Document QXxJ5RzGQJnDN0EDwwz4RjLgk
ft E P A United States
.._.,.~
Environmental Protectior
,,,.
Agency
Region 6 - Enforcement & Compliance Assurance Division
INSPECTION REPORT
Inspection Dates: Media Program: Regulatory Program(s)
7/28/2025 and 7/29/2025 Drinking Water Safe Drinking Water Act (SDWA)
Company Name: Facility Name: Facility Physical Location:
(city, state, zip code) Mailing address:
(city, state, zip code) County/Parish: Facility Phone Number Facility Contact:
Duncan Public Utilities Authority - Public Water System
Duncan Public Utilities Authority
1104 N Waterplant Rd.
Duncan, OK 73533
1104 N Waterplant Rd.
Duncan, OK 73533
Stephens County
580-467-4202 Karl Holtz kholtz@duncanok.gov
I I Water/Wastewater Superintendent
FRS Number: System Classification: PWSID:
110012874693 Community Water System (CWS) OK1010809
Personnel participating in the inspection:
Kevin Sarmiento
Eastern Research Group, Inc. (ERG, EPA
Contractor) / kevin.sarmiento@erg.com
Brynn Goe
ERG / brynn.goe@erg.com
Daniel Kim
EPA Region 6 / kim.daniel@epa.gov
Karl Holtz
Duncan Public Utilities Authority (Duncan
PUA) / kholtz@duncanok.gov
Brian Ritter
Duncan PUA / britter@duncanok.gov
John Byers
Duncan PUA / jbyers@duncanok.gov
Isaac Sparks Kimberly Wirtz
State of Oklahoma Department of Environmental Quality (DEQ) / isaac.sparks@deq.ok.gov DEQ / kimberly.wirtz@deq.ok.gov
Inspector
Inspector Inspector Water/Wastewater Superintendent Water Treatment Supervisor Information Technology (I.T.) Director District Representative
District Representative
EPA Lead Inspector Signature/Date
Lrc '
Kevin Sarmiento, ERG (EPA Contract Inspector)
9/24/2025 Date
Supervisor Signature/Date
RUBEN ALAYONGONZALEZ
Digitally signed l y RUBEN ALAYON-GONZA ,..EZ Date: 2025.09.25 14:05:20 -05'00'
Ruben Alayon-Gonzalez, EPA Region 6, Enforcement and Date Compliance Assurance Division, Water Resources Section
6ENFORM-019-R8.2 (02/12/2020)
1
^Z//EdZKhd/KE
WhZWt^/K< /Z
WhZWK^K&d,/E^Wd/KE
&Z:Z:h^ZWZZW WZZZZ'ZWZZZ Z/Z^ZZ^t^th^Z WhZWhWt^Wt^Wt^/EZK<^ dZZZZ^Z^tZ ZdZKZZK. WZ <,Z Z^ZZZZ: /ZZZZZZZ^ Z
dZZZZ^Z ZZWZZZ ^ZZZWZZZ ZZZZZ Z/ZZ ZWZZZZ Z
ZK^^ZKZZZY YZZdZZZZZZ dZKZdKddDZ ZZZZdd,DZ:ZZZZ Z:YZ^
dZZZ^ZZZZZ KZtttt
dtt/sZZ ZZWZ : : Z
E
Z WZ
Z WZ
sZZZ
D Z >ZZZ
h
ZdZ
dd
ZdZ
dd
ZdZZZ ZZDZZZ
ZZdZ
Z
Z ZZ ZZDZZZ Z
ZdZ ZZDZZZ ZdZ
ZdZ ZZDZZZ dZZ
ZZ ZZ
WhZWt^/K< /Z
dtt/sZZ ZZWZ : : Z
E
Z WZ
Z WZ
sZZZ
D Z >ZZZ
h
ZdZ
ZdZ ZdZ
dZdZ dd,D
dd,D
dd,D
dd,D
dd,D ZdZ
ZZDZZZ ZtdZ Z
dd dd
D>
D>
D>
D>
D> dd
>ZZ
>ZZ
>ZZ
>ZZ
>ZZ
ZZ ZZ >
>
>
>
> ZZ
^z^dD^Z/Wd/KE
d^ZWt^&ZW^ Z^ZKZZZ^ZZZ^ ZZZZZd^ZZ ZZZtdWZ EZ^ZZZD'Zd ZZZZZZZZ
dZZZZZZ ZZZd^ZZZ ZZZdZZ ZZZD'^ZZt Wt^/EZK<ZZ^
Duncan Public Utilities Authority, PWS ID: OK1010809 Inspection Dates: 07/28/2025 and 07/29/2025
^Z///E^Wd/KEd/s/d/^^hDDZz
The EPA inspection team conducted an array of interviews and field activities to discuss and observe the System operations and maintenance (O&M) activities and to assess the condition of the drinking water system assets. The physical inspection occurred over two days. The following subsections describe the inspection activities completed by the EPA inspection team. The System representatives provided documents in response to a document request included in the EPA Region 6 inspection notification email. The information in this report is based on document review, conversations with System representatives, and observations made during this inspection.
KWE/E'KE&ZE
The EPA inspection team arrived at the System, located at 1104 N Waterplant Rd., Duncan, OK 73533, at 0830 CDT on July 28, 2025, for the inspection. The EPA inspection team was accompanied by Isaac Sparks, Kimberly Wirtz, and Thomas Nguyen from DEQ; refer to Appendix B for the opening conference sign-in sheet. Daniel Kim and Kevin Sarmiento presented their credentials to Karl Holtz and informed them that this was an EPA Region 6 inspection to determine compliance with the SDWA and O.A.C. requirements. The EPA inspection team also informed the System representatives that they would be conducting a cybersecurity evaluation alongside the SDWA Section 1433 review of the System's Risk and Resilience Assessment (RRA) and Emergency Response Plan (ERP).
The opening conference included a discussion of system details, surface water sources and treatment, and Supervisory Control and Data Acquisition (SCADA). Additional conversations throughout the inspection process included technical, managerial, and financial capacity of the System, monitoring and reporting requirements, cross-connection control, emergency response plan and management, staffing, plans in place for lead and copper rule (LCR), disinfection byproduct rule (DBPR), revised total coliform rule (RTCR), treatment techniques, and others discussed in more detail in the remainder of Section II.
DE'DEdEKWZd/KE
The System is owned and operated by the City of Duncan. Two of the three source water lakes, Lake Humphreys and Lake Fuqua, are owned and managed by the City of Duncan with the third source, Lake Waurika, owned and managed by the U.S. Army Corp. of Engineers.
Nine licensed operators cover three shifts at the water treatment facility to ensure 24 hours of coverage per day. The facility is classified by DEQ as a Class A facility due to demand and treatment complexity. Routine checks of the distribution system assets, including monitoring chlorine residual and phosphate levels, are completed by distribution staff Monday through Thursday and by treatment operators Friday through Sunday. Chlorine residuals are monitored and recorded at water storage facilities twice per day as required. These residuals are monitored manually as there is no chlorine residual monitoring instrumentation at any of the water storage tanks. The breakdown of operator certification levels are as follows:
x Two operators hold a Class A Water Operator License. x Three operators hold a Class B Water Operator License. x One operator holds a Class C Water Operator License. x Three operators hold a Class D Water Operator License. x One operator in training is testing for the Class D Water Operator License.
