EDC BARGE AND SHIP LOADING PROCEDURE
/ ???
PAGE 1
SL 091469
Ethylene Dichloride (EDO is a flammable product. Prior
to loading EDO, you must
knoleidgeable) in procdures and
regulations pertaining to EDC. This section describes the
procedures used at the PPG, Lake Charles Compi.es. You must;
also refer to the procedures outlined in "PPG Standard Barge
Loading, All Barges" and the Code of Federal Regulations
V
(46 CFR Subchapter 0). Key referencei'are shown below:
46 CFR Subhcapter 0, Part 151.05 Minimum Requiremsnts
Cargo Tanks (Vents) - 46 CFR Part 32.55-25 (A-B)
Cargo Tanks (Vents) - 46 CFR Part 32.55-30 (C)
Flammable Liquid - 46 CFR 30.10-22
Flame Screen - 46 CFR 30.10-25
\ fEDC is a grade C flammable liquid. The Chemical Data
Guide extinguishing agents for EDC are C02, dry chemical,
foam, and water fog. The short exposure tolerence for EDC is
200 ppm for one hour.
Hands-on-training
shore tank arrangement, piping
dystem and valving will be given in the field by a .^qual i fiedi
^ cXfywfali
trainer. Classroom training will consist of
b$pks,
//-
Chemical Data Guide and PPG training manuals.
There is a special requirement with EDC pertaining to
the person in charge (PIC) of an EDC transfer. Since EDC is
a flammable product, the Code of Federal Regulations (46 CFR
151.45-4) loading.
requires a cert;iified tankerman to be in chargeof-tiu.
Ott^t ri r
k.
Therefore, at PPG Lake Charles, aflead tankerma'n
du-faut
0 ,j
will be in charge of EDC loading on all barges.
PAGE 2
SL 091470
AH lead tankermen are required to complete a^tankerman test-
to become certified. In the case of EDC transfers to a ship, the ship's master or mate will serve to meet the requirenr-nt of the licensed PIC, so a lead tankerman would not be needed.
EDC barge loading can be done at either Docks' "A" cr "C". EDC ships can be loaded at either Dock^ "A" or "C.
Following is a step-by-step procedure for loading EDC. Where noted* T.V. will apply to Tank Vessels (ships) and T.B. will apply to Tank Barges. Pre-Loading and Inspect i_on Requirements 1. (TB) Spot the barge. Barges toDloaded at "A" dock will
normally be spotted by contract tug.
2. (TB/TV) Obtain the shore tank number from the Shift
Foreman or Day Foreman. ^The foremanfif a surveyor is
specified so he can be called out.
3. (TB) Place the gang plank on the barge and secure. '"A"-
rtnrli
"fT"t i iiuil imnn nlanlr for n~tr with hiinrT--"The -
gang plank is nr*f|fc,i
1--fui ships^
4. (TB) Complete pre-loading inspection of barge (see 46
CFR 151.45-5). Close sea cock valve and pump stern rake
5. (TB/TV) 1-1--klll^TTrTTVOpteratnr tn
p Huajr^ -
Gauge the shore tank. In the case of a ship, gauge the
shore tank before the ship arrives.
6. (TV) complete the Declaration of Inspection with the
ship's representative before hooking up.
PAGE 3
SL 091471
7. (TB/TV) Check and apply all warning signs and signals
(see 45 CFR 151.45-2 and 151.45-9). Hook up the
grounding cable. Using the Certificate of Inspection
found in the document tube on the barge, determine the
number and type of fire extinguishers tq. he uj^drr,r^t.h~.v,
---?--*--- 'jin
c-------- --- fu^e
on*. i^p
1~-'. u>
See 46 CFR 151.45-2;c-d).
9. (TB/TV) Hook up the loading hose. Locate and identify
al l^pumpQki11 switches and automatic valve shutdown
switches. These are located on the handrail near the
loading chaek
.10 (TB/TV) Once the loading hose is hooked up, check the
automatic valve operation before starting transfer.
.11 (TB) Line up the barge piping. The PIC of the ship
will line up the ship's piping.
12. (TB/TV) Make sure the dock loading valve and vents on bipiA/c^
the loading hosefare closed.
y
13. (TB/TV) Line up the shore tank piping from the docks _ fsi
,yto the tank. Complete required tagging procedures.
Check to be sure the tanks have been gauged and record
the tank temperature. When loading a barge, be sure the stern rake is pumped out before transfer/t|<^y
LOADING
1. (TB//TV) Begin transfer via gravity flow. Oonncce flow is
ver ifiedT start pumps.
'
.2 (TB/TV) Check the-4a^p--WW- piping from the dock to the
shore tanks for leaks. If leaks are detected, shut down
PAGE 4
SL 091472
and correct the problem 3. (TB/TV) Resume loading. On a multi-bank targe controJ
the flow to the tanks to keep the barge level. 4. (TB) Adjust mooring lines during loading as needed.
Continue checking dry compartments for leaks throughout, product transfer. Follow the topping off procedures described in "Standard Barge Loading, All Barges." 5. ^(TB/TV) Obtain a line sample. When loading a ship, the surveyor will complete all sampling and gauging with you. 6. <TB) When barge loading is complete, clear the loading hose and barge lines into the barge before leaving the dock area to gauge the shore tanks 7. (TV) When ship loading is complete. clear the loading hose from the automatic valve to the ship's tank. 8. (TB/TV) Gauge the barge or ship. Disconnect the loading
9. (TB) If the stern rake was pumped out, be sure the
(TB/TV) Take samples and the original copy of the loading form to the lab.
