To Distribution From J. C. Greene Date : June 3 1983 Subject ; VCH TANK FARM OPERATING MANUAL
Attached is the operating manual for the VCM tank farm. This manual has been revised to incorporate new equipment and procedures in the VCM tank farm area.
J. C. Greene Process Engineer bis Attachments
c: JF, CRM, PEM, CRS, LDH (7), MLN, VEM, VLT, AHS, DJM, RAF
A
VAB.0001134685
VCM UNLOADING OPERATING MANUAL ABERDEEN CHEMICAL PLANT ABERDEEN, MISSISSIPPI
JUNE 3, 1983
4
Revised By: . C Greene
Process Engineer
Approved B Yard Supervisor
Approved By: P. E. Markey Vinyl Operation Supt.
VAB.0001134686
II
VCM UNLOADING OPERATING MANUAL
ABERDEEN PVC PLANT
TABLE OF CONTENTS
| I. INTRODUCTION
!
Page No.
i
A. Operator Responsibilities ......................................................................... .... 1
B. General Process Description.........................................
3
II. OPERATING PROCEDURES
A. Railcar Hookup .................................................................................................................. . . 10
B. Unloading Railcars......................................................................................................................17
C. Recovering Vapor From Railcars.......................................................................................22
D. Unhooking Railcars .................................................................................................................. 24
E. Troubleshooting and Miscellaneous Operating Procedures
1. Liquid in the Compressor Suction.......................................................................29
2. High Pressure on the Sphere or Bullets (or Evacuation) ... 29
3. Evacuating a Compressor for Maintenance........................................................30
m
4. Lack of Liquid Flow in Sight Glass...................................................................33
5. Tank Car Excess Flow Valve Closing...................................................................34
6. Evacuating the VCM Vapor Line Knockout Pot and Recycle Pump for Maintenance......................................................................................................35
III. EQUIPMENT INDEX.....................................................................................................................................37
IV. SAFETY EQUIPMENT AND SYSTEMS.....................................................................................................40
V. EQUIPMENT ENTRY PROCEDURES ................................................................................................. 44
VI. APPENDIX
A. Valve Setup Checklist
B. Checklist for Testing Auto Valves
C. Empty Outbound VCM Tank Car Inspection Report
D. Plant Emergency Plan
E. Sample Railcar Placard
F. Photographs
G. P & I Diagram
A
VAB.0001134687
A
I. INTRODUCTION
VCM UNLOADING OPERATION MANUAL ABERDEEN PVC PLANT
A. Operator Responsibilities
The purpose of the VCM Tank Farm is to safely unload and store Vinyl
Chloride Monomer (VCM). VCM is brought into the plant in tankcars.
i
It is the main raw material used in making the plant's major product,
I
polyvinyl chloride (PVC). VCM is a colorless sweet-smelling gas at
atmospheric pressure that is stored and transferred as a liquid at
moderate pressure (30-70 psig).
The yard department is responsible for the offloading of VCM tankcars
and the related transfer equipment. The yard operator helps fulfill
j
! the tankfarm's purpose by making sure that the VCM is safely unloaded
I i
without endangering his fellow workers or equipment. The operator is
i
able to attain his goals in safety, job performance and efficient
operation through a training period, on-the-job experience, and passing
written and field examinations. The operator fulfills his responsi bilities by:
1. Demonstrating understanding of how his equipment functions.
2. Being able to explain what role each piece of equipment plays in the
3. Keeping a close and regular check on equipment.
4. Being able to demonstrate troubleshooting and corrective measures
5. Keeping his area of responsibility safe and clean.
.6 Keeping complete and accurate records.
7. Reporting equipment problems promptly and writing maintenance work orders as needed.
8. Operating the equipment in an environmentally sound manner and promptly taking corrective measures should process leaks occur.
9. Wearing the proper respiratory protection.
VAB.0001134688
VCM Unloading Operating Manual Page 2
I. INTRODUCTION (Cont.) A. Operator Responsibilites (Cont.) This operating manual will cover the normal responsibilities and duties of the yard operator when unloading VCM railcars. Each phase of the unloading procedure will be covered. In addition to normal operating procedures it will also discuss operations under abnormal conditions. The operator must be prepared to meet these situations with temporary measures until the abnormal condition is corrected or ceases to exist.
a
The goal for VCM overexposure to employees is "ZERO1'. This is accom plished by operating the equipment as designed, prompt attention given to leaks per continuous monitor sensors and follow up work orders for maintenance. As we meet our goals for overexposure, all governmental
i
J
guidelines will also be kept.
Safety takes second place to no plant activity. The safety of the plant personnel and equipment is to be carefully considered before any job is started. The Conoco safety slogan is "Our work is never so urgent or important that we cannot take time to do it safely". Safety on the job must be our first and most important consideration. When we do a good job of planning our work with safety in mind, we are less likely to suffer injury or cause an accident. This allows us to meet our plant goal of employees going home unhurt.
A
VAB.0001134689
h l* ij i
VCM Unloading Operating Manual Page 3
A
I. INTRODUCTION (Cont.)
B. General Process Description
VCM tankcars are brought into the plant from various VCM plants through
out the United States. Most of the VCM that comes into this plant comes
from Conoco's VCM Plant in Lake Charles, Louisiana. VCM also occa
sionally comes from PPG in Lake Charles, B. F. Goodrich in Calvert City,
Kentucky, Uniroyal in Geismar, Louisiana, or from Shell Norce Georgia
Pacific, Plaquemine.
VCM
(about 23,000 gallons of liquid).
VCM
car's gross weight is less than 255,000 pounds, the car must be reweighed
and spotted on the west track until billing weights are verified. This
insures we receive what has been billed to the Aberdeen Plant. The
cars are shipped to Aberdeen and stored on the Monroe lead until they are
VCM
VCM railcars. This is a safety precaution so that all the VCM
cars are kept in one general area. The railroad crew is responsible for
bringing the VCM cars into the plant and "spotting" them at the VCM
transfer stations that are on the platform at the VCM tank farm. This
usually done once per day except on weekends or holidays.
maximum
has eight transfer (unloading) spots.
farm platform
farm
two sets of railroad tracks such that there are four transfer spots on
These
1, Spot No. 2, Spot
No. 3, and Spot No. 4, from south to north (east side); and Spot No. 6,
Spot No. 7, Spot No. 8, and Spot No. 9, from south to north (west side).
Spot No. 5 (east side of platform) and Spot No. 10 (west side of plat
form) are the two north locations for "spotting" tankcars, but there are
no unloading facilities at these two spots. Once the railcars have been
m
"spotted", it is the yard department's responsibility to unload the VTJM
0001134690
T
I
i
Unloading Operating Manual age 4
L INTRODUCTION (Cont.)
B. General Process Description (Cont.) into T-601 which is commonly called the "sphere". This is done using the five Corken compressors at the tank farm. They are commonly referred to as Compressor No. 1, Compressor No. 2, Compressor No.3, Compressor No. 4, and Compressor No. 5, from north to south, respectively. Compressors No. 3 and No. 5 combined have about the same capacity as either Compressor No. I, No. 2, or No. 4. The tankcars are connected to the compressor piping and the sphere piping with flexible hoses. The compressors pull
vapor from the top of the sphere and compress it into the tankcars, forcing liquid out of the cars through a stand pipe, into the bottom of
p
the sphere.
A
Each tankcar has three valved connections in the dome of the car (two liquid lines and one vapor line). The liquid lines are 2" lines and point toward each end of the tankcar. The vapor line is a IV* line and points toward the side of the car. Refer to the photograph in the Appendix. Only one liquid line is usually hooked up on a car because the car does not unload significantly faster with two lines and it takes longer to hook up the car. Both liquid lines have to be hooked up on some type of cars (ACFX and PPGX cars) because the excess flow valves are set to close at lower rates than our normal unloading rate of 65-95 gpm.
The operator can tell when all the liquid has been unloaded from a car by watching the sight glass in the liquid transfer line. When the tankcar has been emptied, the 4-way valves on the compressor are reversed such that the compressor evacuates vapor from the car and discharges it into the top of the sphere. When the specified amount of vapor is removed from the tankcar, the compressors are shut down and the transfer lines
VAB.0001134691
fCM Unloading Operating Manual page 5
j
I. INTRODUCTION (Cont.) B. General Process Description (Cont.)
;
are evacuated. This must be done because of EPA (Environmental Protec tion Agency) regulations concerning the release of VCM vapor to the atmosphere. Then the transfer line can be unhooked and the cars are sent back to the respective VCM plant for reloading.
All outbound VCM cars are to be weighed. Cars containing a heel greater than 600 pounds should be set aside for additional unloading. The plant can lose considerable amounts of VCM on heavy outbound cars, which can drastically impact on our plant's cost effectiveness.
summer farm. The primary reason is probably because the vessels are uninsulated and the transfer lines are lengthy and are exposed to ambient tempera tures along their entire run. The vapor pressure drops in the vessels and the tankcars as the temperature drops, making it harder to unload in cold weather because there is less VCM pressure to move the liquid
vary night and when rapid changes in weather occur.
During the summer, eight tankcars can be hooked up at one time and unloaded with four or five compressors. Also, the tankcars will usually start unloading as soon as the valves on the liquid lines are opened. During winter conditions (ambient temperature approximately 40F or less), it is harder to start the VCM liquid unloading and only four tankcars can be unloaded at a time, with four or five compressors. If the weather gets extremely cold, it may take four compressors to unload only two or even one car, but this has not happened since the
VAB.0001134692
Unloading Operating Manual Page 6
INTRODUCTION (Cont.) B. General Process Description (Cont.)
system has been revised and vapor from the sphere is used. The volume of VCM kept in the sphere is usually large enough that sufficient vapor is
i
; :
available for the compressors. When the bullets were used, there was not enough vapor available and the tankcars unloaded very, very slowly, if at all.
Other equipment at the tank farm includes the bullets, T-201 (west) and T-202 (east). These are not used for unloading VCM, even though each one presently contains a small amount of liquid VCM. They are piped up to
i i
take inerts from the recovered vinyl receivers if the incinerator should be down for an extended period of time.
The transfer pumps on the bullets (Conoco Nos. 72-211 & 72-218) and the sphere (Conoco Nos. 72-217 & 72-270) are the responsibility of the vinyl department. The sphere transfer pumps send liquid VCM through a A" line to the old and new reactor modules where it is charged into reactors and made into PVC. The bullet transfer pumps are not used at the present time.
The emission recovery system knockout pot is also located at the tank farm, northwest of the compressor shed. The emission recovery system is located in the vinyl department old reactor module and is designed to collect and contain miscellaneous VCM emissions. It runs continuously. The knockout pot is connected to it via a 2'* line that runs to the tank farm. A 15" Hg. vacuum should be maintained on this line at all times. This line is used to evacuate the VCM vapors from the transfer lines prior to unhooking cars. The knockout pot is the responsibility of the
VAB.0001134693
VCM Unloading Operating Manual Page 7
I. INTRODUCTION (Cont.) B. General Process Description (Cont.) vinyl department, but the yard operator should be familiar with the purpose of it*
The knockout pot collects VCM vents from the following: a. Double Mechanical Seals on the sphere and bullets transfer pumps--
Used by vinyl to bleed VCM from the seals when maintenance is required on the pumps. b. Corken Compressor Packings- The pot recovers vapor that leaks through the compressor packing into the distance piece. The vapor goes through a rotameter on each compressor into the pot. The valve above the rotameter should always be open when the compressor is running. The knockout pot must always have a slightly positive pressure on it or oil can be sucked out of the bottom of the compressors through the packing around the piston rods. This is the reason for the back pressure control valve on the knockout pot. c. Corken Compressor Relief Valve Discharges- The relief valve dis charges are piped to the knockout pot through a locked open valve. d. Corken Compressor Liquid Traps- Liquid caught in the traps is drained to the knockout pot through the 1" Jamesbury valves on the traps. Opening the 1" valve should let the liquid flow into the knockout 'pot and then it is recovered to the emission recovery system. e. VCM Sphere and Bullet Recovery- The vessels can be recovered through the knockout pot. A procedure will be given for this in the opera ting procedures section. f. Sphere Liquid Lines Relief Valve Discharges- The three liquid lines
VAB.0001134694
VCM Unloading Operating Manual Page 8
INTRODUCTION (Cont.)
B. General Process Description (Cont.)
under the sphere have relief valves that discharge into a 1" line
i
that goes to the knockout pot. The 1" valve on the line south of the
i
compressor shed is locked open. The line runs into the header at the
west side of the knockout pot, where the main 2" valve is also locked
open.