4
WhZWt^/K< /Z
ZZ^ZKZZZ dZKZdKddZZZZZZ ZZ:ZZ^Z YdZK^ZZZ: ZdKdd:ZdKdd ZZZZZZ ZZYZdK ddZZZZ/ZZZZ^ ZZdKZ
d^ZZZZZ Z^ZZ^Z ZZKYZZ ZZZdKZ ,ZWZZZZ^ /ZW^Z /ZWdZK^ZZdKdd :
ZWZZZ ZZZZZZ^ ZZZZZ&ZWZ ZZZZ ZZZZZZZ ZZZZ^ ZZ
d^ZZZZZZZZZZZ ZZZZZZZZZ^ ZZZW/Z ZZZZZZZZZ^ ZZZZZZ ZE&WZZ& ^ZZ&Z ZZZZ ZZZZ tW/WWZ/WWZ,ZZ ZWZZZZZ^ ZZ
d^ZZZ^ &WZW^d^Z&Z ZZ^&Z ZZZZZZ^
WhZWt^/K< /Z
d^Z^ ZZZZZ
^ZZZ dZZZZ ZZ^
^YZ^ZtWZ^ ZZZZ
d^ZZZZZ ZZZZZ^ ZZZZsZZZKZ ZZZZZZZZZZ ZZZZZZZdZK ^ZZZZZZZW :d^WZZZZZ ZZZ,ZZWZ ^ZZZZ ZZZZZ^
KhDEdZs/t
dWZZZ^ZZZZZ Z&ZZZZZZWZZ Z^WZZZZ ZZZZZZZZdZ ZZZZdZ^^WZZZWZ>ZZ >ZZZ>ZZ/Z>Z/WZZZW&^ hZDZZZhDZZ ZZZZZZZd^ ZZZZZZ
d^ZZZZZWZ^ ZZZZZ ZZZ,Z ^&WZW WZZ^ WZWZ
d^>Z^WZZYZ ^ZZ d^>^>/Z>^>/^ ZZZZZ^Z^ ZZZZ>^>/Z ZZZZ ZZZZ ZZ
WhZWt^/K< /Z
dWZ^^ZZZ ZZWdWZZ^
&/>/dzt><d,ZKh',
dWZZZZ tdW>,Z ZZZ dZZZZ
dZZZZZZZZWZ^ ZZZZZZZ ^Z///ZZ
tdW
dtdWZ>t>,>&> tZh^ZZZZZ ZZZZtDZ>, >&ZZWZ >,ZZZZZZ>t ZZZdtdWZZZZZZZ ZZEZW^ZW ZZZ,ZZd^Z ZZZZdZZZZ& ZEZ^ZWZZZZZD'd ^ZZZZW,Z^ ZZdZD'YZZZZZ d
d^ZZZZZZZZZZZ,Z ZZZZD'& ZZZ
dWZZZZtdWEZ^Z dEZZZZWZZ ZZZZZZ
tdW^d
dZZZ Z
dWZZZZZZ
x dZZZZZ WZZ
x ZZZZ ZWZZ
x dZZZZZ x WZWZZ
WhZWt^/K< /Z
x d^ZZZZZZ ZZ
tdW^Z&D
,ZZZ^ZW Z
dWZZZZZZ
x dZZZZZZZZ Z,ZZZWZZ
x ZZZZZ ZZ,ZZZWZZ
x d,ZWZZ
tdWWZZ,Z
^^ZZZ WZZWZZZZZdKZZ ZZZZZ ZZWZZ
tdW^ZW
d^ZWZZZZZ ZZZZZZZ Z^ZZ ZZZ
tdW^ZW&
d^ZW^ZZ ZZZZZ ZEdhZdZZZZ ^ZEdh/ EdhZZZZZZZ
dZZZZZZZZ ZZWZZdWZZZZZ ZZZWZZ^ ZZZZZZ ZZZ
dWZZZZ^ ZZZZ Z^ZZ ZZ
WhZWt^/K< /Z
dWZZZZZZWZZ WZZ
tdWZWZ
d^ZZZZZZZ ZZZKZ ZZZZZZZ^ ZZZZZ ZZZZZZZZZ dWZ^Z ZZZZZZWZZ
tdW^ZW&W'D'
d^ZW&W'ZZZZ^ZW& ZD'd^ZWD'^Z ZZD'
dWZZZZZZ
x ^ZZZZD' WZZ
x KZZZZZZD' WZZWZZ
x ZZZZZZ ZZZ^ZZWZZ WZZ
x ZZZ^Z&Z WZZWZZ
tdWZZW&W
dZZZZZZZZZZ D'dWZZZ ZZZZWZZ
dZZZZZ ZZdWZZZZZZ ZZWZZ
tdWZ&ZZZ
dWZZZ&ZZZZ ZZZZZ^ ZZZZKZ ZZZZZ^ZZZZ ZZZZZZdWZ Z'^d,ZZZZZ
WhZWt^/K< /Z
WZZ^ZZZ ZZ
tdWZ^ZZZZ
dZ^ZZZZZZZ&ZZZZ ZZZ
dWZZZZZZ
x ZZZZZZZZ ZWZZ^ZZZZ WZZ
x dZZZZZZZWZZZZ ZZE^&WZZZZ ZZZZWZZWZZ ZWZZ^ ZZZZZZ ZZZZZ
x ^ZZZ ZZZZZZZWZZ
x KZZZZWZZWZZ ^
x &ZZZZZZWZZ x EZZZZZZZ
WZZ x dZZZZZZZZWZZ
tdWD'Z
dD'ZZEZ^Z WdZZZ Z
dWZZZZZZ
x ZZWZZ WZZ^ Z
x ZZZZ WZZ
x ZZZZZZZZZZ ZZWZZWZZ
x WZZZZZ ZZZZKZ ZZZZWZZWZZ
WhZWt^/K< /Z
tdWWZZ^Z&DZZ/Z
d^,ZZZZZZ ZZdZZ ZZZ
dWZZZZZZ
x &ZZZZ x dZZZZZZZZZZZZZ
WZZ^Z ZdZZZZZZ x ZZZZZZZZ ZZZZZZWZZWZZ WZZWZZ^ZZZ ZZZZZ ZZZ x EZZZZZ ZZZZZZZZWZZ
tdW,^Z
d^ZZZZZZZZ, ZZZ^ZZ Z,ZWZZZ Z,ZZZ ^ZZZ ZZWZZ
dWZZZZZZZZ ZZZZ ZZZWZZ
dWZZZZZZZ WZZ
tdWZ'^Z&ZZZ
d^ZZZZZ ZZZZ^ZZ ZZZZ
tZZZ^ ZZZ dWZZZZZZZZ ZZZZZZZZWZZ
WhZWt^/K< /Z
dZZZZZZZZZZ ZZdWZZZZZZ ZZZWZZ
tdWWZ^Z&ZZZ
Z/ZZh&Z,sZZZZZZ ZZZdZZZEZZZ^ZWZ ZZ/ZdWZZZZ ZZ/ZZZZWZZ
d^ZZZdW ZZZZZ^ Z
dWZZZZZZZ WZZ
tdW^
^ZZZ^ Zd^Z ^ZZZZZZZZ ZZZZZZZZEdhZ
dWZZZZZZZ ZZ ZZZWd^ ZZZZZWdd^ ZZZ^
tdW>ZZ
ZZZZZ ^ZZZZZZ ZZZdWZZZ,ZZ ZZZZ
>,/
d>,ZZ ZZZZ>,dWZZZZZ ZZ^ ZZZZZZZZZdZZ ZZZZZZZZh^'ZZ ^
WhZWt^/K< /Z
,WZ^ZW^Z&ZZZ
d,WZZZZZ ZZtdWEZZZZW Z^ZZ>, >&ZZZZ>td WZZZZWWZZ
d^ZZZZZZZ> ,>&ZZZ>&ZZ Z>,WZZ>,WZ ZdWZZZZZ ZZZZZZWZZ^ ZZZZ ZdWZZZ ZZZZWZZ
ZZdZ
ZWZ^ZD'ZZ D'ZZdZdWZZZ ZZZZZZZ ZZWZZWZZ
D'ZZdZWZZZZZZ
x ZZZ ,Z^ZZZZZ ZZWZZ
x dZZZZWZZ x ZZZZZZ
ZZZWZZ x Z^ZZ
Z x >ZZZZ
ZZZZZWZZ
WZ
dWZZZZZZZZ Z
dWZZZZZZ
x ZZZZZZ WZZ
x ZZZZZZZZ WZZZZZZ ZZZZZZZ
d
WhZWt^/K< /Z
dZD'^Zd D'EZdD'EZd ZZZZZ
dWZZZZZZ
x sZZZZZZZZ WZZWZZWZZ
x ZZZ ZZZWZZWZZWZZ
x ZZZZZZ^ZdWZZ WZZ
x WZEdWZZEtd WZZ
EZ/dZt
dWZ^ZZEZ/dZ tZZZZZ ZZWZZ^ ZZZZdZ ZZZZZZZZ
EZ/dZ
dEZ/dZD'
dWZZZZZZ
x sZZZWZZ x WZZZZZZWZZ x dZZZZZZZ
WZZ
EZ^ZdZ
dEZ^ZdZD'dWZZ ZZZZWZZ
EZ,WZ
dEZ,WZZZZsZZZ KZZdWZ ZZZZZZZ dZZZ ,ZWZZZZZ WZZ
>K^/E'KE&ZE
WhZWt^/K< /Z
dWZ ZZ^Z Z : tdW ZZZ d W Z ZZ ZZZ ZdWZ Z ^ ZZ ZZZ
W ZZ Z Z Z Z WZZZZ ZZdZZZ ZZ ZZ ZZKZ ^Z /// KZZ ^
d Z Z Z
Z ZZ Z
^Z ///ZK& KEZE
^t ^Z SDWA Section 1433(a)(1)(A) requires a CWS serving more than 3,300 persons to conduct a Risk and Resilience Assessment ("RRA") of its system, including an assessment of:
i. the risk to the system from malevolent acts and natural hazards; ii. the resilience of the pipes and constructed conveyances, physical barriers, source water,
water collection and intake, pretreatment, treatment, storage and distribution facilities, electronic, computer, or other automated systems (including the security of such systems) which are utilized by the system; iii. the monitoring practices of the system; iv. the financial infrastructure of the system; v. the use, storage, or handling of various chemicals by the system; and vi. The operation and maintenance of the system.
