Electrical Hazards should remove any grounds he has used, and his lock-out tags He should clear with the chief electrician or foreman or operator (who ever is in charge) before the equipment is returned to service If the feed-in circuit to a switchboard, bus, or other equipment must be kept live on the incoming side of a breaker or switches, the electrician should provide ample clearance, barriers, or other protection between this section and the part on which he is to work He should not work in cramped quarters unless he has to, and he should insist that the men with him have freedom of movement m case of emergency Live buses, conductors, and switches should be covered with insulated blankets or isolated with barriers Electrically operated or remote-control circuit breakers or contactors should not be depended upon for protection A ground or other disturbance on the control system may permit the circuit breaker to close If no dis connects are installed ahead of or behind the circuit breaker, it will be necessary to block, rackout, or otherwise lock the breaker so that it cannot be closed If the electrician must leave the circuit on which he is working before he completes the test, he should check all markings, breakers, and switches upon his return before he con tinues the tests Rotating equipment Before work is started on a rotating machine that is presumed out-of-service and stopped, an inspection of all the electrical control and starting devices should be made with the plant electrician or foreman For example, when inspections or repairs are to be made on motors, generators, con verters, or synchronous condensers, any part of which is remotely controlled, circuit breakers or switches should be locked out and provided with hold-off tags, and the fuses should be pulled Where direct current machines are used, the electrician must make sure that both positive and negative lines are completely disconnected These machines are some times shut off by opening one side of the line only, but contact with an exposed part and with the frame will permit current to flow and the motor to start Lockout procedures should be followed on generators driven by prime movers The throttle, starting valve, or other means of controlling the energy to the driving part of the unit should be locked and tagged While the equipment is in operation, motor brushes should not be removed or adjusted, contacts or other parts of the electrical equip ment should not be woiked on, and no attempt should be made to clean, sandpaper, or polish commutators, or slip or collector rings Machinery connected to blowers, water wheels, or pumps, without check valves, mav start turning even when the current to the motor has been disconnected For this rea son, the rotor or armature should be blocked before inspections are made When inspecting electrical equipment, do not wear loose clothing because it may be come entangled in couplings, coils, or other moving parts Remos'e wnst watches, rings, metal pens and pencils Do not use metal flashlights Accidental contact with live parts by a nonconducting case will not result m injury, whereas a metal case may cause a short circuit and shock the holder During inspection of rotating equipment, the insulation on the wire and coils should not be depended upon to confine the current, and feeling exposed metal connections and windings with the bare hands should be pro hibited To check the heat dissipation of coils and windings, thermometers or temperature in dicators should be installed when the appa ratus to be tested is out of service and deener gized After the instruments are fastened securely, the equipment can be set m motion and readings taken Although glass is a fairly good insulator, thermometers should never be held while temperatures of energized apparatus are checked Moisture and accumulations on the surface may permit passage of current If air-insulated circuit breakers or contact ors are installed to start motors or other ma chines, and the control circuit cannot be deenergized bv opening switches or pulling fuses, a block of wood should be inserted in the magnet, solenoid, or mechanism to pre vent automatic or manual closing of breakers or contactors A separate record card should be main tained for each motor Space should be pro- 1002