I*
!
i I i j\
|| g. Compressor No. 1 Liquid Line Relief Valve Discharge- This relief ii
i; ii 4
valve is piped up to the compressor relief valve header through a
i: :
locked open valve.
h. Vapor Line Knockout Pot Relief Valve Discharge- This knockout pot is
i
equipped with a relief valve whose discharge is piped through a
locked open valve into the compressor relief valve header. The
compressor relief valve header is connected to the emission recovery
system knockout pot.
i. VCM Recycle Pump Relief Valve Discharge-- The VCM recycle pump located
below the liquid line knockout pot is equipped with a relief valve
which is piped up to the compressor relief valve header.
A second knockout pot, called the vapor line knockout pot, is located
just north of the emission recovery system knockout pot. The purpose
of the vapor line knockout pot is to collect liquid VCM that may have
collected in the main vapor line and prevent this liquid from slugging
the compressors. A VCM recycle pump is located below this knockout pot
and is used to pump the contents of the pot to the sphere. The pump
is started and stopped by two level switches in the pot.
A
VAB.0001134695
I
VCM Unloading Operating Manual Page 9
I. INTRODUCTION (Cont.) B. General Process Description (Cont.) Complete and accurate records must be kept on VCM unloading. These are necessary for accounting purposes and for communication between shifts. A VCM Unloading Card must be filled out and turned in to the accounting group for each car unloaded. Records are also kept in the yard scale-house on which cars were unloaded, when they started, when they were put on vapor, and when they were unhooked. A valve setup checklist also must be filled out by the yard opera tor when hooking up cars and starting unloading. Copies are to be kept on file by the yard supervisor. A copy of the checklist is included in the Appendix. Also Included is a copy of the empty outbound VCM tank car inspection report.
The automatic valves under the sphere are tested every Wednesday morning. The checklist used to record the results of this testing is shown in the Appendix. Copies of this checklist are to be kept on file by the yard supervisor. This testing must be coordinated with the vinyl panel operators so that the valves are not closed during VCM transfer to the reactor units. This should be coordinated by using the radios.
/
4
VAB.0001134696
VCM Unloading Operating Manual Page 10
II. OPERATING PROCEDURES A. Railcar Hookup After VCM cars are brought into the plant, the yard operator "hooks up" each car by connecting transfer hoses to it. Vapor can then be trans ported into the car and the liquid VCM can be sent into the sphere. In the summer, two cars can be hooked up at each transfer station for unloading. During winter operation or when a rapid change in the weather is anticipated during unloading, only one car can be unloaded from each transfer station.
Fresh air masks must be worn under the compressor shed, while opening or closing the railcar dome, or while connecting and disconnecting the transfer hoses. Gloves must be worn while handling the nipples and the transfer hoses. VCM cars are not to be hooked up during an electrical storm. Equipment Required 1. Fresh Air Mask 2. 1 1/2" Teflon Tape 3. 0-rings for Weco fittings (if needed) 4 Gloves Procedure 1. Get a fresh air mask and a roll of 1 1/2" Teflon tape, from the yard
scale house. Also get "0" rings that are needed to replace the ones at the tank farm. Inspect the "0" rings individually for cracks and nicks. Do Not Use Defective "0" Rings.
11 i I |J 11 >H NI > NHi-l-H I 11 i l :i4H li i. I.......
VAB.0001134697
i. I........... I : 11 i. I Mi I
wwwwJiwmih.nH..
VCM Unloading Operating Manual Page 11
II. OPERATING PROCEDURES (Cont.) A. Railcar Hookup (Cont.) Procedure (Cont.) 2. Raise the blue metal flag located on the railroad track south of the roadway. This flag states "Stop! Tankcar Connected." This procedure is necessary to isolate the eight unloading stations and notify railroad personnel that VCM unloading is taking place. 3. Engage the derailer located near the blue flag. This will prevent railcars from entering the tank farm area when unloading is taking place. 4. Visually check the valves under the sphere to make sure they are set up for unloading. The 4" valve on the vapor line and the 6" valve under the sphere on the liquid line to the sphere must be open (both valves are actuated valves). 5. Record the sphere level on the checklist (see checklist in Appen dix) . Turn the handle on the gauge to move the tape, then take the reading. If the tape does not bounce, notify the yard supervisor. The maximum allowable sphere level is 38 feet. To unload 4 tankcars the level must be below 32 feet - 3 inches (27 feet -- 0 inches for 8 tankcars). 6. Check the railcar chocks and handbrake and ground the railcar. Make sure that the chocks are in good condition and are against the railcar wheels. Manually check the handbrake to make sure it is tight.
Inspect the grounding cables to ensure that they are intact and in good working condition. Bond each car to the ground rod by attach ing the grounding clamp to the north side of the vertical siderail of the ladder. This prevents static accumulation during unloading
VAB.0001134698
4-i 11111
VCM Unloading Operating Manual Page 12
H. OPERATING PROCEDURES (Cont.)
A. Railcar Hookup (Cont.)
Procedure (Cont.)
6. (Continued)
and eliminates dangerous sparking which could ignite any VCM leaks
It also prevents loss of the ground clamp if it is left connected
during switching
damaged
arms
except Spots No. 4 and No. 9 which have no backup cables.
7 Drain the water from the breathing air filter if necessary (The
filter is located between the rail tracks).
8 Climb the stairs to the unloading platform. If the stairs are wet
or icy, be especially careful. Always be sure to use the handrail.
9 Go to the station you want to unload from, loosen the locks on the
walkramp, and use your foot to push the ramp onto the car dome.
The ramp will not operate if it is not in the middle of the
platform opening. Adjust the height and length of the ramp and
lock the ramp into place. Watch for pinch points when positioning
the ramp and do not put any unnecessary strain on your back.
10 Unlatch the vapor and liquid line(s) and swing each line over the
railcar dome area. Be careful not to let the lines swing back and
catch your arm or hands. (The vapor line is the lVf line).
11 Remove the nipples from the holders and peel off the old Teflon
tape. Inspect the threads and retape them with new tape up to 2"
from the end of the threads.
worn
order to replace the old nipples with new ones.
A
VAB.0001134699
VCM Unloading Operating Manual Page 13
A
II. OPERATING PROCEDURES (Cont.)
Railcar Hookup (Cont.)
Procedure (Cont.)
12. Remove the pipewrench from the holder and fasten it on one nipple
Then carry the pipewrench and nipples to the dome area of the car
li Be careful not to drop the nipple and damage the threads.
13. Put on the fresh air tpask and tighten it. Test the face seal by
blocking the hose with one hand while trying to breathe in If
it leaks, adjust the straps or facepiece. Make sure you have a
good face seal.
Purge the air line of any water that may be in the line. Connect
the fresh air mask to the fresh air hose that is on the transfer
line booms.
13. Break the domelid seal with the pipewrench and slide the latching
bar so that the lid can be raised. Open the domelid and push it
all the way back so that it cannot close. Be careful to use proper
lifting procedures when raising the lid. i 16. Visually check inside the dome area for leaks. Leaks will be
indicated by condensation or icing around the valves and fittings.
Check the plugs and caps and attached chains - if any are missing*
note on the checklist.
17. Test the valves to make sure they are closed by pushing the valve
handles against the closed stop.
18. Select the correct size wrench to fit the railcar valve plugs and
remove the plugs. Be alert to the fact that the wrench could slip
and trap your hand or fingers against the dome. Also do not stand
in the direction of the valve opening in case a valve is leaking
and VCM spews out.
VAB.0001134700
VCM Unloading Operating Manual Page 14
A
II. OPERATING PROCEDURES (Cont.) A. Railcar Hookup (Cont.) Procedure (Cont.) 19. Push the port hole covers aside and screw the nipples into the valve opening until they are hand tight. Then tighten the nipples with the pipewrench. Be careful not to let the wrench slip. The nipples must be very tight or they will leak. Double check them after installing. 20. Close the vacuum breaking valves on the end of the transfer line booms. Make sure they are fully closed so that VCM will not leak to the atmosphere. 21. Unhook the flexlines and or Weco fittings from the holders on the booms. Be careful to minimize bending and twisting the flexlines during hookup. Excessive bending of the flexlines causes early failure of the lines. Visually inspect the flexlines for small holes or extremely worn areas of the armored weave. If a flexline is punctured, badly twisted or damaged, or in your judgment has a likely potential for failure during operation, contact maintenance and have the hose replaced. 22. Inspect the "O" rings individually and install them in the slots. The 110" ring must be evenly seated to prevent leaks. "O'* rings with cuts or nicks should be discarded. 23. Press the Weco union attached to the flex hose against the nipple inserted in the railcar. Check the alignment of the "0M rings to make sure there is a good seal. ,,0n rings that are pinched or crooked will cause leaks. Completely tighten the Weco hammerlock to prevent leakage.
VAB.0001134701
VCM Unloading Operating Manual Page 15
II. OPERATING PROCEDURES (Cont.) A. Railcar Hookup (Cont.) Procedure (Cont.) 24. Check to make sure that the valve on the transfer line closest to the railcar dome is closed (it should be closed from the previous unhooking). Slowly pull the handle of each railcar valve up to open it. Opening the valves too fast can cause an undesirable surge of pressure. Check for leaks around each coupling and vacuum breaking valve as the railcar valves are opened. 25. Slowly open the liquid valve(s) on the end of the booms. Then open the vapor valve at the end of the boom. Make sure that the valves are fully opened or flow will be restricted. 26. Recheck the valves on each transfer line to make sure they are open. The railcar dome valve and both tranfer line valves must be open. The vacuum breaking valve must be closed. Initial the checklist to show that the valves are open. 27. Inspect the flex hose for leaks. Contact maintenance to replace any leaking flex hoses. (Note: The line must be disconnected using proper procedures prior to replacing. The procedure is on page 24 - "Unhooking Railcars"). 28. Disconnect the fresh air mask and check the pressure gauges at the platform on the vapor and liquid lines and make sure that they are showing pressure. Lack of pressure may indicate a leak, a plug or a closed valve. 29. Hookup additional railcars using steps 9-27.
A
VAB.0001134702 t
VCM Unloading Operating Manual Page 16
II. OPERATING PROCEDURES (Cont.) B. Unloading Railcars After the VCM cars at the tank farm are hooked up, the cars are unload ed using the Corken compressors. The compressors take vapor from the top of the sphere and compress it into the tank cars, forcing the liquid in the cars to flow into the bottom of the sphere. It usually takes 4-6 hours to unload the liquid VCM from a tankcar.
h .. *
It is very important for the valves on the compressors to be set up correctly or the compressor will dead-head. Running the compressors in a dead-headed condition will raise the compressors' relief valves and force VCM into the emission recovery knockout pot T-201. A pressure switch on T-201 will shut down all compressors if the pressure in the pot reaches 70 psig. Equipment Required 1. Fresh Air Mask. Procedure 1. After hooking up the cars, carefully come down the stairs from the
unloading platform, using the handrails. Check the valves that are between the railroad tracks going to each unloading station, which is to be used for unloading cars. All the valves should normally be open. Initial the checklist if the valves are open. If any of the valves are closed, do not startup any compressors going to that unloading station. 2. Go to the compressor shed and put on the fresh air mask, check for face seal, and connect it to the fresh air hose.
A
VAB.0001134703
I
VCM Unloading Operating Manual Page 17
n. OPERATING PROCEDURES (Cont.)
B. Unloading Railcars (Cont.) Procedure (Cont.) 3. Open the main liquid valve on the west side of the compressor shed on the sphere liquid line (it should have been closed prior
r
to unhooking previous cars). Initial the checklist appropriately after opening the valve. 4. Visually inspect each liquid unloading line from where they come out of the ground on the east side of the compressor shed through the valves near the ground, through the sight glasses, across the compressor shed, and through the valves above the liquid header on the west side of the shed. All valves must be open from each spot being unloaded from. During summer operations, flow may be observed in the sight glass after opening the main liquid valve. This is due to the vapor pressure in the car forcing liquid to start unloading. Initial the checklist after making sure that the valves are open (Checklist Item: Valves Under Sight Glasses, etc.). 5. Open the main vapor valve at the west side of the compressor shed on the sphere vapor line (it should have been closed prior to unhook ing previous cars). Initial the checklist appropriately after opening the valve. 6. Open the vapor line knockout pot inlet and outlet valves to allow vapor to flow through the knockout pot. These valves are located near the main vapor valve. Close the vapor header block valve located between the knockout pot inlet and outlet valves. 7. Visually trace the vapor lines going from the sphere vapor line, through the manual valves to the 4-way valve on each compressor. The manual valve must be open for each compressor that will be run.