Section 1433(a)(3)(A) of the SDWA required a CWS serving greater than 3,300 but less than 50,000 persons to submit its certification to the EPA Administrator that it has conducted its RRA on or before June 30, 2021, and at least once every five years after the initial applicable deadline.
Area of Concern 1.
K:WZZZWh Z ^t^Zh^WZ ZZZZ^t^Z ZZZ
dZZZ dZZZZZZZZZZ
ZZ dZZZZ^t^ZdZZ
o ^ZZZZ ZZZ ZZZZZZZ Z o ^ZZZZ o ^ZZ
WhZWt^/K< /Z
o ^ZZZZZ
o ^ZZZZ dZZZZZ^ZZ
ZZ
^t^Z ^ZZ^tt^ZZ ZZZZWZZ ZZZZZZZZZZdZW
ZZZZ Z
ZZZ ZZZ Zt^Z
ZZZZ ZZZZZ ZZZZZ ZZZZZZZZZZZ ZZ
4. ^ ZZZZZ ZZ.
Area of Concern 2.
ZWZZ^ZW Z^t^ZZZZ
dWZWZ ZZ ,Z ZWEZ ZZ
dZWZZZZZZZZ ZZ
dZWZ^Z dZWZZZZ
o ^t^ZZZZZ Z
o ^t^ZZ ZZZZZ Zt^Z
o ^t^ZZZZZ ZZZZ ZZZZ ZZZZZZZZ ZZZZZZZ
o ^t^ZZZZ ZZZZ
WhZWt^/K< /Z
K ZZZZ ZttZZZZWZ ZZZZZ ZZ
Area of Concern 3.
^ZZ Z Z ^ ZZ , d,ZZ,d,Z ZZ Z Z
K >ZZZZ ZZZZZ>Z ZZZZZZZZ ZZZZZZZ ZZZZZZZZZ
Area of Concern 4.
dWZZZZ ZZZ WZ WZZ
K ^ZZZZZZ> ZZZZZZ
K WZZZZ ZZZZZ
Area of Concern 5. Area of Concern 6. Area of Concern 7.
dWZZZZZZ ZZZZZZZ WZZWZZWZZZZ ZZZZ^ ZZWZZ dWZZ ZZZ ZZZ>,Z ZZ ZZZZ WZZ WZZ dWZZZZZ Z h&Z,sZ /Z ZZZ WZZ
K ' Z Z Z Z Z Z Z
Area of Concern 8.
dWZZ Z Z ZZ Z Z / WZZ WZZ Z Z Z Z /// Z WZZ WZZ Z Z Z Z Z Z Zs/ Z ZZ ZZ WZZ WZZ WZZ
WhZWt^/K< /Z
Area of Concern 9. Area of Concern 10.
dWZZ Z Z Z ZZZ Z // Z Z ZZ ZZZZ Z/// Z Z ZZZ Z Z / Z Z ZZ Z ZZWZZ WZZ WZZ WZZ dWZZ Z Z Z Z Z Z// Z Z Z , Z Z /// Z Z Z ZZ ZZ
K WZZZ
Area of Concern 11.
dWZZZZ, WZZ tdW^ ZZZ WZZ
K/ZZZZZZZ ZZZ
K<"Specifications must provide for an Operation and Maintenance (O & M) Manual for the operation and maintenance of the public water supply system. The O & M Manual shall include at a minimum: Safety
Area of Concern 12.
dZZZZ^KWZ exchange of one-ton chlorine gas cylinders to ensure operator safety.
K "Make the roof and side walls of all structures watertight with no openings except properly constructed vents, manholes, overflows, risers, drains, pump mountings, control ports, and piping for inflow and outflow." K "In addition to the requirements of OAC 252:626-17-1 (a) - (c) and (f) (r), the following requirements shall apply to clearwells: ... (3) Do not locate the clear well under any part of a building where contamination is probable. (4) Do not allow a common wall with any basin holding untreated water."
Area of Concern 13.
Area of Concern 14. Area of Concern 15.
The EPA ZZZZ on the roof of the 0.5 MG Clearwell, through which the clearwell sample pump pulls from the underground clearwell (Photograph 15 and Photograph 16). The roof of the clearwell is loca ^ZWWater and other ZZSouth Plant through the unprotected opening. dW Z team observed stored paints and industrial enamel without spill containment in the South Plant Filter Gallery (Photograph 12). dW Z Z an unprotected opening around a control port on the roof of the 3.5 MG Clearwell (Photograph 35).
WhZWt^/K< /Z
Area of Concern 16. Area of Concern 17.
d W Z Z Z Z around the roof access hatch of the 3.5 MG Clearwell (Photograph 34). d W Z Z ooled Z Z on the 3.5 MG Clearwell, around the high service pumps, located directly on top of the K Z Z Z Z clearwell below (Photograph 37 and Photograph 38).
K "Vent all finished water storage structures. Overflows are not considered vents. Open construction between the side wall and roof is not allowed. Design of vents must: be covered with a 24 mesh corrosion resistant screen installed at a location least susceptible to vandalism."
Area of Concern 18.
dWZobserved torn and corroded vent screens on the South 0.5 MG Clearwell. Two of the three screens were tornZZZ ZZ (Photograph 13 and Photograph 14).
Kstates that finished water storage tank accesses must "be fitted with a solid watertight cover."
Area of Concern 19.
dWZZZZZZ ZZ D'Photograph 19, Photograph 32, and Photograph 33 ZZZ
K "Equip the ends of the pipes with flex gates." ZZ^ Z t tZ Z "The overflow shall open downward and be screened with twenty-four mesh non-corrodible screen. The screen shall be installed within the overflow pipe at a location least susceptible to damage by vandalism. A mesh-fitted mechanical flap valve is acceptable provided the flapper is supplied with non-corroding and non-seizing hinges. The flap valve shall be spring loaded or counterweighted, so it closes and forms a tight seal after the overflow event."
