Document QXgk7bya56a5rJGYn09OMBkOk

CEA 2132 - Project variance No. 1 DISTRIBUTION: 0. R. Bailey J- M. Depp : M. Dmytryszyn R. E. Emling F. J. Holzapfel R. E. Howard R. W. Kaltenrieder F. P. LaBelle R. E. Lenz C. L. Parish A. B. Terry R. W. Peterson R. M. Kountz R. C. Herman i ORGANIC DIVISION R. f Haydel W. . Kuhn j/t . Landwehr L. Minckler W. F. Taffee H. L. Williams DSW 200082 STLCOPCB4058146 CENTRAL ENGINEERING . APARTMENT AMOUNT APPROPRIATED * $3.320.000______________________ EST. FINAL POST * $3,418,000___ SUM PREVIOUS VARIANCES ______"-------------------- THIS VARIANCE_________$213,000---------- ced project m*gr_____R C.__Herman CED PRODUCT M'GR. --KOUntZ PROJECT JRIANCE No_____l CEA NO. 2132 l|Bo07^52 PRODUCT Airoclor DATE 1-13-69 TITLE Aroclor Purification DIVISION Oroanic DIV. REPRESENTATIVE PLANT Anniston R. A. Havdel DESCRIPTION, justification, effect on project schedule SEE CED PROCEDURE 119. USE BOTH SIDES OF PAPER AND LIMIT TO ONE SHEET. *Appropriations 1430/1800 and 1452 have been combined into one omnibus job and the dollars shown reflect the total values for the omnibus. Provide Purification Columns Classification - Optional Origin - Division It has been concluded by the Functional Fluids Business Group that the quality of Aroclors and Aroclor blends produced at Anniston must be improved. It has been demonstrated in a prototype unit at Anniston and in production units at WGK that quality improvements can be made by passing Aroclor through an activa ted aluminum oxide (Porocel) bed. Organic Division Management has requested that purification columns, which con tain the Porocel, and associated equipment be provided for production at Anniston. They requested funding all work from the omnibus appropriations 1430, 1800 and 1452 and capitalizing the experimental prototype column from the same source. The prototype column is now in permanent service. Thus, there will be a deliverate overrun of the total omnibus appropriation of approximately 3%. The variance cost was developed from a detailed scope of work and it has a probable accuracy of _+ 10%. Design and procurement is proceeding based on verbal approval of the business director. in order to better monitor costs and control this variance, CED is performing the work under CEA-2132. Mechanical completion is scheduled for September 1, 1969. DSW 200083 APPROVAL AS INDICATED ** TITLE PROJECT M'GR. PRODUCT M'GR. AREA M'GR. RANCH DIRECTOR k k DIRECTOR OF CED OIV. REPRESENT. Business Dir. NAME R. cR. Mr R. E. F. J. J. M. R. A. H. S. Herman Kountz Howard Holzapfel Depp Havdel Berqen kk GENERAL M'GR. ** Group vice. President H. L. Minckler T. K. Smith,Jr. SIGNATURE ,__ ~ DATE ./ 6/ t! / ? A ^ --------------- , ,, __________ /M '//Uiuy Si A h' tv h\a* Jt- / ' //a-i/ct/ J------------ `r ^ ------------- STLCOPCB4058147