A
VAB.0001134704
I
VCM Unloading Operating Manual Page 18
II. OPERATING PROCEDURES (Cont.)
B. Unloading Railcars (Cont.) Procedure (Cont.)
i
Initial the checklist after checking the vapor valve for each com
pressor.
8. Check the level of the VCM in the vapor line knockout pot by observing
the sight glass located on the east side of the pot. The level
should be below the pot*s high level switch before unloading is started.
The level in the pot is automatically controlled by high and low level
switches. Should the instruments malfunction and the level be above
the high level switch, notify the yard supervisor and proceed to drain
the pot manually. Do this by placing the VCM recycle pump switch in the
"hand" position. This switch is located on a panel on the south side
of the knockout pot. The recycle pump will pump the contents of the
pot to the sphere. When the level in the pot has lowered to the low
level switch, place the pump switch back in the "auto" position.
9. Turn the handle of each 4--way valve so that the handle is in the
vertical position. This sets up the compressor to pull from the
sphere and discharge into the tank cars. (NOTE: The handles can be
installed in the opposite direction. If maintenance works on a 4-way
valve, check the arrows on the valve and make sure the flow is from
the sphere to the tankcars when the valve handle is vertical. This must
be checked before signing off the work order.)
10. Check the suction pressure of each compressor. It should read the same
as the sphere pressure. If the pressure is 0 psig, the liquid trap may
be full of liquid which closes the high level shutoff valve in the trap
and will not allow any flow to the compressor. The trap can be drained
VAB.0001134705
7CM Unloading Operating Manual Page 19
II. OPERATING PROCEDURES (Cont.) B. Unloading Railcars (Con.t) Procedure (Cont.) by opening the Jamesbury valve that goes to the emission recovery knockout pot by the compressor shed. When the liquid is drained off, the pressure will rise on the suction (as the shutoff valve opens). When this occurs, close the Jamesbury valve. 11. When the suction of each compressor is set up correctly, visually trace the vapor discharge lines for each compressor. When all of the compressors are to be run. Compressors No. 3 and No. 5 should dis charge to the No. 3 transfer station. Compressor No. 2 should dis charge to No. 2 transfer station, Compressor No. A should discharge to the No. 4 transfer station, and Compressor No. 1 should discharge to the No. 1 transfer station. When one or more compressors are not to be run, or if fewer than four railcars are to be unloaded, it is best to setup the compressors on common discharge by opening the four valves on the No. 5 compressor header. This allows all the compres sors to be set up on one common header. Check the valves on the line from the No. 5 compressor to made sure they are set up correctly and be sure to check the jumper lines that connect the lines going to the four spots. Finally, check the four vapor valves near the ground going to the four transfer stations. The valve to each transfer station that is to be unloaded from must be open. Initial the checklist after making sure the appropriate valves are open. 12. When all the lines have been traced for each compressor, push the start buttons for the compressors to be run. 13. Check the oil pressure on each compressor. It must read between 10-20 psig.
A
VAB.0001134706
II. OPERATING PROCEDURES (Cont.) B. Unloading Railcars (Cont.) Procedure (Cont.) 14 Check the discharge pressure on each compressor. If it is under 100 psig, go to the sight glasses and watch for liquid flow. If the discharge pressure is above 110 psig, one of the valves
. i between the compressor and the tank car is closed. Shut off the compressor and retrace the piping until the valve is opened
15 Check for liquid flow to the sphere in all the sight glasses Lack may
sphere. 16 Check to see that the Jamesbury valves on the compressor suction
liquid traps are closed. 17 Take off the fresh air mask, disconnect it, and roll up the hose 18 Record the identification numbers of the railcars being unloaded
and log into log book.
VAB.0001134707
JJ-. y -JiiJini
VCM Unloading Operating Manual Page 21
II. OPERATING PROCEDURES (Cont.) C. Recovering Vapor from Railcars When the liquid VCM has been unloaded from the VCM tank cars, the Corken compressors are used to remove most of the remaining VCM vapor from the car. The compressor is set up to take vapor from the tank car and send it back to the sphere. The railcars are pulled down to about 6-8 psig. If they are recovered to less than 6 psig it causes problems at the VCM plants, because the car may be below atmospheric pressure and pull air into the car. If the cars are not recovered to less than 8 psig, we are charged for some of the VCM which is left in the car. It normally takes 1-2 hours to recover vapor from the railcars. Equipment Required 1. Fresh Air Mask. Procedure 1. Go to the tank farm and check the sight glasses to make sure the
Il
d
liquid has blown out of the railcars. NOTE: If one of the cars blows out before the others, hook up and put on the fresh air mask and open the four valves from the No. 5 compressor header (this sets up all the compressors on one common header) Then close the valve near the ground on the vapor transfer line at the east side of the compressor shed for the transfer station which has blown out. This will cause the cars that have not blown out to empty faster. After the cars have blown out, be sure to reopen any valves on the vapor transfer lines that were closed. If there are 2 cars hooked up on any of the transfer stations, both cars will have to be checked to see if they have blown out. Use the follow ing procedure: (Assume that railcar A and railcar B are hooked up
A
VAB.0001134708
VCM Unloading Operating Manual Page 22
! II. OPERATING PROCEDURES (Cont.)
i |
C. Recovering Vapor From Railcars (Cont.) Procedure (Cont.) on the same transfer station and that the sight glass for that transfer station shows vapor flow).
ii
A. Go to the dome of railcar A and close the liquid valve(s). This allows you to check the sight glass and see if the liquid has blown out of railcar B.
B. Go to the sight glass and check for liquid blowing through the line. If liquid flow shows in the sight glass, railcar B has not blown out. Finish unloading it by closing the vapor valve on railcar A.
C. When the sight glass shows that railcar B has blown out, go back to the platform and open the liquid and vapor valve(s) on railcar A.
D. Next, close the liquid valve(s) on railcar B to make sure that railcar A has blown out.
it
3:
E. Check the sight glass as in step B (Above). If liquid flow shows in the sight glass, railcar A was not blown out and must be unloaded. Close the vapor valve on railcar B.
F. When the sight glass shows that railcar A has blown out, re-open the liquid and vapor valve(s) on railcar B.
!
G. After all the cars have blown out, reopen any valve that you closed to check or unload the railcars.
2. Put on the fresh air mask, check for face seal, and connect it to the fresh air hose.
1
VAB.0001134709
VCM Unloading Operating Manual Page 23
II. OPERATING PROCEDURES (Cont.)
Recovering Vapor from Railcars (Cont,)
Procedure (Cont.)
3. Open the four valves on the No. 5 compressor header so that all the
compressors are on one comon header.
Reverse all the 4-way valves so that the handles are in the horizon tal position.
Close all liquid line valves located beneath the sight
the ground level.
Check the compressor discharge pressures to make sure the compres
sors are not dead headed (pressure should be 70--100 psig).
Take off the fresh air mask, disconnect it and roll up the hose.
Record in the logbook the time that the cars were put on vapor.
Unhooking Railcars
When the VCM railcars
farm
to the specified
, the compressors will be automatically shut
off by the low
switches. Before the cars can be unhooked, the
VCM
h
feet of VCM vapor (at 20 C and 29.92 in. Hg) to comply with EPA regula
tions. To meet this requirement, the lines must be evacuated to a
10M Hg vacuum. Then the lines can be unhooked and the cars can be sent
out of the plant.
masks must be worn
necting the
hoses. Gloves must be worn while handling the
nipples and the
hoses. VCM cars are not to be unhooked during
an electrical storm.
ment Required
Fresh Air Mask Gloves
VAB.0001134710
I
I. ...............................................
:. 11.........................
I
VCM Unloading Operating Manual Page 24
A
II. OPERATING PROCEDURES (Cont.)
D. Unhooking Railcars (Cont)
Procedure
farm and climb the platform
Be especially
careful if the stairs are wet or icy and be sure to use the hand rail.
2 Check the pressure on each transfer station according to the gauges
on the platform. Make sure that the car(s) at each transfer statio
have been pulled down to 6-8 psig.
NOTE: If one of the transfer stations has reached the proper evacu
ation pressure before the others, close the valves at the platform
for that transfer station. Since the compressors are on one common
header, this will allow the other transfer station(s) to evacuate
When
ated, reopen the valves on the transfer lines which you closed.
3 Climb down from the platform (carefully). Go to the compressor
shed and put on the fresh air mask, check for face seal, and then
connect it to the fresh air hose.
4 Turn off the compressors.
5 Close the 4" main vapor valve from the sphere and the 6" main liquid
valve to the sphere that are on the west side of the compressor shed.
6 Check the pressure gauge on the line to the emission recovery
system. (Gauge is at the southwest comer of compressor shed.) It
must read at least 10" Hg vacuum.
manual
evacuate the transfer lines to the emission recovery system.
NOTE: If there is not at least 10" Hg vacuum on the line, notify
the vinyl control room. It is the vinyl department's responsibility
to maintain at least 10" Hg vacuum on the line.
VAB.0001134711
VCM Unloading Operating Manual Page 25
II. OPERATING PROCEDURES (Cont.) D. Unhooking Railcars (Con.t) Procedure (Cont.) 7. Immediately after opening the four manual evacuation valves, care fully climb the stairs to the unloading platform, hook up and put on the fresh air mask, check for face seal, and connect it to the fresh air hose. Close the valves in the railcar dome on each car that was unloaded (you will have to unhook and reconnect the fresh air mask at each station). 8. Open the actuated valves that evacuate the transfer lines to the emission recovery system by opening the switch at each transfer station. (Write work orders for any valves that do not open or close correctly.) 9. When the pressure gauge at the transfer station reads 10" Hg vacuum or less, put on the fresh air mask and close the valve on the trans fer line that is closest to the railcar dome. The pressure gauges should be maintained in good working condition or be replaced. The stainless steel flex hose is now valved off at 10" Hg vacuum or less, which complies with EPA regulations.
10. Open the h" vacuum breaking valve at the end of the transfer
line boom. 11. Disconnect the Weco hammerlock coupling. 12. Inspect the "0" ring on the Weco coupling nipple. Discard it if it
has any nicks or cracks on it. Close the vacuum breaking valve. 13. Connect the transfer line to the boom and swing it out of the way. 14. Unscrew the nipples from the railcar valve opening with the pipe-
wrench. Remove them from the dome and cover the portholes.
A
VAB.0001134712
VCM Unloading Operating Manual Page 26
II. OPERATING PROCEDURES (Cont.) D. Unhooking Railcars (Cont.) Procedure (Cont.) Be careful not to let the pipewrench slip and trap your hands or fingers against the railcar. 15. Select the correct size wrench to fit the railcar valve plugs and screw them tightly into the valve opening. Once again, do not let the wrench slip while tightening the plugs. All the plugs must be in place tight and have chain attached. 16. Put the nipples, pipewrench and wrench on the transfer station walk ramp and close the railcar dome lid. Be careful not to let the lid trap your hands or fingers. Slide the latching bar shut to hold the lid closed. Seal lid and record the lid seal number on the checklist. 17. Unhook the fresh air mask and take the pipewrench, nipples, and wrench back to the main platform. Place them in the racks provided for them. Be careful not to drop the nipples or damage the threads 18. Turn off the switch to close the actuated valves that evacuate the transfer lines to the emission recovery system. 19. Latch the transfer line booms to the platform. Be careful not to let them pinch your arms or hands. Do not bend or twist the flex lines excessively. This can cause early failure of the flexlines. 20. Loosen the locks on the walk ramp and pull it away from the tank car. Lock it after raising it into the vertical position
21. Repeat steps 9-20 to unhook the other railcars.
i . . h
A\\
VAB.0001134713
i . .11 ' .........................
......................-l | ................................ .1111 . u u 11., 11
......... i..nl. .......................... ;1 4-:11;: 1.
ill Nil mil Mil*
j
VCM Unloading Operating Manual Page 27
II. OPERATING PROCEDURES (Cont.) D. Unhooking Railcars (Cont.) Procedure (Cont.)
22. After unhooking all the railcars, climb down the steps from the
platform. Do Not leave the fresh air mask on the platform. Take it back to the yard scale house with you and place it in the proper receptacle for cleaning at the end of your shift.
rm a
23. Unhook the ground cable from the unloading station. 24. Turn the placards on the railcar over so that they read "Empty."
These placards must be present on both sides and both ends of each
car. The placards must be right side up and all must be in place before car leaves the plant. A sample of the railcar placards is attached in this manual.
25. Close the manual valves on the 1" lines from the VCM transfer lines to the emission recovery header (under northeast corner of compres sor shed) Also close the 2" emission recovery valve located over head at the southwest comer of the compressor shed. These must be manually blocked in to prevent air or VCM leaks into the emission recovery system and to prevent VCM leakage through the automatic valves during railcar unloading.
j
i i
26. Lower the blue flag to show that tank cars are no longer connected. 27. Disengage the derailer located south of the roadway.