ZZ^ Z t tZ Z "When a solid flapper is used, a screen shall be provided inside the overflow. If a duckbill valve is used, a screen is not required. Provisions must be included to prevent the flapper or duckbill from freezing shut."
Area of Concern 20.
dWZZ Z metal ZZZZ ZdZ ZZ ZZZWTP backwash supply tank (Photograph 1), El Rancho Tower (Photograph 58), 10th and Elk South Tank (Photograph 65), 10th and Elk N.W Tank (Photograph 66), 10th and Elk N.E Tank (Photograph 67), and Industrial #2 Tower (Photograph 75)EZZ ZZZ
K "Leak detection systems shall be fitted in all areas where the ammonia is piped."
&Zd states that the limit for ammonia in air is 50 parts per million (ppm).
Duncan Public Utilities Authority, PWS ID: OK1010809 Inspection Dates: 07/28/2025 and 07/29/2025
Area of Concern 21. Area of Concern 22.
dWZZ ZZZ
the anhydrous ammonia feed room (Photograph 21). A pungent ammonia odor
was apparent and made access into the feed room unsuitable for longer than a few secondsZit was not capable of reducing the strong ammonia gas odor. ^ ZZZZZZ Z dWZZZZZ anhydrous ammonia storage room (Photograph 31).
K"Public water supply systems shall provide the following security measures to protect water treatment plants, finished water storage facilities(which include laboratories, chemical buildings, administration buildings and storage buildings): "No Trespassing" signs shall be installed at least at fifty foot (50') intervals along the entire length of the fence and at the location of all intake structures."
Area of Concern 23. Area of Concern 24.
The EPA iZteam did not observe any "No Trespassing" signs at the EZ,W^Z (Photograph 77). dWZdid not observe any "No Trespassing" signs at or around the Lake Humphreys intake, and System stated that
signage was not in place at the Lake Fuqua intake.
KWZZZZ ZZ ZZ ZZd ZZ
Area of Concern 25.
dWZZZ ZZZ Z ZZdZ WZZ/dZ WZZ
K t Wt^ Z ZZ Z
Area of Concern 26.
t ^^WZZZ Z Z ZZZZ Z ^ZZZZ Z Z Z Z Z Z Z ZZ
tt'dZ /Zd ZZZZZZdZ ZZZZ ZZ
20
Duncan Public Utilities Authority, PWS ID: OK1010809 Inspection Dates: 07/28/2025 and 07/29/2025
Area of Concern 27.
d^ZZ ZZ ZZZ Z dWZZ ZZ ZZZdZZZ^Z ZZWZZ
KZZZ ZZZZZZZ ZZZWZZ ZZZZZZ
Area of Concern 28.
dWZZZZdZ tdW^d^ ZZ ZZdZ tdW^dZZ
K Z Z ZZ
K Z Z Z ZZ ZZ ZZ
Area of Concern 29. Area of Concern 30.
dWZZ ZZZZ ^ Z dWZZZZZZ Z Z ZZdZWZZ dZZZ ZZ dZZZZdZ
ZZWZZWZZZZZZttD&Z ZdZZKZZZ ZZZZZZZZ
Area of Concern 31.
dWZZZZ ^ZWWZZtdWZZZZ WZZtdW,ZWZZ
d^Z Z Z EZ^ZdZ WZZ Z ^ZW
KZZZZZZ ZZZZZZZ ZZZZZZ ZZZZ
Area of Concern 32.
dWZ Z ZZZ Z Z Z Z ZZ ZZtdW WZZ
WhZWt^/K< /Z
W,ZZZ^^Zt^^Z Z ZZZZZZ ZZZZZ ZZZZZZZ ZZZZZdZZZZZZZZ ZZ
Area of Concern 33.
Area of Concern 34.
Area of Concern 35. Area of Concern 36.
dW/ZdZ ZZZ ZtdW Z Z WZZ ZZ dZWZZ dW Z Z Z ZZ Z ZZ ZZ dZ WZZ Et ^Z d WZZ E ^Z d WZZ ^Z ^Z d dWZZ ZZZ Z Z Z /dZ WZZ dWZZ Z ZZ Z tdWd WZZ ^Z ^Z dWZZ WZZ E d WZZ Et d WZZ
ttD^t^ZdZWZZ ZZ ZZZZZZZZ ZZZZZZZZ ZZZZZ ZZZZZ ZZZZZZZZZ
Area of Concern 37.
^Z ZZZZZ
^ZZ^ZttZZ dZ ZZ ZZZ
ZZZZZZ
Area of Concern 38.
dWZZZZZ, ZZZtdWWZZ ZZZZ,ZZ
K ^ ZWt^ K^,
&Z tZ Z Z Z Z ZZZ Z Z d ZZ Z Z Z Z Z Z Z WZ Z
WhZWt^/K< /Z
Z ZZZ Z Z ZZ Z ZZ ZZZ Z Z ZZ Z Z Z ZZ Z Z
Area of Concern 39. Area of Concern 40. Area of Concern 41. Area of Concern 42.
dWZZZZZ Z ZZZZZZZZZ ZZWZZ dWZ ZZ ZtdWZZZZWZZ ^ZZZ ZZZZ ZZZWZZ KZZZZZZZ Z ZWZZ WZZ ^
tt 'dZd ZZZZZZZZ DZZZZ
Area of Concern 43.
d^Z/ZWZZ ZZZZZ d /ZWZZZ Z^ZZZZ dKdd: ZK
&ZDZD>ZZZZZZ ZZZZ ZZZZZZZZ ZZZZZZZZZ
tt 'sZdZ dZZZttDDZZ ZZ
ZZZZZZ ZZ
ZZZZZ DZZZZZZZ
ZZZ
WZZZZZ dZ ZZ ZZ dZZZ Z ZZZZZ ZZZ
Area of Concern 44.
WhZWt^/K< /Z
d^sWZ Z ZZZ^Z ^ZZZ
tt 'D d ZZdZ ZZZZZZ dZZZZZ ZZ
Area of Concern 45. d^ZZ
tt 'dZZ ZZZ Z
Area of Concern 46.
dWZZZZ ,ZWZZ
K Z/ZZZZZZ ZZZ
tttdW&ZZ ZZZZZZZ
Area of Concern 47.
dWZZ,ZZZ ZZZZ Z ZZ WZZ
K'ZZ ZZZZZZZ
Area of Concern 48.
dWZZZZZ ZZZ,ZWZZ
KZZZZ
Area of Concern 49.
dWZZ,ZZZZ ZZZWZZd, &ZZ^ZZZ ZZ
K Z Z Z KZ D K Z Z Z Z Y Z Z Z Z Z ZZ Z
WhZWt^/K< /Z
Area of Concern SO.
dWZZ ZZ ZWZZ^Z&Z WZZ WZZ
K ^ZZWZZZ ZZZ ZZZZ>Z ZZZZZZZ ZZZ
Area of Concern 51.
dWZZZ ZZZZZZ ZZZWZZ
tt ',ZZZ ZZZKZZ ZZ ZZZ
Area of Concern 52. Area of Concern 53.
dWZZZZZZ ZZWZZ dWZZZZZ, ZZtdW>
^Zs/>/^dK&WWE/^
WZZ>Z /Z^/^ ZK
W,KdK'ZW,>K'
WhZWt^/K< /Z
hZZZ<^Z'ZZ Z'ZdZZ^dWZZ ZZZZZZZZZZZ ZZZZZ
WZZW:W'tdWd ZDZZZZZZZ
Z
WZZW:W'tdW^d Z'ZtdWZ
WhZWt^/K< /Z
T
07/29/2025 08:53 WZZW:W'tdW^d
ZZtdW
WZZW:W'tdW&D Z,WZZZZEZZZZ
ZZZZZ
WhZWt^/K< /Z
WZZW:W'tdW&D ZZZZZtdWZ ,WZZZZZ
WZZ:W'tdWWd ZWZZZZ
WhZWt^/K< /Z
WZZW:W'^ZW& Z&ZEZZZ
WZZW:W'^ZW& Z,ZZZtd&
Duncan Public Utilities Authority, PWS ID: OK1010809 Inspection Dates: 07/28/2025 and 07/29/2025
WZZW:W'^ZW& ZGarden hose connected to hose bib without vacuum breaker at the South Plant Filters.
