UNIT/AREA/BLDG WACKER - REACTION - 733________ AUDIT BY _____________ MARIO GUTIERREZ__________________ A. LOCATION REQUIREMENTS ,1. Potential heat stress places documented. 2. Maintenance aware if potential exists. DATE 8/29/80 YES SEE NO COMMENT Xm X . _I2) B. PERSONNEL REQUIREMENTS 1. Air cooled suits available if needed. 2. Cold water available. X X C. COMMENTS: ______ (1) There is no documented procedure for doing work on top of the furnaces, when one is down and the next one is running._______ (2) Maintenance personnel are aware that it is hot but the heat stress potential has not been determined. T a BRE 0309