28. Go to the sphere and record the level. Record this level and other
information about unhooking the car in the logbooks in the yard scalehouse.
A
VAB.0001134714
VGM Unloading Operating Manual Page 28
II. OPERATING PROCEDURES (Cont.) E. Troubleshooting and Miscellaneous Operating Procedures This section describes various problems that occasionally occur in con nection with the Corken compressors and unloading the VCM tank cars. The standard operating procedure for solving each problem is given after the problem description. Normal rules concerning the use of safety equipment apply in all of these situations. Fresh air masks must be worn under the compressor shed. 1 Liquid in the Compressor Suction The symptoms of this problem and the solution are given in the operating procedures on unloading railcars, step No. 8. 2. High Pressure on the Sphere or Bullets (or Evacuation) Occasionally, the pressure on the bullets or the sphere needs to be reduced. This can be done by opening the appropriate valves and letting the emission recovery system pull on the vessel(s). A. To pull vapor from the sphere: a. Close the five valves on the west side of the compressor shed that are on the sphere vapor line. b. Open the main 4" valve on the sphere vapor line. c. Open the valve on the bullets vapor line that connects to the sphere vapor line. d. Open the 2M valve on the line that connects the bullets vapor line to the emission recovery knockout pot at the northwest corner of the compressor shed. This is the same line that the compressor relief valves discharge into. The knockout pot is set up to relieve any pressure over 3 psig to the emission recovery system.
A
VAB.0001134715
H
I
VCM Unloading Operating Manual Page 29
I IB i
OPERATING PROCEDURES (Cont.)
Troubleshooting and Miscellaneous Operating Procedures (Cont.)
:!l
2. High Pressure on the Sphere or Bullets (or Evacuation) (Cont.)
B. To pull vapor from the bullets:
a. Open the valves at the bullets on the line that goes to
the sphere vapor line from the bullets*
Follow step (d) in the procedure for pulling vapor from the
sphere.
C. To evacuate the sphere or bullets:
Considerable planning and preparation must be done prior to
attempting this procedure. However, the following concept
should be utilized.
a. Follow the above procedure for pulling vapor from the appro
priate vessel.
manual
pressor distance pieces to the emission recovery knockout
from
compressors when the knockout pot is pulled to below atmos
pheric pressure.
c. Open the bypass valve for the pressure control valve that
is south of the knockout pot. This will allow the vessel
being evacuated to be pulled below 3 psig using the exist
ing piping.
Evacuating a Compressor for Maintenance
Before taking a compressor down for maintenance, the lines to and
from the compressor must be isolated and the VCM vapors removed
(down to below 0 psig). This can be done by using the emission
recovery system. When using the emission recovery system.
VAB.0001134716
4 -k-
* MW
VCM Unloading Operating Manual Page 30
H. OPERATING PROCEDURES (Cont.) E. Troubleshooting and Miscellaneous Operating Procedures (Cont,) 3. Evacuating a Compressor for Maintenance (Cont.) Compressor No. 5 must be evacuated by a different procedure than the other compressors. a. Using the emission recovery system: NOTE: Not for Compressor No. 5.
(1) Close the 3" valve coming off the sphere vapor line for the
9
compressor to be evacuated. Tag the valve with a "Do Not Operate*' tag. (2) Close and tag the 3" valves on the east side of the compres sor shed that are on the transfer lines coming from the compressor that is to be evacuated. The valves on the transfer line and the valve from Compressor No. 5 must be closed and tagged. (3) Close and tag the valve on the compressor liquid trap and the valve above the rotameter. (4) Open the 1" manual valve that will evacuate the blocked off lines to the emission recovery system. (5) Open the actuated valve that evacuates the line to the emission recovery system. On some of the valves this can be done by overriding the valve and blocking off the air. On the ones without overrides, block the air off on the valve to the liquid line (to keep it closed) and open the vapor valve by using the switch at the transfer stations (on the platform).
VAB.0001134717
VCM Unloading Operating Manual Page 31
II. OPERATING PROCEDURES (Cont.)
Troubleshooting and Miscellaneous Operating Procedres (Con.t)
Evacuatin
Compressor for Maintenance (Cont.)
When
sor, close the actuated and manual 1M valves on the line
that the
to the emission recovery system. Be sure to open valve for the actuated valve on the liquid line if
it was closed in step (5).
(7) Close the air to the actuated valve on the vapor line
and tag it. The compressor should now be ready for
maintenance. (Make sure maintnenace blinds all the lines
when working on a compressor).
b. Using the emission recovery system for Compressor No. 5:
NOTE: One of the other compressors must also be evacuated
because the emission recovery system valves tie in only to
the four transfer lines dwonstream of the Compressor No. 5
block valve.
(1) Same as step (1) in (a) above.
(2) Close one of the 3" valves on the vapor station transfer
lines at the east side of the compressor shed. Open the
valve on that line from the Compressor No. 5. Leave the
Compressor No. 5 block valve open. Close the 3" valve
that comes off of the sphere vapor line on the west side
of the compressor shed that will isolate the compressor
that discharges to the transfer line which was blocked off.
(3) Same as step (3) in (a) above.
VAB.0001134718
I
?CM Unloading Operating Manual Page 32i - i-
i i OPERATING PROCEDURES (Cont.)
E. Troubleshooting and Miscellaneous Operating Procedures (Cont.)
Maintenance
(4) Same as step (4) in (a) above.
(5) Same as step (5) in (a) above.
(6) When the pressure reaches less than 0 psig on Compressor
No. 5, block off the Compres
No. 5 block valve on the
east side of the compressor shed and tag it
(7) Close the actuated valve that was opened in
(5) and
reopen any air that was blocked off.
(8) Open the blocked in 3M valves on the
and west
i. I of the compressor shed that were closed in step (2).
.!
maintenance
Lack of Liquid Flow in Sight Glass
Occasionally, there will be little or no liquid flow in one or
more of the liquid sight glasses after starting up the compres-
This may
by a lower pressure on one of the railcars, more pressure drop
in one of the lines due to length of pipe, or other reasons.
This problem only occurs occasionally and it usually happens in
only one of the transfer lines. If there is not a closed or
partially closed valve in the line, the problem usually corrects
itself after 5-10 minutes. To speed up this process, use the
following operating procedure.
a. First, trace all the lines and check the valves going to and from the transfer station that is giving the problem.
I,
Make sure that all the valves are fully open and that the
compressor discharge pressure is normal.
VAB.0001134719
i
VCM Unloading Operating Manual Page 33
II. OPERATING PROCEDURES (CONT.) E. Troubleshooting and Miscellaneous Operating Procedures (Cont.) 4. Lack of Liquid Flow in Sight Glass (Cont.) b. After making sure that all valves are open and pressures are normal, open the valves on the No. 5 compressor header to put all compressors on a common header (if these were not already open). c. Close the vapor transfer valve on the lines of one or more of the cars which are flowing normally. This will put more flow to the transfer station that is having trouble. d. After establishing normal flow in the sight glass that was giving problems (this usually takes only a minute or two), reopen the vapor transfer valves to the other transfer stations. Normal flow will usually be reestablished in the other transfer lines when the valves are reopened. e. Close any valves that you opened on the No. 5 compressor header 5 Tank Car Excess Flow Valve Closing Occasionally, the excess flow valve on a tank car will close. This is caused when the flow in the line exceeds a set flow rate. This condition can be detected either when the liquid valves are opened and a pinging noise is heard at the dome of the car or when the compressors are started and there is no liquid flow in the sight glass and all valves are open. Usually there will be a pinging sound in the car dome when an excess flow valve shuts off. This situation can be overcome by hooking up the other liquid line at the transfer station. If It is already hooked up, use one or a
A
VAB.0001134720
VCM Unloading Operating Manual Page 34
II. OPERATING PROCEDURE (Cont.) E. Troubleshooting and Miscellaneous Operating Procedures (Cont.) 5. Tank Car Excess Flow Valve Closing (Cont,) combination of the following procedures: a. Partially close the liquid valves on the dome of the car. This will slow down the flow and should reseat the valve. If this reseats valve, reopen all partically closed valves. b. Turn off the compressor and let the car unload itself for a period, then reopen all valves partially closed and restart the
compressors. This can usually be done only in summer condi tions. NOTE: If the excess flow valves shut in a car that has both liquid lines hooked up, this indicates that the valve is probably faulty. The car number should be noted so that it can be shopped after unloading. On ACFX and PPGX cars, the excess flow rates are set at a lower flow rate than on most UTLX, RTMX, and NATX cars. For the ACFX and PPGX cars, the liquid lines should always be hooked up to each car. 6. Evacuating The VCM Vapor Line Knockout Pot and Recycle Pump For Maintenance Before taking the knockout pot and recyclye pump down for main-
*
tenance; the pot, pump, and related piping must be isolated and the VCM vapors removed (down to below 0 psig) This will be done by using the emission recovery system. a. Close the 4" inlet and outlet valves to the knockout pot.
Tag these valves with "Do Not Operate" tags. b. Close and tag the recycle pumpsTs IV* discharge and recir
culation valves.
VAB.0001134721
I
VCM Unloading Operating Manual in Page 35
i .i
i II. OPERATING PROCEDURE (Cont.)
E* Troubleshooting and Miscellaneous Operating Procedures (Cont.)
6, Evacuating the VCM Vapor Line Knockout Pot and Recycle Pump For Maintenance (Cont.)
c. Open the 2" manual valve that will evacuate the knockout pot and pump to the emission recovery system.
d. When the pressure in the knockout pot and on the pump reaches less than 0 psig, close the 2" valve to the emission recovery system. The knockout pot and pump should now be ready for maintenance.
A
VAB.0001134722
fcmi.i
VCM Unloading Operating Manual Page 36
111. EQUIPMENT INDEX
A. T-601 (Sphere) - Conoco No. 93-001
Purpose
VCM storage tank which holds fresh VCM taken from railcars for use in the reactor units.
Description
Spherical tank, mounted on 9 columns, 541 - 9" diameter, 57T overall height, with capacity of 640,594 gallons, carbon steel construction, built in 1975.
Normal Operating Conditions
Ambient Temperature and 10-60 psig
Design Conditions: 125 F and full vacuum to 100 psig.
Relief Settings
Rupture discs (2) Safety valves (2)
100 psi @72F 100 psi.
B. Bullets: T-201 (West) and T-202 (East) - Conoco Nos. 89-201 & 89-202
Purpose
Spare VCM from RVCM
rage tanks to hold fresh VCM from the reactor units or to store inerts eivers if incinerator goes down.
Description
Horizontal-mounted, 80* straight wall length, 101 - 10V diameter, with approximate capacity of 61,450 gallons, carbon steel construction, built in 1962.
Normal Operating Conditions
Presently kept at ambient temperature and approx imately 0-20 psig.
Design Conditions: 250 psig maximum allowable working pressure.
Relief Settings
Rupture discs (2 per vessel) 136 psi @72F Safety valves (2 per vessel) = 150 psi.
C. Big Corken Compressors (Compressors No. 1, No. 2, and No. 4)
Purpose
Unloading and evacuation of VCM tankcars.
Description
Corken model 690, 2-cylinder, 825 RPM vapor com-
Normal Operating Conditions
Relief Settings
Rated for 60 ICFM at 825 RPM, 295 psig maximum dis charge pressure.
North - Cannot read tag, 250 psi when purchased. South - 225 psi.
VAB.0001134723
VCM Unloading Operating Manual Page 37
III. EQUIPMENT INDEX (Cont.)
D. Little Corken Compressors (Compressors No. 3 and No. 5)
Purpose Description
: Unloading and evacuation of VCM tankcars.
: Corken Model D490, 2-cylinder, 825 RPM vapor compressor.
Normal Operating Conditions
Rated for 35.5 ICFM at 825 RPM, 295 maximum discharge pressure.
Relief Settings
North - No tag, 250 psi when purchased. South - 250 psi.
E. Sphere Transfer Pumps (North and South)
Purpose Description
: To transfer VCM liquid from the sphere to the old or new unit fresh VCM receiver.
RPM.
A50
- 10, 3500
Normal Operating Conditions
Rated for 150 GPM at 252" of differential head
F Bullets Transfer Pumps (East and West)
Purpose Description
Normal Operating Conditions
To transfer VCM liquid. Presently not in use
Centrifugal type, Duriron A50 3500 RPM.
- ,10
Rated for 150 GPM at 252" of differential head
G Emission Recovery System Knockout Pot (T-201) - Conoco No. 45-305
Purpose
To collect miscellaneous VCM emissions.