WZZW:W'tdW^ZW& ZHose bib in the Water Treatment Facility without a hose bib vacuum breaker.
A-5
Duncan Public Utilities Authority, PWS ID: OK1010809 Inspection Dates: 07/28/2025 and 07/29/2025
WZZW:W'KZ>Z ZDaily operation log Zackwash recycle information called out
with red a circle.
WZZ:W'^ZW&' ZPaint stored in the South train filter pipe gallery next to the 0.5 MG Clearwell access hatch.
A-6
Duncan Public Utilities Authority, PWS ID: OK1010809 Inspection Dates: 07/28/2025 and 07/29/2025
WZZ:W'D' ZTorn vent screen on the 0.5 MG Clearwell.
WZZW:W'D' ZCorroded and torn vent screen on the 0.5 MG Clearwell.
A-7
WhZWt^/K< /Z
WZZW:W'^ZW&' ZhZZZZZD'Z
WZZW:W'^ZW&' ZhZZZZZD'Z
WhZWt^/K< /Z
WZZW:W'^ZW& ZZZZZZ
WZZW:W'^ZW& ZZZZZZ
WhZWt^/K< /Z
WZZ:W'WZZW ZWZZZZZ
Z
WZZW:W'&W ZZZZZZZ
WhZWt^/K< /Z
WZZ:W'Z&ZZZ ZZZZZZ
WZZW:W'Z^ZZZZ Z,ZZZZZZZZZ
ZZtd&
WhZWt^/K< /Z
WZZ:W'Z^ZZZZ Z,ZZZZZZZZt d&ZZZZ
::';' "'""",.,..,.~d
~....:~~-E,:. ~::-~=5-
-.;:~.;:::.:-::__ ~,::-_-:~..~. '-:.:.'::
:;-.,---..i- ...... ---~~::1 OJO:i.a,.,..,_., '_ lh
'"~:.:.:::.:_-
. '
,.._
~~CflOH Nel:WI !500.00 LB 228,80 KG
11~"';;;"- ......,""" .......... _ _ _
.... ~-==--
~:::_
WZZW:W'Z^ZZZZ
Z,ZZtd&
WhZWt^/K< /Z
WZZ:W'Z^ZZZZ ZZZZZZZZt
d&
WZZW:W'Z^ZZZZ ZZZZZZZZt
d&
WhZWt^/K< /Z
WZZW:W'Z^ZZZZ Z,ZZZZZZZZ
WZZW:W'Z^ZZZZ ZZZZZZZZt
d&
WhZWt^/K< /Z
WZZW:W'Z^ZZZZ ZZZZZZZZ
td&
10:46 WZZW:W'Z^ZZZZ Z&ZZZZZZZZ
WhZWt^/K< /Z
WZZW:W'Z^ZZZZ ZZZZZZZZZZZZ
t
07/29/2025 10:52
WZZW:W'D' ZZD'tdWZ
WhZWt^/K< /Z
WZZW:W'D' ZZD'Z
WZZW:W'D' ZZZZD'
WhZWt^/K< /Z
WZZW:W'D' ZZZZZZD'ZZZ
Z
WZZW:W'D' ZKZZZZZZD'
WhZWt^/K< /Z
WZZ:W'D' Z^ZZZ
D'
WZZW:W'D' ZKZZZZZZZD'
WhZWt^/K< /Z
WZZW:W'WZZ^ZZZZ ZZZZZZZZZZZZZtdW
WZZ^ZZZZ
WZZ:W'WZZ^ZZZZ Z^ZZZZZZZZZ
ZZWZZ^ZZZZ
WhZWt^/K< /Z
JOE ":,'::.~tllt,IDI-"""-"'"'""'-
~- 1111 1m111t2~01e_-
--021t~~~-----
\.DTl!'O NO
- - -------
- HYl)R0fLIJ0$iUCICA~0!3!\
_
_ Ji'!_O! ~Q..L!!)~IJ_~-:~~I~~ -----.;i,"'
$UIIII.NII
WZZ:W'WZZ^ZZZZ ZZZZZZZZ
WZZ:W'WZZ^ZZZZ ZZZZZZWZZ^ZZZZ
WhZWt^/K< /Z
WZZ:W', ZZ,ZZ
WZZW:W', ZZ,ZZZZ
Z
WhZWt^/K< /Z
WZZW:W'tdW>ZZ Z,ZZZtWdZZ ZZZZEZZZ
Z,ZZZZZ
WZZW:W', Z'ZZZZZ,
WhZWt^/K< /Z
WZZW:W'tdWZZZZZ ZZZZZZZZZZZZZ
ZZZ
WZZW:W'tdWZZZZZ ZZZZZtdWZZ
ZZWZZZ
WhZWt^/K< /Z
WZZW:W'WZ&^ZZZZ Z^ZZZZ/ZZZEZ
ZZZZZZ
WZZW:W'WZ&^ZZZZ Z'ZZZZZZZ
ZZ
WhZWt^/K< /Z
WZZW:W',ZtWZ Z>ZZ,
Z
WZZW:W'W^Z&ZZZ
Z^ZZZZZ
WhZWt^/K< /Z
WZZW:W'W^Z&ZZZ
Z^ZZZ
WZZW:W'ZZdZ Z,ZZdZZZZZZ
Z
WhZWt^/K< /Z
WZZW:W'ZZdZ Z'ZZZZZZZdZ
/28/'J.025 u.:25
WZZW:W'ZZdZ Z/ZZZZdZ
WhZWt^/K< /Z
WZZW:W'ZZdZ ZsZZZZZdZZ
WZZW:W'ZZdZ ZZZZZdZZZZZ
Z
WhZWt^/K< /Z
WZZW:W'ZZdZ Z'ZZdZZEZ
WZZW:W'WZ ZZZWZ
WhZWt^/K< /Z
WZZW:W'WZ Z,WZZZZ
WZZW:W'^Zd ZsZZZ^Zd
WhZWt^/K< /Z
07/28/2025 14:52
WZZW:W'Etd Z^ZZEtdZ
WZZW:W'Etd ZsZZZZZZZZEtd
WhZWt^/K< /Z
0112a1202s 1s :02 WZZW:W'^Zd ZDZZZZZ^ZdZZ
Z
WZZW:W'Etd ZZZZZEtdZZ
Z
WhZWt^/K< /Z
..
....
.
28/01/2025 WZZ:W'Ed ZDZZZZZEdZZ
Z
WZZW:W'^Zd ZZZZZZZ^Zd
WhZWt^/K< /Z
WZZW:W'^Zd ZZZZZZZZ^Zd
WZZ:W'Ed ZZZZZZZEd
WhZWt^/K< /Z
WZZW:W'Ed
ZWZEd
WZZW:W'EZ/dZt
Z^ZZEZ/dZt
WhZWt^/K< /Z
WZZW:W'EZ/dZ ZsZZZZEZ/dZ
WZZW:W'/dZ ZZZZZZZZ/dZ
WhZWt^/K< /Z
07/28/2025
WZZW:W'EZ/dZ ZDZZZZZ/dZZZ
Z
WZZ:W'Et^ZdZ ZdZEt^ZdZZ
WhZWt^/K< /Z
WZZ:W'EZ,WZ Z^EZ,WZZ
^/'E/E^,d
WhZWt^/K< /Z
PWSS Inspection Sign-In Sheet
System Name: Dunca n Public Ut ilities Authority
Name
~
Affiliation, Title
Kevin Sarmiento
ERG, Inspector
PWSID: OK1010809
Date: Ju ly 28, 2025 Meeting: Opening Conference
I
Email Address
Kevin .Sarmiento@erg.com
I Phone Number
703-633 -1642
Brynn Goe
ERG, Inspector
Brynn.Goe@erg.com
303-519-2332
< 'J{c,,,t, /~
l-JA1eA.