PAGE 5
SL 091473
EDC BARGE AND SHIP LOADING
Ethylene Dichloride (EDC) is a flammable product. Prior to
loading EDC, you must be knowledgeable in procedures and
regulations pertaining to EDC, This section describes the
procedures used at the PPG, Lake Charles Complex. You must also
refer to the procedures outlined in "PPG Standard Barge Loading,
All Barges" and the Code of Federal Regulations (46 CFR Subchapter
0). Key references are shown below.
Chemical Data Guide - p. 139
46 CFR Subchapter 0, Part 151.05 Minimum Requirements
Cargo Tanks (Vents) - 46 CFR Part 32.55-25 (A-B)
Cargo Tanks (Vents) - 46 CFR Part 32.55-30 (C)
Flammable Liquid - 46 CFR 30.10-22
Flame Screen - 46 CFR 30.10-25
*
EDC is a grade C flammable liquid. The Chemical Data Guide
extinguishing agents for EDC are COg, dry chemical, foam, and water
fog. The short exposure tolerance for EDC is 200 ppm for one hour.
Hands-on-training in shore tank arrangement, piping system and
valving will be given in the field by a qualified trainer.
Classroom training will consist of CFR books, Chemical Data Guide
and PPG training manuals.
There is a special requirement with EDC pertaining to the
person in charge (PIC) of an EDC transfer. Since EDC is a
flammable product, the Code of Federal Regulations (46 CFR
151.45-4) requires a certified tankenman to be In charge of
loading. Therefore, at PPG Lake Charles, a lead tankerman will be
in charge of EDC loading on all barges. All lead tankermen are
SL 091474
required to complete a tankerman test to become certified. In the case of EDC transfers to a ship, the ship's master or mate will serve to meet the requirement of the licensed PIC, so a lead tankerman would not be needed.
EDC barge loading can be done at either Dock "AV"C"# f
EDC ships can be loaded at either Dock "A" or "C". *
Following is a step-by-step procedure for loading EDC. Where
noted, T.V. will apply to tank vessels (ships) and T.B, will apply
to tank barges.
Pre-loading and Inspection Requirements
1. (TB) Spot the barge. Barges to be loaded at "A" dock will
normally be spotted by a contract tug.
r,--
v'T
or
2. (TB/TV) Obtain the shore tank number from Traffic ordera.
flotrtfy'The foreman if a surveyor is specified so he can be
called out. 3. (TB) Place the gang plank on the barge and secure. "A" dock
has a fixed gang plank for use with barges. The gang plank is not to be used for ships. 4. (TB) Complete pre-loading inspection of barge (See 46 CFR 151.45-4). Close sea cock valve and pump stern rake if
needed. 5. (TB/TV) Call EDC Lead Operator to secure the tank. Gauge the
shore tank. In the case of a ship, gauge the shore tank before the ship arrives. 6. (TV) Complete the Declaration of Inspection with the ship's
representative before hooking up. 7. (TB/TV) Check and apply all warning signs and signals. (See
46 CFR 151.45-2 and 151.45-9). Hook up the grounding cable.
SL 091475
Place a fire extinguisher on deck near the gang plank of a barge. 8. (TB) After inspection all cargo latches must be covered with flame screens. These must remain closed during loading except when gauging. (See 46 CFR 151.45-2;c-d). 9. (TB/TV) Hook up the loading hose. Locate and identify all pump kill switches and automatic valve shutdown switches. These are located on the handrail near the loading shack. 10. (TB/TV) Once the loading hose is hooked up, check the automatic valve operation before starting transfer. 11. (TB) Line up the barge piping. The PIC of the ship will line up the ship's piping. 12. (TB/TV) Make sure the dock loading valve and vents on the loading hose are closed. 13. (TB/TV) Line up the shore tank piping from the docks to the
* tank. Complete required tagging procedures. Check to be sure the tanks have been gauged and record the tank temperature. When loading a barge, be sure the stern rake is pumped out before starting transfer. Loading 1. (TB/TV) Begin transfer via gravity flow. Once flow is verified, start pumps. 2. (TB/TV) Check the hose and piping from the dock to the shore tanks for leaks. If leaks are detected, shut down and correct the problem. 3. (TB/TV) Resume loading. On a multi-tank barge, control the flow to the tanks to keep the barge level.
SL 091476
/
4. (TB) Adjust mooring lines during loading as needed. Continue checking dry compartments for leaks throughout product transfer. Follow the topping off procedures described in "Standard Barge Loading, All Barges."
5. (TB/TV) Obtain a line sample. When loading a ship, the surveyor will complete all sampling and gauging with you.
6. (TB) When barge loading is complete, clear the loading hose and barge lines into the barge before leaving the dock area to gauge the shore tanks.
7. (TV) When ship loading is complete, clear the loading hose from the automatic valve to the ship's tank.
8. (TB/TV) Gauge the barge or ship. Disconnect the loading hose. 9. (TB) If the stern rake was pumped out, be sure the pump is
removed from the barge. 10. (TB/TV) Complete loading and inspection forms. Secure the
boom line to the dock, police the dock and lock the gate. 11. (TB/TV) Take samples and the original copy of the loading form
to the lab.