Description
Vertical-mounted, four-foot straight wall height, eight-foot overall height, four-foot diameter with an approximate capacity of 470 gallons.
Normal Operating Conditions
Ambient temperature and 3 psig
Design Conditions: 150 psi at 366F.
Relief Settings
Rupture disc Safety valve
150 psi @ 72 F 150 psi.
VAB.0001134724
fCH Unloading Operating Manual Page 38
i
!
fll. EQUIPMENT INDEX (Cont.)
i
H. VCM Knockout Pot (T-202) - Conoco No. 45-061
Purpose
: To remove liquid VCM from the vapor line and prevent liquid slugging of the compressors.
Description
: Vertically mounted on supports 6 feet above grade, 5-foot straight wall height, 2.5-foot diameter, with capacity of 150 gallons.
Normal Operating
Conditions
: 70F and 40 psig.
Design Conditions: 150 psig @ 200F.
Relief Valve Setting
: 150 psi.
I. VCM Recycle Pump (P-250)
Purpose
: Removal of knockout pot contents to sphere.
Description
: CMP model #3 x 3 HP driver.
x 5, canned centrifugal pump,
Normal Operating
Conditions
: 10 GPM @ 58 feet of differential head.
Relief Valve Setting
: 170 psi.
J. Compressor Low Pressure Switches
Purpose
: To shut off compressors at the end of vapor recovery from railcars.
Description
: Static-O-Ring diaphragm type.
Set Point
: 6 psig decreasing.
K. Vapor Line Knockout Pot Level Switches - High and Low
Purpose
: To start and stop VCM recycle pump as liquid VCM collects in the knockout pot.
Description
: Robertshaw switches.
A
VAB.0001134725
VCM Unloading Operating Manual Page 39
SAFETY EQUIPMENT AND SYSTEMS A. Continuous Flow Fresh Air System
In order to provide personnel protection, a continuous flow fresh air system has been installed* This system consists of personnel fresh air masks and a constant flow breathing air supply. The supply lines
farm The indiviual hookup stations consist of quick connect/disconnect-type fittings
The individual line to the area is designed to allow a minimum flow of
SCFM to each mask
An
lator, shutoff valve, and an air filter are provided at the piping
header to the area.
Fresh Air masks are required to be worn during the following tasks:
1. Opening railcar dome lids, hooking up or disconnecting VCM tankcars.
2. Any time you enter the tank farm
compressors are running or not.
3. Whenever performing leak detection operations where the VCM
centration is expected to exceed 10 ppm.
4. Entering any vessel that normally contains VCM.
5. Blanking or line breaking of any line or vessel which has contained VCM.
Clean fresh air masks are stored in the yard scalehouse. After using
the mask, it should be properly disposed of by placing it in the used
mask
Fresh air masks
platform at the tank farm
VAB.0001134726
VCM Unloading Operating Manual Fage 40
A
IV. SAFETY EQUIPMENT AMD SYSTEMS (Cont.)
B. VCM Canister Masks
i
\
VCM Canister Masks may be used under the following conditions: 1. Working in a contaminated area of less than 10 ppm VCM for
up to 10 hours. NOTE: If the HNU monitor reads greater than 10 ppm VCM, a fresh air mask must be used. 2. Performing leak detection operations when Honeywell units are indicating between 1 and 10 ppm VCM. 3. Escape from an area of high concentration of VCM to obtain a Scott Air Pack.
C. Scott Air Packs Scott Air Packs are self-contained breathing equipment and must be worn when entering concentrations of VCM which are above 1000 ppm or in unknown concentrations. Scott Air packs are located south of the sphere near the electrical breaker switches and north of the compressor shed.
D. Firewater System The firewater system consists of a deluge system on the bullets and compressor shed, a 6" weir to the top of the sphere, and fire monitors. All firewater to the tank farm deluge systems and monitors is supplied by the six diesel operated fire pumps from the firepond and Number 5 waste water pond. Process water can be used in fire fighting by hook ing hoses to the fire hydrant south of the tankfarm in the MCC area. 1 Fire Monitors There are four fire monitors located around the diked area at the VCM tank farm. Three of these are kept pointed toward the bottom of the sphere with the manual valve to them open. Water can
VAB.0001134727
VCM Unloading Operating Manual Page 41
IV. SAFETY EQUIPMENT AND SYSTEMS (Cont.) D. Fire Systems (Cont.) 1. Fire Monitors (Cont.) be sent to these monitors by opening the tank farm monitor switch on the module charge panel in the vinly control room. Opening this switch operates a pressure switch that automatically turns on the fire pumps. A manual backup switch is located south of the sphere at the tank farm. The monitors should be used to lower VCM concen trations in the area in the event of a VCM leak or to help put out fires. (A manual bottle back up system can also be used to open this fire monitor supply valve.) 2. 6M Weir To Top of Sphere Water can be sent to the top of the sphere by activating a switch on the old module charge panel in the vinyl control room. A manual backup switch is located south of the sphere at the tank farm. Thermal sensors under the sphere can also activate the system and send water through the weir. Water through the weir is rated at 3000 gpm. The primary purpose of the weir is to supply water for cooling the sphere in the event of a fire in the area. (A manual bottle backup system can also be used to open this weir supply valve.) 3. Deluge System The deluge system supplies water through sprinklers to cover the bullets and the compressor shed. This system can be set off with a switch on the old module charge panel in the vinyl control room. The valve must be manually reset at the concrete basin north of the bullets. A manually activated trip is located at the basin.
A
VAB.0001134728
_p.
VCM Unloading Operating Manual Page 42
4
IV. SAFETY EQUIPMENT AND SYSTEMS (Cont.) D. Firewater System (Cont.) 3. Deluge System (Cont.) Thermal sensors under the compressor shed or on the bullets can also set off the deluge system. The deluge system is designed to lower VCM concentrations in the bullets and compressor shed area, to cool the bullets in the event of fire in the area, and help put out fires. Because of the dikes around the sphere and bullets, fire water should be used judiciously in the area. The dikes are designed to contain any VCM spill from the vessesl. The VCM will float on water, and if the dikes are overfilled liquid VCM will be allowed to escape from the area, enlarging the hazard. The dikes can be drained with post-indicator valves on the west side of the dikes. If a dike is drained, make sure that the drain is closed after draining. The valves are to be checked daily. The person draining the dike should stay in the area and close the valve when draining is completed. The four actuated valves on the sphere inside the dike can be closed from the old module charge panel in the vinyl control room or from switches outside of the dike, south of the sphere. (These are the valves that are tested every Wednes day - See Appendix B for checklist) E. Fixed Point VCM Monitor A fixed point VCM monitor is used to detect VCM and record the VCM concentration at various locations at the VCM tank farm. The recorder and alarm annunciator are located in the vinyl control room. The vinyl panel operators will inform the yard operator of any high readings at the VCM tank farm.
VAB.0001134729
VCM Unloading Operating Manual Page 43
V. EQUIPMENT ENTRY PROCEDURE EPA standards for VCM emissions and OSHA regulations on personnel exposure to VCM require that certain operating procedures be followed when there is the possibility of VCM emission to the atmosphere or personnel exposure to VCM. For this reason and to ensure safe working conditions at all times, the "Engineering and Work Practice Control Program for the Reduction of Employee
-
Exposure to Vinyl Chloride" manual should be consulted whenever equipment in the VCM tank farm is opened for any reason. This manual contains a list of detailed procedures as well as safety precautions for equipment opening.
VAB.0001134730
VAB.0001134731
I I
I
4* i
VALVE SETUP CHECKLIST FOR UNLOADING VCM
VALVES THAT MUST BE CLOSED FOR UNLOADING:
_______1. 4 - l11 manual valves on evacuations lines, east side of the compres sor shed.
2. Main 2" overhead manual valves on evacuation line, southwest corner of compressor shed.
VALVES THAT MUST BE OPENED FOR UNLOADING:
1. Main liquid valve to sphere 2. Main vapor valve from sphere
Located Under Sphere
3. Check sphere level Feet _________________________ Inches.
4. Both valves on liquid and vapor lines hooked to car.
h
5. Valves inside car dome for vapor and liquid.
6. Vapor and liquid going to stations between railroad track.
J. Vapor and liquid valves under sight glasses on each station
being unloaded from.
_8. Sphere liquid and vapor valve on main headers on west side of compressor shed.
_9. 4-way valves on each compressor being used must be in vertical position (handle).
10. Vapor line knockout pot inlet and outlet valves on west side of compressor shed.
VALVES THAT MUST BE OPENED FOR RECOVERING VAPOR FROM RAILCAR:
11. Same as above except 4-way valves on compressor being used in horizontal position (handle)
WHAT TO CHECK FOR UNLOADING:
1. Pressure gauages on compressors:
a. Inlet Side - 20 to 50 pounds. If 0, compressor is full of liquid. b. Outlet Side - 60 to 110 pounds. If over 120, compressor is dead headed.
2. Sight glasses on liquid lines (flow of liquid).
3. Jamesbury valves on knockout pots closed to evacuation syste
4. No valve mentioned above partially closed.
5. Liquid VCM avove the low level switch in the vapor line knockout pot.
CAR NUMBERS BEING UNLOADED:
VAB.0001134732
B. CHECKLIST FOR TESTING AUTO-VALVE UNDER SPHERE
MAIN LIQUID VALVE INTO SPHERE: Open
(Test) Closed
Open
A
MAIN VAPOR VALVE INTO SPHERE; Open
(Test) Closed
LIQUID VALVE TO TRANSFER PUMPS: Open
(Test) Closed
RECIRCULATION LINE VALVE: Open
(Test) Closed
Open Open Open
Test must be done while no unloading of railcars is taking place and there is no transferring to reactor buildings. Switches for test are located on north side of switchgear module at south end of VC tank farm. Tests are to be performed every Wednesday.
OPERATOR: DATE:
VAB.0001134733
i
Note: This inspection report ble for unhooking car.
Operator1 s Name:
Time:
Date:
to be completed by the yard operator responsiCar No.
1. All unloading fittings removed
YES
NO
2. All product openings capped or plugged tightly
3. All plugs and fittings equipped with chains
4. Placards reversed and upright (4)
3. Chocks removed
6. Blue flag put down
7. Derailer removed
Visual evidence of any car defects
NOTIFY SUPERVISOR OF ANY ACTUAL CARS ARE NOT TO LEAVE THE PLANT
Note: All dome lids are to be sealed shut and corresponding seal numbers recorded.
The above cars have been inspected and prepared for shipment. To the best of my knowledge these cars have no defects.
Operator's Signature
VAB.0001134734
Uhl I: ..
til i.. i
i :
I 1. 111.. 111.11.................................... .. ................................
nil ' 11 ..................: i .: 111 . -
11111-1114.111 lilikkLLbhUfell-
conoco
Conoco Chemicals Company Conoco Inc. P. O. Box 91. New Highway 25 Aberdeen, Mississippi 39730 (601) 369-8111
*t
Af
PVC PLANT SAFETY AND HEALTH MANUAL ABERDEEN, MS
SUBJECT:
Fire Prevention Plan
EFFECTIVE DATE: March 18, 1983
PREPARED BY: A1
Safety Director
References:CFR 1910, Subpart L-Fire Protection, 1910.134
Purpose:
The potential for personal injury and property damage in operating plants that handle flammable and toxic materials can be serious if the hazards are not properly controlled. Conscientious operation of our plant and adherence to sound operating practices are the only consistent methods that can be used to control these hazards. This plan is therefore being issued to:
1. Minimize the potential for fires and related emergencies through positive housekeeping and control of flammable materials and ignition sources.
2. Insure that all fire protection systems operate properly by routine testing and maintenance of critical systems.
FIRE PREVENTION PLAN
Fire related losses which can occur in industries like ours are particularly
. Due to the nature of the materials which are routinely handled in our
plant (primarily VCM, natural gas, propane, and other hydrocarbon raw n
and fuels), operating personnel must exercise preventive control of hazards which can lead to fires.
Many of the materials used to make PVC and its compounds are flammable or com bustible. Table I, below, is a list of commonly used materials which are flammable or combustible and can be fire hazards if not properly controlled. The majority of these materials are supplied as finely divided dusts and in some cases are capable of causing an explosion if dust accumulations are allowed to form an ignitable cloud.