.,I
iccet @ot,A.1c..c,c.J o, J
J-80 - i (C:, 7-4:. SFo '))5-9t9o
-,:feO- ~ -<Vo'{/
.,,, I VC"f\ ~P\, 1-:-1~ I '-' \ 0: i .,..._,zt'c.-+:9=
I ~/,I"" , d CLll1 41 <6? ,e l7GL~ -0\/
I"). i4 - 6b, ~(] !
!,.,,o., 7o2 8 1a1
5 72-10/p -9'11, l/
~
WhZWt^/K< /Z
PWSS Inspection Sign-In Sheet
System Name: Duncan Public Utilities Authority PWSID: OK1010809
~
Date: July 29, 2025 M eet ing : Closing Conference
Name
Kevin Sarmiento Brynn Goe
Thun-ll,S IJ,1, (</"A\
Affiliation, Title
ERG, Inspector
.
ERG, Inspector
u~E:c:, D:,h ( l .'-,,'/>", ,I/ C
Email Address
Kevin .Sarmiento@erg.com -
Brynn.Goe@erg.com
l~lf>f'O'. ...,....ffLAt:f/1- P, ' 0/1',, " ':r ~, Y
~ hone Numb~
703-633-1642
303-519-2332 1
- L.,.~.,, -;f~ ~":. .,/,/;'
(!Jrqp.JJ (<-JJ{<?rt.
flt>-t:M LJJ\~'1. SuA?F-\lil:Jll bpi,ccerP r:Jc-'~voK-9ov
k M,:., Sr1,Jl11:::,
001:i), l),~.,t.c.T /i:, EP.t.E",E.\lT -"T\v,
bAAC.SPAJh 8, l>Ec).01(.. f;,r{JI/
~~,ie,\ k,,,,,. 6Pt\ tb ,Z-11' '7t'<:fl:>v- k,"". du-.r.ie..l r'l9 el?O- Clo\/ Gt>-~ }<,J ~1.Llb W/4LuL5tt/ni>1 L .L1, f<~J~ l1utA/a~~ i/
$go ,}.:iS-9/1()
I
u.o~-,;;2- s,03
214 - 665" - 66'}.t-'-
~'i'o-tft-1'-L/J. "11
WZ/>KE^EdKZZ
WhZWt^/K< /Z
OF OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY
WATER QUALITY DI VISION IN THE MA'ITER OF: Duncan Public Utilities Authority,
Respondent,
PWSID No. OK I010809 Problem: TOC TT, Construction, and
Operational Violations
CONSENT ORDER The pai1ies to this case, the State of Oklahoma, ex rel. Department of Environmental Quality ("DEQ") and Duncan Public Utilities Aull1ority ("Respondent") agree lo this Consent Order to resolve certain environmental compliance issues.
This Consent Order supersedes and closes Notices of Violation ("NOV") No. P-101080923-2 dated June 27, 2023; No. P-1010809-24- 1dated May 3, 2024; and No. P-1010809-24-2 dated July 25, 2024.
FINDINGS Of FACT
I. Responde11t owns and operates a public water supply ("PWS") system in Stephens County,
Oklahoma, where the source of water is surface water, and is defined as a community system in Tille 40 of the Code of Federal Regulations ("C.F.R.") 141.2, Oklahoma /\dminislrative Code
("OAC") 252:626-1-2, and OAC 252:631-1-2.
2. In order to demonstrate compliance with Total Organic Carbon ("TOC") treatment
technique ("IT') requirements, the average of twelve ( 12) consecutive months ofTOC removal ratios must be at least I .00 or greater. Samples submiued by Respondent for analysis indicate the
Page J of 13
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OKI0I0809 Consent Order, Case No. 24-322
following instances of 12-month, TOC removal ratio averages being below the minimum required 12-month, TOC removal ratio average of 1.00:
Monitoring Period
ApriI I, 2023 to March 31 , 2024
Monltorin g Location Duncan WTP
12-Month TOC Removal Ratio Averaee
0.99
July I, 2023 to June 3I, 2024
DuncanWTP
0.98
3. On June 8 and 9, 2023, Lisa Cox, P.E., District Engineer for DEQ, and Elliot Grimes, District Representative for DEQ, perfonned a sanitary survey inspection of Respondent's PWS system.
4. On June 27, 2023, DEQ issued NOV No. P-1010809-23-2 to Respondent for the following
violations identified during the inspection on June 8 and 9, 2023:
4.1.
OAC 252:626-17-l(k) and OAC 252:631-3-l(a)- The 3.5 MG Clearwell
had a slow leak near the bottom ofthe south side and was not watertight,
4.2.
OAC 252:621-5-1(1) - The lagoons were not maintained as there was
excessive vegetation in the lagoons.
4.3.
OAC 252:621-5-l(I0)(C) - The lagoon liner was not adequate to prevent
seepage from lagoons number 53 and 56.
4.4.
OAC 252:626-5-4 - The 27th Street Tower was not surrounded by a six (6)
foot tall chain link fence equipped with three-strand barbed wire and "No
Trespassing" signs.
4.5.
OAC 252:626-11-2 - There was not a conveniently located eye-washing
device and deluge shower for the chemical handling and storage area for
sodium pennanganate at the Lake Humphreys intake.
4.6.
OAC 2S2:626-11-3(g)(4)(B) - Spill containment was not provided for
storage of the liquid polymer, ACH, sodium pennanganate, caustic, or
polyphosphate.
4.7.
OAC 252:626-ll-4(a)(l)(C) - The gas chlorination room door was not
equipped with panic hardware (i.e., a crash bar or push bar opening the door
to the outside).
4.8.
OAC 252:626-15-S(d)(l)(E)- Toe N Hwy 81 pump station did not have a
discharge measuring device.
Page 2 of 13
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OKI0!0809 Consent Order, Case No. 24-322
4.9. 4.10.
4.11. 4.12.
OAC 252:626-17-l(h) - The NE Elk Tower, NW Elk Tower, and South Elk
Tower overflows did not discharge over a drainage structure or splash plate.
OAC 252:631-3-l(a)- Due to a lack ofdocumentation such as maintenance records or inspection reports, the condition of the hatch, vent, roof, and
interior could not be verified for the following finished water storage facilities: 3.5 MG Clearwell, 0.5 MG Clearwell, 27th Street Tower, Backwash Tower, El Rancho Tower, lndustri:al No. 2 Tower, NE Elk Tower, South Elk. Tower, and NW Sector Tower. OAC 252:631-3-16- Dead-ends in the distribution system were not flushed
at least once every ninety (90) days or more frequently as necessary to
maintain adequate chlorine residuals. OAC 252:631-3-19(b) - The residuals in the lagoons were not kept two (2) feet below the maximum operating depth.
Respondent received the NOV on June 29, 2023. The NOV required Respondent to immediately
correct ilhe violation above numbered 4..1 and to provide documentation oftheir correction to DEQ
within thirty (30) days ofreceipt ofthe NOV. The NOV also required Respondent to submit to DEQ
an approvable corrective action plan ("CAP"), with dates, for the violations numbered 4.2-4.12
within thirty (30) days ofreceipt ofthe NOV. Ifany violations requiring immediate correction could
not be corrected within thirty (30) days, Respondent was required to provide the reasons why and to
include the violations in the approvable CAP, with dates.
