KAISER ENGINEERS, INC. MIDDLETOWN, OHIO
FINAL PROJECT REPORT ARMCO STEEL CORPORATION
STEELMAKING AREA & SOUTH AREA LOCKER ROOMS
PROJECT 7114
MAY 1969
PLAINTIFFS EXHIBIT
ARO-199
! L'Pv
i:
pi-
: ij'V-! ter ifjy; |l ,
IpIfi'.L, fLS.
j3$; ,
Distribution: Armco
F. W. Barnes R. F. Boschert V. J. Curtis T. R. Foley A. M. Greco C. G. Kramer iD. C. Osborne P. R. Smith J. M. Thomas
Kaiser D. A. Daly B. P. Franceschi V. L. Frankson E. D. Lowell G. L. Roberts R. J. Wolf
BLUE, SMALL RED
Approved
R. C. Hulseman
Approved:
<^dr'. . G. Irnherr
AKE-003212
I l
fe:
KAISER ENGINEERS, INC. MIDDLETOWN, OHIO
FINAL PROJECT REPORT ARMCO STEEL CORPORATION STEELMAKING AREA AND SOUTH AREA
LOCKER ROOMS
PROJECT 7114
CONTENTS
PROJECT SUMMARY General Description Project Authorization Project Personnel Project Progress
PROJECT SCHEDULE FINAL SUMMARY COST AND COMPARISON DRAWINGS
wM\
fivCly
m
BLUE, SMALL RED
AKE-003213
' L;.. )
fen iv H'
;/
FINAL PROJECT REPORT STEELMAKING AREA & SOUTH AREA
LOCKER ROOMS PROJECT 7114
1. 0 GENERAL DESCRIPTION Two Locker Room Facilities have been constructed in the current Middletown Works Expansion Program. One is in the Steelmaking Area to serve the Basic Oxygen Plant and other melting facilities. The other is in the South Area and sei'ves the 86" Hot Strip Mill, Slab Mill, Soaking Pits, and Finishing Facilities. The South Area facility was constructed for 820 lockers and the Steelmaking Area facility for 632 lockers. A more detailed description is contained in Engineering Report No. 7114.
2. 0 PROJECT AUTHORIZATION Engineering Report No. 7114 was issued December 12, 1966, with an appropriation request for $678, 000. Armco management approval of the request for appropriation was granted February 10, 1967,
3. 0 PROJECT PERSONNEL Armco Program Engineer ....................... . Mr. T. R. Foley Armco Project Engineer............................... Mr. R. F. Boschert Armco Project-Engineer - Electrical ...... Mr... J.. J. .Delaney Kaiser Engineers' Project Engineer ... Mr. H. F. Wulfekamp
BLUE, SMALL RED
AKE-003214
J
4. 0 PROJECT PROGRESS The basic requirements for this project were developed from Industrial Engineering Report 1V1-66-090, as revised by Armco Middletown Works Management.
The scoping information for the project was reviewed and approved
:.? November 29, 1966. Final approval on Engineering Report No.
7114 was granted on December 12, 1966.
I-'.
I
Detail design was started December 13, 1966, and completed
i March 15, 1967. A subcontract bid package of twenty-eight (28)
i drawings and a specification (twenty-one (21) sections) was
prepared and bids were received in May, 1967. The subcontractor
was given notice to proceed on June 6, 1967.
The original construction schedule called for completion of the South Area facility in September, 1967, and the Steelmaking facility in September, 1968.
The Steelmaking Area facility building shell only was to be :;v:
constructed for use as a field office by K. E. construction forces
at the Basic Oxygen Plant. The subcontractor was to return to
the site and complete construction by September 1, 1967.
2- -
BLUE, SMALL RED
!
AKE-003215
Poor subsoil conditions in the South Area delayed start of construction and completion date was changed to December, 1967.
Changes in railroad track layout and grading delayed start of construction in the Steelmaking Area until July, 1967. At this time it was determined that completion would be too late for use as a construction office, so the decision was made to fully complete the structure and lock the facility until required for use by Armco. The South Area facility was completed in January, 1968, and accepted by Armco February 14, 1968. The Steelmaking Area facility was completed (except for connection to utilities) in April, 1968, and accepted by Armco May 2, 1968. The final connections to all building service utilities was completed on November 15, 1968. The facility was turned over to Armco on November 19, 1968.
5. 0 PROJECT SCHEDULE A project schedule showing the actual versus the planned progress is attached.
BLUE, SMALL RED
AKE-003216
AKE-003217
BLUE, SMALL RED
PROJECT NO. 7 Ilh ________________ _________ KAISER ENGINEERS, IN C
REPORT DATE 12/12/66
10F2
6. 0 FINAL SUMMARY COST AND COMPARISON A tabulation of the final cost as compared with the Engineering Report budget for the project is attached. The original estimate for this project was prepared on the premise that the design and construction would be performed by Kaiser Engineers, Inc. The design was prepared by Kaiser, however, the construction was performed on a lump sum basis by David L. Smith Construction Company.
With the construction performed on a lump sum contract the costs assigned to various accounts vary considerably from the budget and do not represent the actual costs since this information was not available to our cost accounting.
BLUE, SMALL RED
5-
AKE-003218
r ;ioj;
i&.-L
S[ ik'&i?3':;
!| mj.J c.i.
M* te ilK.$
&
+> TtyJ OC CT3
fi
-4 CVj
& a?
n
o o ^~v
p
cx.
& S^o 'O^o oOf*.'O&a>
o c o. ?
w- c c
wc
*H *d
O 41
2cs3 W W
ocv V. a5>*
I t g
O
O Ci
^ trt o. o
a* 3
xf a
3
4tJf aO 8
8
un
CoO
UN CO
-s4o*"
m cn IT\ co
*> VO cn cn
un
O cn
cUoN -s4o-
cn cn
88 8 88 8
On UN
a*-
c0o\
l/NOJ
t*- UN
VO
* *.**>
ITS VO
NO fC^OVOOJ
co
8
VO
ON UNCO
g S'
cn
&
Si
VO
**
cn
CJN OJ
ft
vo
t-- m
OJ
cHn
H
$
g On UNCO cn N4
a
-it cnco
VO
cn
o*
4\ *N
t-- cn
On cn OJ
01 so
cn
*v iH
$
CONO
UN OJ
UN VD UN
S * cn
r-C -<
VO
CN UN 8
cOnn
-f
UNC
OcnJ c-
S so
cn Os
ocn*
t*- cn OJ
\o
OJ so
VO
8
8s vo vo
vJSoI
Si
vo
t *
H r-t
$
Si
VO
vSoi
$$
CO VD vo
vSoi
Si
VD
>
f-t H
8
3
I
^> G
OO a> h Eg CO
P 0
1
CO
o PC p 4; M
CO
8
sj?
On On On
BLUE, SMALL RED
-6-
AKE-003219
Mi !- 7. 0 GENERAL ARRANGEMENT DRAWINGS
VI i
Drawings 665603, 665604, 665617, and 665618 showing' the
general features of these facilities are attached. If