Section 1.230 Page 1
VAB.0001134735
li ll-T
FIRE PREVENTION PLAN PAGE 2
i'
TABLE I
VINYL DEPARTMENT
Flammable
Combustible
PVC Initiators (Oxidizer) Gasoline Natural Gas/Propane Vinyl Chloride Monomer
Alpha Methyl Styrene (AMS) Odorless Mineral Spirits (OMS) Bubble Breaker Cardboard Diesel Fuel 2-Ethyl Hexaldehyde (CTA) Glycerine Methocel Paper Bags Hydroquinone
COMPOUND DEPARTMENT
Flammable
Gasoline
Combustible
Antimony Trioxide 4310 R-l Violet Expoxidized Soybean Oil Oncor 75RA
Cyasorb UV-531 Diabasic Lead Stearate Ferro ThermOCheck 1827 Synpron 1438 Hostalube XL 165 Wax Lubricants (polyethylene,
petroleum)
"Mark" Compounds Mineral Oil Bisphenol A Cardboard Boxes Color Concentrates Lead Stabilizers R-4067 (Interstab) Hal-Lub-D Hystrene 5016
(Vinyl Base)
i'
Section 1.230 Page 2
VAB.00011*4736
FIRE PREVENTION PLAN PAGE 3
.
DRY BLEND DEPARTMENT Flammable
Gasoline
Combustible
"Acryloid" Products Acrawax "Advastab" Products Advawax Calcium Stearate Cardboard Boxes
Diesel Fuel "Mark" Products Paper Bags Thermolite 101, 175 Wax Lubricants
(polyethylene, petroleum)
PLASTICIZER DEPARTMENT
Flammable
Gasoline
Combustible
Alcohols Phthalic Anhydride "Darco" Carbon Black
Cardboard Boxes Diesel Fuel
Bisphenol A Paper Bags Sulfonic Acid Catalyst
(liquid) (Scott Air Pak and turnout
gear required for fire fighting)
MAINTENANCE DEPARTMENT
Flammable
Acetylene Amercor Mark III Anhydrous Ammonia Gasoline Hydrogen Gas
Natural Gas Propane Paints and Thinners Sulfuric Acid (generates
hydrogen gas)
Combustible
Agitene (regular, super) Amerzene 35 Ammonium Nitrate (highly
dangerous if mixed with oils) BETZ KI-2 Cardboard Boxes Conoco lube oils and greases Diesel Fuel
Mitee Thread Cutting Oil Neutrameen NA-7 Polysperse Plus Slimicide C-31 Slimicide C-68 UCON Lubricants and heat
transfer fluids
Section 1.230
4
VAB.0001134737
FIRE PREVENTION PLAN PAGE 4
LABORATORY DEPARTMENT
Numerous flammable and combustible liquids and solids are stored and used in small quantities in this department.
Many of the above noted chemicals classified as combustible are used routinely and are not commonly thought to be fire hazards due to the very high tempera tures required to ignite them. We must always remember that elevated process ing temperatures can cause a material that is classified as a combustible at normal storage temperatures to be reclassified as a flammable material. Special precautions are outlined in the Safety Control Permit System Procedure which will govern all hot work operations in areas where flammable or combusti ble materials are used or stored. Hot work in the vinyl and propane processing area should be allowed only when there is no other reasonable method.
Fire protection and control systems used in the plant range from simple hand held fire extinguishers to sophisticated water spray deluge systems. This equipment is routinely checked by Safety and/or Electrical and Instrument Per sonnel to insure that it operates properly when needed. The Safety Director is responsible to see that fire protection systems are maintained in an operational condition.
Supervisory personnel plant-wide are responsible for controlling fuel source hazards through conscientious operation and the Safety Control Permit System. Smoking will be permitted only in areas of the plant specifically identified for that purpose. Fire protection rules in the Safety Rule Book will be strictly adhered to.
Table II, below, is a listing of fire protection equipment which is available for used in the event of a fire related emergency.
TABLE II
FIRE FIGHTING EQUIPMENT
Equipment
Areas Of Coverage
Diesel Driven Fire Pumps For Water Supply (4-2000 GPM, 100 psig units - north pump house) (2-2000 GPM, 130 psig units -- south pump house)
Process Water System
Areas processing vinyl chloride monomer and propane fuel.
Plasticizer, compound, and warehouse buildings sprink ler systems
Deluge Spray Systems
Vinyl reactors and tank farm.
Fire Monitors (Fixed)
Vinyl reactor, VCM and propane tank farm, VCM incinerators.
Section 1.230
ii
!
i l
!
i
VAB.0001 H738
ij
FIRE PREVENTION PLAN PAGE 5
TABLE II (Continued)
Equipment
Areas Of Coverage
Fire Monitors (portable)
Emergency equipment station, initiator storage freezers.
Dry Chemical Wheeled Fire Extinguishers
New reactor module, old reactor module, south compound cooling tower.
Dry Chemical Hand Portable Fire Extinguishers
Various locations plant-wide.
Hose Houses and Fire Hydrants
Various locations plant-wide.
Fire Turnout Clothing (hats, coats, boots & gloves)
Available for use plant-wide, stored in the Emergency Equip ment Station.
Extra Handline Fire Hoses, Nozzles, and gated wyes
Selected hose houses in vinyl areas.
Extra Fire Hose (3-inch hose with 2%-inch couplings)
Hose reel cart in Emergency Equipment Station.
Scott Air Paks
Various locations plant-wide.
Additional Firefighting Nozzles and related equipment
Available for use plant-wide, stored in the Emergency Equip ment Station.
C0 (Carbon Dioxide) Fire Extinguishers
Laboratory and Motor Control Centers.
Halon 1211 Fire Extinguishers HOUSEKEEPING
Behind vinyl control panel and in telephone switching room.
Along with the proper control of flammable and combustible materials, main
tenance of high housekeeping standards is critically important. The proper
disposal of trash from the various plant operations will minimize the accumula
tion of combustible materials
The
following is a list of basic
purposes:
A
Section 1.230 Page 5
VAB.0001134739
FIRE PREVENTION PLAN PAGE 6
HOUSEKEEPING - (Continued)
1. Ordinary hazard materials such as floor sweepings, paper bags, used filters, rags, and other miscellaneous discarded items shall be placed in dumpsters which are routinely dumped into the central trash compac tor.
2. Initiator bottle disposal shall be done in accordance with current Vinyl Department procedures. Disposal of initiators which cannot be used in our operations shall be done under supervision of the Safety Department and Process Engineering.
3. Inventories of empty drums in the various operating areas shall be kept to a minimum. All empty steel drums shall be taken to the drum storage area east of the API Separator. Empty fiber drums should be placed in the large open top trash containers located south of the plasticizer building.
4. Cleanup and disposal of dust type materials which have been contami nated with substances hazardous to health, such as lead, shall be done with vacuum cleaning methods.
5. Housekeeping requirements for operations which involve hot work are specified in the Safety Control Permit System Procedure.
Motor control center areas (breaker rooms) shall be maintained free
and
of discarded materials and shall not be used as storage
Whenever breaker panels are located in storage areas, a clear
lane of at least 36 inches from the front of the breaker panel
shall be maintained.
7. Containers of laboratory solvents and reagents, once empty, shall be disposed of as ordinary hazards (see paragraph 1). Waste chemicals shall be disposed of in accordance with approved waste disposal proce dures ,
FIRE PROTECTION SYSTEM MAINTENANCE
The fire protection systems and equipment used in the plant undergo routine testing and maintenance. The Safety Director is responsible to see that all systems are operational and that routine testing is accomplished. Also, he is responsible to see that repair work on systems and equipment is accomplished on a timely basis whenever problems are discovered. Table III below specifies testing requirements and frequencies for the various systems and equipment.
Section 1.230 Page 6
VAB.0001 34740
FIRE PREVENTION PLAN PAGE 7
TABLE III
FIRE PROTECTION SYSTEM AND
EQUIPMENT MAINTENANCE
System/Equipment
Frequency
Checkout Requirements
Fire Pumps
Weekly
1) All engines start on pressure drop and sequence.
2) Battery and charger condition. 3) Engine operating temperature. A) Engine oil pressure. 5) Engine hours. 6) Fuel levels. 7) Flowing and static pressure. 8) Engine RPM
Semi Annual
1) Flow studies. 2) Verify engine RPM with tachometer. 3) Cooling system flush and charge
with fresh coolant (annual). A) Verify thermostat operation.
Deluge Systems
Weekly
(Reactors & Tank Farm)
1) Flow gas over gas detector field sensors on gas detection system check for system release.
2) Proper operation of deluge valvestrip and reset.
Monthly
1) Systems drain freely. 2) No breaks in deluge piping systems.
Quarterly
1) Check flowing pressure on each system.
VCM Storage Sphere
Weekly
1) Remote and local control operation of actuated valve (pit).
Stationary Fire Monitor Semi-
Nozzles
Annual
Sprinkler Systems
Annua1
Post Indicator Block Valves and Other Fire System Valves In Each Unit
Weekly
2) Nozzle orientation directed at bottom half of sphere.
1) Free operation of valve. 2) Flush until water is clear. 3) Nozzle free of debris.
1) Flow test at inspector check point. 2) All systems protected by antifreeze
solution if wet.
1) Check to insure that firewater supply valves to unit deluge valves are open and locked.
2) Verify all thermostatic release air line valves are open and locked.
Section 1.230 Page 7 vab.0001134741
FIRE PREVENTION PLAN PAGE 8
4
System/Equipment Post Indicator Block Valves and Other Fire System Valves In Each Unit Fire Hose
Fire Extinguishers (Hydrostatic) Emergency Alarm
Smoke Detection System
CO- Fire Extinguishing System - Lab Chemical Storage Room
TABLE III
FIRE PROTECTION SYSTEM AND
EQUIPMENT MAINTENANCE
Frequency
Checkout Requirements
Quarterly
1) Check to insure that all underground supply line block valves are open and locked.
Annua1
1) Hydrostatic pressure test of at least 200 psig main tained for at least 15 seconds.
2) Hose shall not leak or jacket threads break.
3) Dried and reinstalled in hose house, or rack, pre connected to hydrant or supply valve.
Five or Twelve Years
1) Done under contract with licensed cylinder hydro static test contractor.
Weekly
1) Test alarm tones (vapor, fire, evacuation, weather) one per week on rotating sixteen week cycle.
2) Test all clear tone after each test.
Semi Annual
1) Check voltages, detectors and alarm signal devices for proper operation.
2) Check supervisory cir cuitry.
Semi Annual
1) Weigh C0 supply bottles, refill as needed.
2) Check actuating mechanism for proper operation.
3) Check pre-alarm for opera tion and audibility.
4) Assure that all piping con nections are secure and that there are no system leaks.
Section 1.230
ii
VAB.00011J
PVC PLANT SAFETY AND HEALTH MANUAL ABERDEEN, MS
Conoco Chemicals Company Conoco Inc.
P. O. Box 91, New Highway 25
Aberdeen, Mississippi 39730 (601) 369-6111
SUBJECT:
Emergency Plan-Immediate Actions
EFFECTIVE DATE: March 18, 1983
PREPARED BY
Safety Director
APPROVED BY References Purpose:
Manager
CRF 1910, Subpart L-Fire Protection, 1910.1017 Vinyl Chloride
The Aberdeen Plant Emergency Plan is broken into two separate and supporting parts. This section, entitled Emergency PlanImmediate Actions, contains the essential steps necessary to control an emergency condition in the plant. The primary objectives of this section are to:
1. Insure the safety and welfare of employees and the general public in the event of a plant emergency;
2. Minimize property damage and provide for the resump tion of normal operations following a plant emergency;
3. Satisfy the legitimate concern of employees, their families, and the general public by providing prompt, accurate information concerning the extent and effects of plant emergencies.
Definition Of Plant Emergencies
A plant emergency is any unexpected event or condition which requires imme diate action to prevent injury to personnel and/or damage to equipment. Plant emergencies include, but are not limited to: fires, explosions, release of toxic, flammable, or corrosive materials, or an injury which requires removal of an employee from an elevated location.
Significant vapor release conditions can cause human overexposures and/or fire. The conditions that warrant vapor or any alarm are described in Attachment A. Follow-up announcements must be made as noted to prevent exposure and maintain a clear area.
Immediate Actions To Be Taken In Event Of A Plant Emergency
Section 1.231 Page 1
VAB.0001134743
EMERGENCY PLAN-IMMEDIATE ACTIONS PAGE 2
Immediate Actions To Be Taken In Event Of A Plant Emergency (Continued)
The extent and severity of a plant emergency shall dictate the extent to which the emergency plan is utilized. The initial determination of required action shall be made by the Shift Supervisor in charge of the affected area(s). The action taken may range from handling the emergency with person nel present at the time to full alert of the emergency organization. In general, the following actions, as applicable, are required during an emer gency :
I. Activate The Emergency Alarm System
Anyone who detects an emergency situation shall communicate it to the Vinyl Control Room by the radio, the Gaitronics System, or by dialing 2200 on the plant telephone system. In each case, the caller shall clearly communicate the location and nature of the problem to control room personnel (this information must be recorded on the forms provided). The Operator who takes the message shall then activate the appropriate alarm by depressing that button on the emergency alarm system control panel. Once the alarm system has been activated and the alarm is no longer operating, the operator shall dial 641 on the plant telephone system and give the nature and location of the emergency in a clear, calm, and distinct manner. This message must be given a minimum of three (3) times in order that plant personnel understand the nature and loca tion of the problem. The message shall also be given three (3) times over the Gaitronics paging system as noted above.