5. On July 19, 2023, DEQ received from Respondent a response for NOV No. P-1010809-
23-2 that provided an approvable CAP, with dates, for the violations.
6. On May 3, 2024, DEQ issued NOV No. P-1010809-24-1 to Respondent for the TOC TT
violations occurring from April 1, 2023, to March 31, 2024. Respondent received the NOV on
May 6, 2024. The NOV required Respondent to take action to eliminate and prevent the
reoccummce ofthe cited violations.
7. On May 17, 2024, Isaac Sparks, District Representative for DEQ, performed a follow-up
Page3 ofl3
WhZWt^/K< /Z
Public Uti lities Authority PWSID No. OK1010809 Consent Order, Case No. 24-322 inspection of Respondent's PWS system. During this inspection, Mr. Sparks confirmed that violations 4.2-4.S, 4.7, 4.9, and 4.12 had been corrected. 8. On July 17, 2024, DEQ sent respondent a letter requesting a written update to NOV No. P1010809-23-2 from Respondent. On August 29, 2024, Respondent provided an update that demonstrated progress towards the correction of the violations cited in the NOV and provided an updated CAP, with dates. This CAP includes a schedule for budgeting necessary funds to correct the violations, hiring necessary staff to perform flushing, storage tank inspections, and bidding of projects. 9. On July 25, 2024, DEQ issued NOV No. P-1010809-24-2 to Respondent for the TOC TI violations occurring from July I, 2023, to June 31, 2024. Respondent received! the NOV on July 29, 2024. The NOV required Respondent to take action to eliminate and prevent the reoccurrence of the cited violations. 10. On January 6, 2025, Mr. Sparks attempted to contacted The Honorable Robert Armstrong, Chairman for Respondent, by telephone. Mr. Sparks was informed by the city hall clerk that email was the best way to contact Mayor Armstrong directly. Mr. Sparks sent an email that notified Mayor Armstrong that DEQ would be offering Respondent this Consent Order to establish a schedule to eliminate and prevent TOC TI, construction, and operational violations. Mayor Armstrong was notified ofboth the included penalty and the option to meet with DEQ for an early resolution meeting to discuss the tenns presented in this Consent Order. 11. On January 13, 2025, Mr. Sparks spoke with Chris Deal, City Manager for Respondent, by telephone. Mr. Deal was notified that DEQ would be offering Respondent this Consent Order to
Page4 of 13
WhZWt^/K< /Z
Public Utilities Authority PWSIDNo. OK1010809 Consent Order, Case No. 24-322 establish a schedule to eliminate and prevent TOC TT, construction, and operational violations. Mr. Deal was to infonn Mayor Armstrong of the offered Consent Order, and Mayor Armstrong was to respond to DEQ. 12. On Januruy 13, 2025, Mayor Armstrong requested an early resolution meeting. The
meeting was held Februruy 13, 2025. In attendance, representing DEQ, was Afiya Wilkins,
Attorney for DEQ; and Mr. Sparks. In attendance, representing Respondent, was Mayor Armstrong, Mr. Deal, Larry Jones, Assistant Director ofPublic Works; and Karl Holtz, Water and Wastewater Superintendent for Respondent. During this meeting, the tasks of this Order, their associated due dates, and penalty amounts were discussed. Based on Respondent's work towards resolving the violations, DEQ agreed to defer all penalties, as indicated in Paragraph 27 of this Order.
13. The parties agree that it is beneficial to resolve these matters promptly and by agreement
14. The parties waive the filing ofa petition or other pleading, and Respondent waives the right to a hearing.
CONCLUSIONS OF LAW 15. DEQ has regulatory jurisdiction and authority in this matter, and Respondent is subject to the jurisdiction and authority of DEQ under 27A O.S. 1-3-I0l(B) and the Oklahoma Water Supply Systems Act, 27A 0.8. 2-6-301 et seq., and the rules promulgated thereunder in the Oklahoma Administrative Code ("OAC") at OAC 252:626 and OAC 252:631. 16. Respondent and DEQ are authorized by 75 O.S. 309(E) and 27A O.S. 2-3-506(8) to resolve this matter by agreement.
Page 5 of 13
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OK1010809 Consent Order, Case No. 24-322 17. Respondent violated OAC 252:626-l i-3(g)(4)(B). This provision states a PWS system must equip liquid chemical storage tanks with "an overflow and receiving basin or drain capable of receiving accidental spills or overflows." 18. Respondent violated OAC 252:626-J5-5(dXl)(E). This provision states a PWS system must equip each pump with a "discharge measuring device." 19. Respondent violated OAC 252:626-17-l(k). This provision states a PWS system must "(mJake the roof and side walls of all structures watertight with no openings except properly constructed vents, manholes, overflows, risers, drains, pump mountings, control ports, and piping for inflow and outflow." 20. Pursuant to OAC 252:631-1-3, "The provisions of Parts 141, 'National Primary Drinking Water Regulations,' and I43, 'National Secondary Drinking Water Regulations,' of Title 40 of the Code of Federal Regulations (C.F.R.J as published on October 30, 2024, and the requirements contained therein are, unless otherwise specified, adopted and incorporated by reference." 21. Respondent violated OAC 252:631 -3-l(a). This provision states "[a)ll systems must properly operate, in accordance with a Operations and Maintenance manual as required by OAC 252:626-3-7. All system must maintain each unit to provide treatment of the water in accordance with the DEQ approved plans specifications, in accordance with the purpose for ....bich the units
wm designed and according to the tenns of their pennits... Employees must be trained in the
proper operation and maintenance ofthe system." 22. Pursuant to OAC 252:631-3-l(b), "Public water supply systems must comply with all applicable Primary Drinking Water Standards in 40 [C.F.R.J Part 141..."
Page 6 of 13
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OKI0I0809 Consent Order, Case No. 24-322
23. Respondent violated OAC 252:631-3-16. This provision states "PWS systems must a,oid
dead-ends in the distribution system. Where a dead-end main exists, it must be equipped with a
valve or other arrangement for flushing. Flush until the water is clear or a chlorine residual is
found. Flush every ninety (90) days or more often where conditions require."
24. Pursuant to 40 C.F.R. 14l.135(b), PWS systems must achieve specified percent
reductions ofTOC, dependent on source-water TOC and source-water alkalinity characteristics.
25. R':5pondent violated 40 C.F.R. 141.135(c){l)(v). This provision states that 12-month,
TOC removal ratio averages must remain at 1.00 or greater.
ORDER
26. Based on the above paragraphs, Respondent and DEQ agree, and it is ordered by the Execwve
Director as follows:
TASK
DATE
A. Respondent shall correct the violations addressed by the approved updated CAP referenced in Paragraph 8 of this
Order and attain compliance with their associated requirements.
B. Respondent shall attain compliance with roe TT
requirements or proceed to complete Task D.
C. Respondent shall maintain compliance with roe TT
requirements or proceed to complete Task D.
July I, 2025
July I, 2026 July I, 2027
D. If compliance with TOC TT requirements is not attained and/or maintained, Respondent shall submit an approvable engineering report proposing a schedule, with actions and dates, for achieving and maintaining compliance. The approvable engineering report will be incorporated into an addendum to this Consent Order to ensure Respondent continues to make progress in
180 days after receiving
notification from DEQ that Task D
is required.
Page 7 of 13
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OK1010809 Consent Order, Case No. 24-322
addressing the cited violations. 27. The Oklahoma Environmental Quality C<>de, 27A O.S. 2-3-502(8) and (K), authorize
DEQ to seek penalties ofup to Ten Thousand Dollars ($10,000.00) per day. Based on the facts
and circumstances ofthis case, DEQ assesses a total penalty ofNine Thousand Two Hundred Fifty
Dollars ($9,250.00). DEQ agrees to defer the entirety ofthe penalty amount, Nine Thousand Two
Hundred Fifty Dollars ($9,250.00), pending compliance with the due dates set forth in Paragraph
26 in this Consent Order. If Respondent fails to, complete a task by the scheduled due date, the
portion ofthe deferred penalty allocated in the table below becomes immediately due and payable.
