Document QXnebzG15LK6Za33ErQ58NEo6

!.rJ P I'iV. KAISER ENGINEERS, INC. MIDDLETOWN, OHIO FINAL PROJECT REPORT ARMCO STEEL CORPORATION STEELMAKING AREA & SOUTH AREA LOCKER ROOMS PROJECT 7114 MAY 1969 PLAINTIFFS EXHIBIT ARO-199 ! L'Pv i: pi- : ij'V-! ter ifjy; |l , IpIfi'.L, fLS. j3$; , Distribution: Armco F. W. Barnes R. F. Boschert V. J. Curtis T. R. Foley A. M. Greco C. G. Kramer iD. C. Osborne P. R. Smith J. M. Thomas Kaiser D. A. Daly B. P. Franceschi V. L. Frankson E. D. Lowell G. L. Roberts R. J. Wolf BLUE, SMALL RED Approved R. C. Hulseman Approved: <^dr'. . G. Irnherr AKE-003212 I l fe: KAISER ENGINEERS, INC. MIDDLETOWN, OHIO FINAL PROJECT REPORT ARMCO STEEL CORPORATION STEELMAKING AREA AND SOUTH AREA LOCKER ROOMS PROJECT 7114 CONTENTS PROJECT SUMMARY General Description Project Authorization Project Personnel Project Progress PROJECT SCHEDULE FINAL SUMMARY COST AND COMPARISON DRAWINGS wM\ fivCly m BLUE, SMALL RED AKE-003213 ' L;.. ) fen iv H' ;/ FINAL PROJECT REPORT STEELMAKING AREA & SOUTH AREA LOCKER ROOMS PROJECT 7114 1. 0 GENERAL DESCRIPTION Two Locker Room Facilities have been constructed in the current Middletown Works Expansion Program. One is in the Steelmaking Area to serve the Basic Oxygen Plant and other melting facilities. The other is in the South Area and sei'ves the 86" Hot Strip Mill, Slab Mill, Soaking Pits, and Finishing Facilities. The South Area facility was constructed for 820 lockers and the Steelmaking Area facility for 632 lockers. A more detailed description is contained in Engineering Report No. 7114. 2. 0 PROJECT AUTHORIZATION Engineering Report No. 7114 was issued December 12, 1966, with an appropriation request for $678, 000. Armco management approval of the request for appropriation was granted February 10, 1967, 3. 0 PROJECT PERSONNEL Armco Program Engineer ....................... . Mr. T. R. Foley Armco Project Engineer............................... Mr. R. F. Boschert Armco Project-Engineer - Electrical ...... Mr... J.. J. .Delaney Kaiser Engineers' Project Engineer ... Mr. H. F. Wulfekamp BLUE, SMALL RED AKE-003214 J 4. 0 PROJECT PROGRESS The basic requirements for this project were developed from Industrial Engineering Report 1V1-66-090, as revised by Armco Middletown Works Management. The scoping information for the project was reviewed and approved :.? November 29, 1966. Final approval on Engineering Report No. 7114 was granted on December 12, 1966. I-'. I Detail design was started December 13, 1966, and completed i March 15, 1967. A subcontract bid package of twenty-eight (28) i drawings and a specification (twenty-one (21) sections) was prepared and bids were received in May, 1967. The subcontractor was given notice to proceed on June 6, 1967. The original construction schedule called for completion of the South Area facility in September, 1967, and the Steelmaking facility in September, 1968. The Steelmaking Area facility building shell only was to be :;v: constructed for use as a field office by K. E. construction forces at the Basic Oxygen Plant. The subcontractor was to return to the site and complete construction by September 1, 1967. 2- - BLUE, SMALL RED ! AKE-003215 Poor subsoil conditions in the South Area delayed start of construction and completion date was changed to December, 1967. Changes in railroad track layout and grading delayed start of construction in the Steelmaking Area until July, 1967. At this time it was determined that completion would be too late for use as a construction office, so the decision was made to fully complete the structure and lock the facility until required for use by Armco. The South Area facility was completed in January, 1968, and accepted by Armco February 14, 1968. The Steelmaking Area facility was completed (except for connection to utilities) in April, 1968, and accepted by Armco May 2, 1968. The final connections to all building service utilities was completed on November 15, 1968. The facility was turned over to Armco on November 19, 1968. 5. 0 PROJECT SCHEDULE A project schedule showing the actual versus the planned progress is attached. BLUE, SMALL RED AKE-003216 AKE-003217 BLUE, SMALL RED PROJECT NO. 7 Ilh ________________ _________ KAISER ENGINEERS, IN C REPORT DATE 12/12/66 10F2 6. 0 FINAL SUMMARY COST AND COMPARISON A tabulation of the final cost as compared with the Engineering Report budget for the project is attached. The original estimate for this project was prepared on the premise that the design and construction would be performed by Kaiser Engineers, Inc. The design was prepared by Kaiser, however, the construction was performed on a lump sum basis by David L. Smith Construction Company. With the construction performed on a lump sum contract the costs assigned to various accounts vary considerably from the budget and do not represent the actual costs since this information was not available to our cost accounting. BLUE, SMALL RED 5- AKE-003218 r ;ioj; i&.-L S[ ik'&i?3':; !| mj.J c.i. M* te ilK.$ & +> TtyJ OC CT3 fi -4 CVj & a? n o o ^~v p cx. & S^o 'O^o oOf*.'O&a> o c o. ? w- c c wc *H *d O 41 2cs3 W W ocv V. a5>* I t g O O Ci ^ trt o. o a* 3 xf a 3 4tJf aO 8 8 un CoO UN CO -s4o*" m cn IT\ co *> VO cn cn un O cn cUoN -s4o- cn cn 88 8 88 8 On UN a*- c0o\ l/NOJ t*- UN VO * *.**> ITS VO NO fC^OVOOJ co 8 VO ON UNCO g S' cn & Si VO ** cn CJN OJ ft vo t-- m OJ cHn H $ g On UNCO cn N4 a -it cnco VO cn o* 4\ *N t-- cn On cn OJ 01 so cn *v iH $ CONO UN OJ UN VD UN S * cn r-C -< VO CN UN 8 cOnn -f UNC OcnJ c- S so cn Os ocn* t*- cn OJ \o OJ so VO 8 8s vo vo vJSoI Si vo t * H r-t $ Si VO vSoi $$ CO VD vo vSoi Si VD > f-t H 8 3 I ^> G OO a> h Eg CO P 0 1 CO o PC p 4; M CO 8 sj? On On On BLUE, SMALL RED -6- AKE-003219 Mi !- 7. 0 GENERAL ARRANGEMENT DRAWINGS VI i Drawings 665603, 665604, 665617, and 665618 showing' the general features of these facilities are attached. If BLUE, SMALL RED -7- AKE-003220 BLUE, SMALL RED u rfi iTpi'fpTifiwi'itiit AKE-003221 BLUE, SMALL RED AKE-003222 BLUE, SMALL RED AKE-003223 BLUE, SMALL RED AKE-003224