Plant Emergency Alarm Codes
The plant emergency alarm tones are generated electronically from a tone generator that is a part of the Gaitronics paging system. As is noted above, the generator is controlled by the Vinyl Operators in the Vinyl Control Room. This alarm system has been designed such that anytime the Gaitronics alarm is activated by an operator in the control room, a relay closes causing the Gaitronics and public address systems to be intercon nected. This allows the signal tones to be broadcast plantwide by all the Gaitronics and public address speakers.
The alarm tones and their corresponding meaning are shown below
Alarm Tone
Meaning
Siren
Pulse
Vapor
Warble
Evacuation
Yelp
Severe Weather/Tornado
Steady
All Clear
Section 1.231
VAB.00011
*
EMERGENCY PLAN-IMMEDIATE ACTIONS PAGE 3
A
II. Use The Proper Emergency Equipment
Protective equipment needs are dictated by the emergency conditions. Personnel responding to an emergency must evaluate the risks before they attempt to correct problems. For emergencies involving VCM or propane vapor releases, the minimum requirements for personnel protective equipment would be a Scott Air Pak. For more serious releases where flammable vapors have been released into an area where an ignition could occur, protective equipment needs could reasonably include full fire turnout equipment, Scott air packs and water sprays from deluge systems, fire hose handline or all again depending upon the
III. Evacuate Non-Essential Personnel From Danger Areas
Always evacuate non-essential personnel and all personnel not properly equipped with personnel protective equipment which is appropriate for the hazards present. Emergency crews are to report to the emergency location as directed in the Emergency Crew utilization section below. Evacuated personnel shall not be allowed to return until the emergency situation has been corrected. In all cases, evacuated personnel shall immediately proceed to primary evacuation areas as noted below. If the wind directs hazardous vapors into the primary evacuation areas, evacu ated personnel shall proceed to the secondary evacuation area at the guardhouse and assemble in departmental groupings as noted on the fence located east of the parking lot and south of the guardhouse. If that area is noted as being contaminated by VCM vapor, evacuated personnel will be moved to a safe location along the property line north of the plant. ALL EVACUATIONS MUST BE PROMPT AND ORDERLY - RUNNING SHOULD BE AVOIDED!
Supervisors must designate non-emergency personnel to act in their place for head count purposes (noted below) if the emergency condition requires the activation of the Emergency Crews or Emergency Organiza tion.
Wind direction at the time of fire or vapor emergency will play an important role in the choice of escape routes. Evacuation routes should always be at right angles to the wind (cross-wind). Use the wind socks located on silos 415 and 281 or slurry blend tank 502 to determine the wind direction.
4
PRIMARY EVACUATION AREAS
Vinyl Area - At pad north of the control room.
Lab & Compound/Plasticizer - Warehouse at northwest corner of the staging area directly south of the plant auditorium.
Maintenance, Receiving Warehouse/Stores, Yard - Main Shop
Off Shift (Evenings Nights, and Weekends) Stores/Warehouse -- Guard House
Section 1.231 Page 3
VAB.0001134745
EMERGENCY PLAN-IMMEDIATE ACTIONS PAGE 4
PRIMARY EVACUATION AREAS (Continued)
Transportation - Warehouse at northwest corner of the staging area but east of the lab and compound/plasticizer group.
Off Shift - Yard And Mechanics - At pad north of vinyl control room.
Office Personnel -- Lobby in each office area.
Contractors - North of main gate.
IV. Account For All Personnel
When personnel have assembled in the primary evacuation areas, head counts must be made as noted in the Evacuate Non-Essential Personnel From Danger Areas section above. Personnel not accounted for at this time must be regarded as trapped and/or injured and rescue efforts initiated. It is extremely important for all personnel to understand the location of their primary evacuation areas and to get to them as quickly as possible; otherwise, other personnel may have to jeopardize their personal safety to conduct search and rescue operations. NOTE: Where supervisors have been pre-assigned duties under this plan, other arrangements must be made by the various departments to insure that personnel are accounted for on a timely basis.
Each department shall develop a plan to account for their personnel. Personnel in that department shall be trained in the prompt and proper execution of their plan when it is approved by the manager. Each department will report the status of their personnel to the guard. Any missing personnel will then be reported to the Emergency Officer by the guard.
V. Rescue Trapped Personnel
Search and rescue operations in the immediate area of VCM and propane vapor releases and fires must be attempted only with fire turnout gear due to the likelihood of vapor ignition causing a flash fire or explo sion, or exposure to extreme heat.
In the event that rescue operations are required during serious plant emergencies, the Emergency Officer (Emergency Crew Chief on off shifts) will utilize personnel who are not assigned specific emergency duties to conduct search and rescue operations. In all cases, the buddy system is required to perform these duties and the Emergency Officer must take that into account as he assigns the duties. Personnel pro tective equipment requirements must be defined by the Emergency Officer. These requirements are outlined in MUse The Proper Emergency Equipment" section above.
Rescue operations may become necessary due to serious personal injury in elevated plant locations. In this event, the rescue equipment kept in first aid and the Emergency Equipment Station must be assembled and utilized by plant personnel under the joint direction of the Emergency Officer and either the Plant Nurse or ambulance attendant.
Section 1.231 Page 4
VAB.000113 746
EMERGENCY PLAN-IMMEDIATE ACTIONS PAGE 5
VI. STOP ALL HOT WORK! - Motor vehicles, portable transfer systems, the incinerator, welding machines and other sources of ignition must be positively shutdown immediately whenever the plant emergency alarm is activated! Shut down and secure operations as required to prevent further injury to personnel or damage to equipment.
VII. Stop flow of:
A. Flammable materials feeding fires or potential fires, including dryer and incinerator gas burners.
B. Boilerhouse operation is to be shutdown only in cases where unfavorable wind conditions and flammable material release is great enough to present a hazard. Boilerhouse shutdown can occur only on direct orders from the Emergency Crew Chief, the Emergency Officer, or the Safety Director.
VIII. Fire Control
This section is divided into two interrelated parts - Activation Of Fire Protection Systems And Emergency Organization Utilization. Although they are treated separately in this plan, actual emergency conditions in the plant will dictate a coordinated effort using every safe and reasonable control method at our disposal.
Activation of Fire Protection Systems
The fire protection system available in the plant should be used to control ignition sources in event of vapor release or to remove heat in event of fire. Whenever a vapor release occurs, deluge systems or fire monitors should be put into operation immediately to disperse vapors and reduce ignition sources, depending upon the conditions. In the reactor modules, vapor sensors detect the presence of flammable gases and at preset concentrations, these sensor units will "trip" or activate the unit deluge valves automatically. Other methods of fire water activation for the deluge systems include:
A. Operation from the control room panel;
B. Manual release at the deluge valves; and
C. Thermostatic release sensors. (High heat or rapid rate of tem perature rise such as fire or direct steam impigement will cause a trip condition.)
(The above tripping methods simply release control air from the top chamber of the deluge valves. Loss of control air causes the valve to open and allows fire water to flow through the deluge valve into field piping.
Section 1.231 Page 5
VAB.0001134747
EMERGENCY PLAN - IMMEDIATE ACTIONS PAGE 6
The conditions that would reasonably dictate the need to use either the deluge system or fire monitor nozzles and other equipment are:
Deluge System
- Serious leaks from rotating equipment seals.
- Abnormal discharges of flammable material from process piping, valves, and relief systems.
in the VCM e VCM tank farm
sor shed or
(NOTE:
Cold Water On A Hot Corken Compressor Could Cause A Rupture Of The Compressor. Use Caution And Sound Judgment In This Area.)
- Fires resulting from any of the above.
Fires Monitors - Permanently installed fire monitors in the various areas provide supplemental fire water to locations which may need additional water for equipment protection due to direct flame inpingement, high concentrations of VCM vapor, or during periods when the deluge system is out of service. During VCM vapor releases which involve the reactor relief systems, the Supervisor may decide to utilize only the fire monitors since the point of discharge is above all other operating equipment. Due to high volume demand of the deluge systems, fire streams from monitor nozzles may not reach the top of the relief lines if both reactor area systems are in operation. If supplemental fire water is needed or in cases where there is no permanently installed fire protection system (i.e. the initiator
, the Supervisor should utilize the portable fire monitor in that area and hose reel stored in the Emergency Equipment Station.* Lead Operators should make sure the fire pumps are operating when major leaks occur in the reactor areas and only the fire monitors are in use. If the pumps are not operating and there is flow through the monitors from the process water system, the pumps can be started by briefly opening and closing the deluge water valve to the sphere from the old module control panel.
Phase IV of the Fire Protection Improvement Proj hose house at the initiator storage freezer.
will provide a
Other Equipment - In the event that stationary fire fighting equipment is inadequate to control or reduce the impact of an emergency condi tion, additional fire fighting equipment is available in the Emergency Equipment Station. The equipment available includes fire turnout
, portable fire monitor, firehose nozzles and water wall nozzles (used to protect adjacent exposures from fire damage or to provide a
vapor shield barrier - water is supplied with 2% or 3 inch fire hose).
Section 1.231 Page 6
VAB.OOOli:
EMERGENCY PLAN-IMMEDIATE ACTIONS PAGE 7
Emergency Crew Utilization
Recently, many of the fire hose stations in the Vinyl operating areas were put on the new fire water system. This resulted in higher opera ting pressures available to fight fires at these stations. Increased supply pressure causes increased nozzle reaction forces (more effort is required to control the hose when water is flowing). The operating pressures from the north (#1) and south (#2) fire pump houses are 140 and 155 psig respectively at design flow rates. This high pressure requires additional manpower for hose handling. Previously, a five man hose crew was planned. A seven man hose crew should be used now to handle the hand lines and nozzles (three (3) men for each of two (2) hoses and a Crew Chief). No changes have been made in the basic structure of the Emergency Crews since no additional staffing is available for this work. The Emergency Organization is shown in Attachment C.
The utilization of the Emergency Crews must be directed to controlling fires and vapor releases as follows.
A. In the event of any serious emergency, the Emergency Crew Chief is to activate the Emergency Organization.
Activation Of Emergency Organization - Whenever the acting Emergency Officer (Operations Superintendent of affected area - alternate - on duty supervisor) determines that the Emergency Organization must be activated, it shall be done in the following manner,
1. Weekdays - Announce "ACTIVATE EMERGENCY ORGANIZATION" three (3) times over the paging systems (P. A. and Gaitronics).
2. Off Hours - Instruct the plant guard to initiate call out of the Emergency Organization using the current Emergency Organization Call List (Attachment B.)
The on-duty Supervisor can instruct a lead operator to initiate either action.
In the event of a fire alarm. Emergency Crews are to assemble upwind of the fire and await further instructions. In the event of a vapor release alarm. Emergency Crews will assemble only if requested by general plant announcement. An assembly point must also be announced as directed by the Emergency Officer.
B. Use stationary fire protection systems to our greatest advan. Use deluge systems and fire monitors to remove heat from
a fire, reduce ignition sources, disperse flammable vapors, and protect nearby equipment and structures. Supplement stationary equipment with portable fire protection equipment such as moni tors, fire hose and nozzles using a ground loop as necessary to protect personnel or equipment.
Section 1.231 Page 7
VAB.0001134749
EMERGENCY PLAN-IMMEDIATE ACTION PAGE 8
Obtain fire turnout equipment (helmets, coats, boots, and cotton gloves from the Emergency Equipment Station as needed to protect personnel from potentially hazardous exposures in vapor releases and fires. Scott air packs must also be used to protect personnel from toxic or otherwise harmful vapors and smoke.
D. Emergency Crew personnel should provide help to operating unit supervisors and unit personnel to block in fuel sources away from the fire or vapor release as directed by the Emergency Officer. Personnel performing this work should put on fire turnout gear and Scott Air Packs before attempting to enter an area near a fire or serious vapor release.
E. The Emergency Crew Chief shall guide fire fighting personnel into fire areas to block in fuel sources only after all other reasona ble methods of fire control have been tried and found unsuccess ful. The hose crew size is seven personnel (Chief and two-three man hose crews for handlines). All personnel must understand that each move must be controlled by the Crew Chief and is commanded verbally by him.
