Document QXe4LxvVGxdgzxR4oVoD5by58

FILE NAME Allied Signal Bendix ASB DATE 1957 Sept 5 DOC ASB073 DOCUMENT DESCRIPTION Memo RE Pressure Packed Asbestos Opener PLAINTIFF'S EXHIBIT Subject: Packed Asbestos Oper Pressure fog To H. Datet Pressure Packed Packed B. We We Disin Ee As A. Disin approved the sddresssd at G3 Boks ve have get up Tor and %o seue which for the addressed 9:30 m gis This will of meetimnegeting which have set the addressed addressed at Monday Monday morning in Stolar's office office review tigh lish future plans et ret pro " oD nsand pag eppreved approved equipment and Engineering has approved approved mix end web Production Production equipment Engineering Engineering approved approved on the basis basis critical including resin starved starved dry dynemometer dynemometer these approvals formules including ef mix materials . end and reports original sumiaty ef equip= attaching copy of our summary summary equip be , are For ment information and production original we could equip & successful successful estimated savings opening equipment difficulties difficulties difficulties process can foreses foreses ba ton savings integrating would justify the procurement equipment on dollars suca and cants which addition there are very procurement intangible intangible dollars dollars such and as savings in space intangible definite handling and such ag definite definite intangible intangible warehouse of uniformity intangible savings convinced convinced that pressurized intangible advantage uniformly opened with mixes Production opening equimmt will convinced more astestos which will result the rreesjueltcts rejects more uniform mixes The our our present ws the integration of this equipment equipment in our present wat lines be of the meeting mix and dry action to be taken taken aspect and to determine what purpose aspect aspect and to determine what future Attach C. F. act 2. L. Rogers Presting Presting Penchasing Penchasing determion determion installation installation okom . todetermion WCK016050