If Respondent completes a task by its due date, DEQ agrees to waive the portion of the deferred
penalty allocated to that task in the table below. Ifcompliance with the Choose an item. is attained
or maintained by its respective due date, any remaining deferred penalty shall be waived.
TASK
A
B C D
AMOUNT DEFERRED
$4,625.00 NIA NIA
$4,625.00
Payment shall be by check or money order payable to the Oklahoma Department of Environmental
Quality (or ODEQ), showing the Case Number of this Consent Order, and delivered to:
Accounts Receivable Financial and Human Resources Management
Oklahoma Department of Environmental Quality
P.O. Box 2036 Oklahoma City, OK 73101-2036
28. Respondent agrees that if Respondent fails to complete any of the task(s) by the specified
due dates set forth in Paragraph 26 in this Consent Order, DEQ may assess stipulated penalties as
follows:
Page 8 of 13
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OKI010809 Consent Order, Case No. 24-322
TASK A B C D
PENALTY PER DAY $420.00 NIA NIA $210.00
Stipulated penalties begin to accrue on the day performance is due, with the total amount of
stipulated penalties not to exceed Seventy-five Thousand Dollars ($75,000.00).
29. If Respondent fails to pay any penalty, DEQ may bring a separate action for collection of
the penalty in district court. An action by DEQ for the collection of a penalty does not affect
Respondent's dtAY to complete the tasks required by this Consent Order.
GENERAL PROVISIONS
30. Respondent agrees to perform the requirements of this Consent Order within the time frames
specified unless performance is prevented or delayed by events which are a "force rnajeure." For
purposes of this Consent Order, a force majeure event is defined as any event arising from causes
beyond the rearonable control of Respondent or Respondent's contractors, subcontractors, or
laboratories that delays or prevents the performance of any obligation under this Consent Order.
Examples are v111dalism, fire, flood, labor disputes or strikes, weather conditions that prevent or
seriously impair construction activities, civil disonler or unrest, and "acts of God." Force majeure
events do not include increased costs ofperformance of the tasks agreed to in this Consent Onler or
changed economic circumstances. Respondent must notify DEQ in writing within fifteen (15) days
after Respondent knows, or should have known, ofa force majeure event that is expected to cause a
delay in achieving compliance with any requirement of this Consent Order. Failure to submit
notification within fifteen (15) days waives the right to claim force majeure.
Page 9 of 13
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OKI0I0809 Consent Order, Case No . 24-322 31 . As used in this Consent Order, an "approvable" submission to DEQ shall be considered a
final submission. That is, all preliminary discussions between DEQ and Respondent regarding the
requirements of a submission must be concluded prior to the date the submission is due, so that the submission will be approvable as submitted. Ifthe submission is not submitted in an approvable fonn by its due date, then the submission will be considered delinquent, and Respondent will be subject to the monetary penalties described in this Consent Order. 32. Upon their approval by DEQ, any final reports, plans, specifications, schedules, and
attachments required under this Consent Order are incorporated into it and enforceable under iL
Failure of Respondent to respond within a reasonable time to any errors, deficiencies, or other regulatory requirements identified by DEQ is a violation ofthis Consent Order. 33. No informal advice, guidance, suggestions, or comments by employees of DEQ regarding reports, plans, specifications, schedules, and othe1 writings affect Respondent's obligation to obtain written approval by DEQ when required by this Consent Order. 34. IfRespondent is required to sample or test, Respondent agrees to give DEQ reasonable notice ofthe sampling or testing date and time and allow DEQ to observe and/or split-sample. 35. Unless otherwise specified, any report, notice, or other communication required under this Consent Order must be in writing and must be sent to:
For the Department ofEnvironmental Quality
Isaac Sparlcs, District Representative Public Water Supply Engineering and Enforcement Section Water Quality Division Oklahoma Department of Environmental Quality P.O. Box 1677 Oklahoma City, OK 73101-1677
Page 10 of 13
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OKI0J0809 Consent Order, Case No. 24-322
For Respondent Robert Armstrong, Chairman Duncan Public Utilities Authority P.O. Box969 Duncan, OK 73534
36. This Consent Order is enforceable as a final order ofthe Executive Director ofDEQ. DEQ retainsjurisdiction ofthis matter for the purposes ofinterpreting, implementing, and enforcing the terms and conditions ofthis Consent Order and for the purpose of resolving disputes. 37. Nothing in this Consent Order limits DEQ's right to take enforcement action for violations discovered or occurring after the effective date ofthis Consent Order. 38. Nothing in this Consent Order excuses Respondent from its obligation to comply with all applicable federal, state, an<! local statutes, rules, and ordinances. Respondent and DEQ agree that the provisions of this Consent Order are considered severable, and if a court of competent jurisdiction finds any provisions to be unenforceable because they are inconsistent with state or federal law, the remaining provisions will remain in full effect. 39. Respondent .agrees to notify all potential purchasers ofthe property that 'the obligations under this Consent Order are binding on the purchaser. Within ten (10) days of the sale of the property, Respondent will notify DEQ ofthe sale and provide the name and address of the purchaser to DEQ. 40. The provisions of this Consent Order apply to and bind Respondent and DEQ and their officers, directors, employees, agents, successors, and assigns. No change in the ownership or corporate status ofRespondent will affect Respondent's responsibilities under this Consent Order. 41. Compliance with the terms and conditions ofthis Consent Order fully satisfies Respondent's
liability to DEQ for all items of noncompliance in this Consent Order. If Respondent satisfies the
Page 11 ofl3
WhZWt^/K< /Z
Public Utilities Authority PWSID No. OK1010809 Consent Order, Case No. 24-322 requirements ofthis Consent Order, DEQ will not pursue any other remedy, sanction, or relief that might otherwise be available to address the issues of noncompliance in this Consent Order. 42. 1bis Consent Order is for the pwpose of settlement Neither the fact that Respondent and DEQ have agreed to this Consent Order, nor the Findings ofFact and Conclusions ofLaw in it, shall be used for any purpose in any proceeding except the enforcement by Respondent and DEQ of this Consent Order and, if applicable, a future detmnination by DEQ of eligibility for licensing or permitting. As to others who are not parties to this Consent Order, nothing contained in this Consent Order is an admission by Respondent ofthe Findings ofFact or Conclusions ofLaw, and this Consent Order is not an admission by Respondent of liability for conditions at or near the facility and is not a waiver ofany right, cause of action, or defense Respondent otherwise has. 43. Respondent and DEQ agree that the venue of any action in district court for the purposes of interpreting, implementing, and enforcing this Consent Order will be Oklahoma County, Oklahoma. 44. The requirements of this Consent Order will be considered satisfied, and this Consent Order terminated, when Respondent receives written notice from DEQ that Respondent has demonstrated that all the terms of the Consent Order have been completed to the satisfaction of DEQ, and that any assessed penalty has been paid.
45. Respondent and DEQ may amend this Consent Order by mutual consent. Such
amendments must be in writing and the effective date ofthe amendments will be the date on which they are filed by DEQ.
Page 12 of 13
WhZWt^/K< /Z
ncan Public Uti lities Authority PWSID No. OK 10 I0809 Consent Order, Case No. 24-322
46. The ind ividuals signing thjs Consent Order certify that they are authorized to sign it and to
legally bind the parties they represent.
47. This Consent Order becomes effective on the date of the later of the two signatures below.
FOR RESPONDENT:
OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY:
~~
Chairman
~ " " - ~ , ~ L( - il - 'lS
~ ROBERT D. SINGLETARY
Executive Director
Date: '-\ - 11 - ? ~
Page 13 of 13