F. If a man is down near a fire or serious vapor release, the Emergency Officer must quickly assess the risks his crew must face to rescue the downed person. He must take into account such things as the injured person's location, the location of the fire or vapor release, climbing requirements, obstructions, available manpower, hose availability, and other similar con siderations. The specific question that must be answered by this analysis is: Can the injured person be removed under the conditions at the time without seriously endangering the lives or safety of the rescuers? Extra personnel will be required to attend the needs of the injured in this case.
IX. Utilize outside assistance and notify the community as required.
A. Aberdeen Fire Department ............................................................................... 369-9551
B. Ambulance................................................................................................................................ 369-2455
C. Hospital Emergency Room...................................................................................... 369-2455
D. Dr. R. E. Coghlan (Office).......................................................................... 369-2411 (Home) ................................................................................ 369-4418
E. Dr. J. N. Turnage (Office).......................................................................... 369-2413 (Home) ............................................................................... 369-6311
F. Aberdeen Police Department
369-6454
.
i
1
\
H t
Section 1.231 Page 8
VAB.000113
l
EMERGENCY PLAN-IMMEDIATE ACTIONS PAGE 9
In the event that an emergency condition necessitates the assistance of the Aberdeen Fire Department, the following guidelines must be understood.
1. The Aberdeen Fire Department has agreed to provide assistance in the areas of manpower and fire water pressure boosting for handlines.
2. The Emergency Officer is responsible to determine if Fire sDepartment assistance is necessary to control a fire. If he determines that they are needed, he must initiate the call by notifying the guard to make the call. (This can be done by radio to the control room and a lead calls the guard.) He must also assign someone to meet the fire trunk at the guard house. The guard should be informed as to who has been assigned to meet the fire truck so he can tell the fire truck driver who to follow. The guard will hold the fire truck until the escort arrives. Specific instructions should be given to the employee assigned to meet the fire truck so the route of travel and desti nation are understood.
3. The Emergency Officer shall retain control of all fire fight ing operations.
4. Additional manpower from the fire department may arrive at the plant in personal vehicles. They should be allowed to pass through any roadblock. They are to park in the employee parking lot. Any fire department personnel who do not have protective equipment should be stopped at the gate. Fire department personnel are to assemble at the gate and will be escorted to the fire location by a CONOCO employee, designated by the Emergency Officer. Aberdeen Fire Department personnel must be equipped with fire turnout equipment that covers all body parts to fight fires of a serious nature in the vinyl or propane areas. For fires in other areas, full fire turnout equipment may not be required. The Emergency Officer must judge the needs and send firemen back if the turnout equip ment is inadequate. Outside fire fighting personnel must be escorted at all times by CONOCO escorts.
Have local police warn adjacent plant and residential areas if they are threatened by fire, flammable material releases or toxic gases (chlorine or hydrogen chloride (HC1) as a result of a VCM fire). Plant Manager approval is required prior to contacting the police department unless the delay increases the danger to the community. (See Public Alert section in Safety And Health Manual Section 1.232 Emergency Plan--Reporting Requirements and Emergency Organization Duties.)
Section 1.231
VAB.0001134751
1
i i j_i Cl- I Ij Li ..............................
Lulu ljI li itl udj b i*-ulhbti1u-HNiliirli -t-l
' I
.... | PI 4 UlJlh+Ill . l-cl.1 ...............fall-
..................... . I LlJ-l I H L. I I L| I L| ! i_L . I Lj4U44M : I I I I M '! N I li >-FI iHhhj I-I H I-H4J-I+ 1 Lrl ; I I I I 1 : I- 1 I I ......................' . I n I I I I l-h iri'l I I I..............................
I lI l| . . . L.J .Ij Ll .11 I .>1 I I U I I ill I >1 ukli i.; 11i-lUkil lUlUH irtil+iJ
EMERGENCY PLAN-IMMEDIATE ACTION PAGE 10 X. Locate the boundaries of contaminated areas during vapor releases*
This will normally be done by the Safety Supervisor during weekdays. The Vinyl Shift Supervisor will perform this duty during off--shift hours only after he has successfully contained the emergency condition and completed the work assignments necessary to clear the emergency. Readers of the plan must understand that the items discussed in this plan have not been placed in any priority. In fact, most of the items will have to occur at the same time. Responsible personnel must exercise sound judgment in their decision making and obtain help whenever they think they may need it. It is far better to call out the Emergency Organization in a time of potential need and the help arrive only to find out that the problem has been taken care of, than to find out after people have been hurt that help was needed.
I
Section 1.231 Page 10
VAB.000113'? 752 i
ATTACHMENT A PLANT ALARM SYSTEM
TRIGGER LEVELS
CONDITION
RESPONSE
Three (3) consecutive readings on the Honeywell at or above 5 ppm - VCM at any point (EPA leak).
1. Notify unit r Chief Operator to clear personnel from affected area and keep them clear.
Known release, three (3) consecutive readings on the Honeywell*s 10 ppm-VCM or greater, or a major vapor release in any VCM or propane handling area.
Fire
2. Find and properly report leak.
1. Sound VAPOR RELEASE ALARM.
2. Announce which unit is affected
and should be cleared on the
Gaitronics and public address
systems. (Announce 3 times -
each system.)
w
3. Dispatch Supervisor, Chief or unit operator to find leak, check size of leak, clear per sonnel, and report conditions to control room personnel. THIS MUST BE DONE ON A TOP PRIORITY BASIS.
1. Sound Fire Alarm.
2. Announce location of fire on Gaitronics and public address systems (3 times each system).
Evacuation
-
3. Announce Emergency Crew assem bly point as specified by Supervisor.
4. Activate Emergency Organization as directed by Supervisor/ Emergency Officer.
1. Sound Evacuation Alarm.
Severe Weather/Tornado
2. Announce Plant Evacuation over Gaitronics and Public Address systems (as noted above).
1. Sound Severe Weather Alarm as specified by Supervisor or guard (if tornado is seen)
2. Initiate steps to control reac tors or rapidly shut down equipment.
3 . Seek shelter in protected area.
Sec t i
0031134753
ATTACHMENT B
EMERGENCY ORGANIZATION CALL LIST
When advised by the Shift Supervisor, or his designee, the guard will calling the names listed bleow in numerical sequence (rank order) from appropriate list.
the
Vinyl
Compound
Utilities
1. D. J Miller
. 369 9234
2 P. E Markey
369 6019 3. L. D. Honeycutt
343-5595 4. C. R. Miller
369-9100 5. A. H. Sather
369-9271 6. V. A. Belk
369-4416 7. J. Friend
369-7377
(1)
J. Frossard 369-6990
8. J. L. Horstman 369-6005
9. C. E. Davis 369-8780
10. C. R, Snowden 1-327-7382
11. F. W. Frantz 369-8508
12. P. J. Kober 369-7096
13. R. G. Gilreath 369-7745
14. J. G. Roberts 369-8059
15. J. V. Uptain 369-8109
16. M. H. Williams __________1-963-2796 17. G. A. Morgan
369-6522 18. R. A. Miller
1-327-0951 19. R. A. Frohreich
1-328-3628 20. V. L. Thornhill
369-8952 21. S. C. Hillman
369-7892
1. R. G. Gilreath 369-7745
2. P. J. Kober 369-7096
3. L D. Honeycutt 343-5595
4. C R. Miller 369-9100
5. A H. Sather 369-9271
6. V A. Belk 369-4416
7. J Friend 369-7377
(2) L. Michels
369-6743
1. 2. 3. 4. 5. 6. 7. 8. (3)
8. J L. Horstman
9.
369-6005
9. C E. Davis
10.
369-8780
10. C R. Snowden
11.
1-327-7382
11. F W. Frantz
12.
369-8508
12. P E. Markey
13.
369-6019
13. D. J. Miller
14.
369-9234
14. J. G. Roberts
15.
369-8059
15. J V. Uptain
16.
369-8709
16. M. H. Williams
____________1-963-2796
22. J. C. Green
27
369-9288
23. W W. Robinson
28
369-8606
24. W. F. Higginbotham 29
1-327-0827
25. J A. Dixon
30
369 8372
26. J L. White
31
369-2991
J. L. Horstman 369-6005
F. W. Frantz 369-8508
C E. Davis 369-8780
C R. Snowden 1-327-7382
C R. Miller 369-9100
A H. Sather 369-9271
V A. Belk 369-4416
J Friend 369-7377
J Pope Unlisted (Call So. Central Bell Operator)
L D. Honeycutt 369-5595
P E. Markey 369-6019
D. J. Miller 369-9234
P. J. Kober 369-7096
R G. Gilreath 369-7745
J G. Roberts 369-8059
J V. Uptain 369-8109
M. H. Williams 1-963-2796
R. W. Rye 369-4730
D. D. Knight 1-205-698-9545
R. D. Jackson 369-2405
V. E. Messick 1-327-0741
D. S. Cox 369-8752
II
Section 1.231 Page 12 VAB.000113I7
4
3 H n M 1*4 c
oO o M
PJ 9 M
3 a.
WQ CD 3
9
3 CD O O CD pj
M* 9 e O rt 9
3 3 3 9 3
a a. >9 rt H*
CD rt
o3 CD
rr *3
r1H 3
OOO c n VS 9 3 Ou 3
> O 3 CD H* 3
e3u
cn
3
rt
rt CD
9 CD
c
O
n
>M
3rt
a*
90 CJ
PzI
o *<
o 90
i it
n c>
o
m
S3 o
cn s*
hj
c
-3 o
M 3 3 e H* s o
H<-
-t o*
Ctt co
CD 3
H>T)
3 D
s: O
CD <9 9
o
SC 3
oC
o
B
ft rr* O 3
H* Hi 3* 3 3S
H 33
cn 3
n
> 3* H 3*
H* o
3
s 3* CD ft 1 H*
n f>
9*
93 9 vs H* CD 3
1 O
f> 9
3
1 VS
M cn
3
CD ro
l
o 3
tH HJ
CD H*
a. -
CD CD HI
CL
w <-o
oc
H
CD
3 rr 9
a. 3* *3
*3
a
*x o o pi s H O
JO
V
*- *
4
r* hj 3M 3* 90
cn r H CD 3> o. t-t
O H CD J> n cn 3* cn 3M h cn 3H
S&
3H
Z c rt CD CD *
h- rt
c 9 o*
* cn 3* HHi ft
cn c-
h <o
3
HJ w 90 cn H
>
H o
osa
m
PI HJ
5C
CD C/5 o O
o CD 9 o *9
cr CO 9 9 CD
9 3
as
W
CO 9 rt
0) ft
> oc
9 ft
w
o cn 9 rt 9 H* g
3 cn 9 CD a. O
0) 9 CO
Mo 3 PJ
O 9 C/5
9
00 90
CD c
rt >1 a
O
3 3
CD 9 rr
rt ft
Hj *3
39
n
9o<
o
3 H*
pj
CD CO 3
90
o cn
l-l c
o
ar
*3
CD
HI
3
o
o
CD CO
CO cn
cn
PJ
3 cn
00 H
3 CD >-4
s3
H
g> pi PJ 58 Cl m; cn *O
HI HI TJ M 1 n o pj o 90 CD cn 3 CO
PI 9 00
9 CD CD
H
'/
s CD
O
3* f
9 9
hj
H* s:
n pj
9
9 cn
9
cn
pj
pj Z 9 2C 9 o *9 9
0Q PJ h-* 9 H* 90 O 9 9W
CD CD CD CD 3 CD rt
rt CD
CD tj
S
PI
E n pj > Z t-4
O t-3
< !>
99 ft 9
oO
90
O PI
O
9 cn
O
H
gCD e
cn
MO
9 cn Hi W
CD 5 0
CD rr
o
c
H CD 3
o
J O cr
M3
cn
c
a
O 3
3Pu
3
CD o
3 >n
3
rt
H* r-4 CD o ow
H 90
xe (ao
nzr
H* CD
Hi
o as
ar 9 <D 3 9C
9H* H|
CD ft O
ft 3 3
3 00
r* > Cd
cn cs rd
o po H
CJ 90 O e rd
aq:j mo
VAB.0001134755
4
ATTACHMENT D
PLANT EMERGENCY ALARM DATA SHEET
DATE:
ALARM: (Circle One)
Fire
Vapor
TIME:
Evacuation*
Tornado**
Evacuation alarm must follow either the fire or vapor alarm.
** The
alarm
The difference lies in the fact that the evacuation alarm by
itself means a tornado is approaching. The evacuation alarm
must be proceeded by either the fire or vapor alarm.
LOCATION: ___________________________ SPECIFIC NATURE OF PROBLEM
Alarm Activated By:
Section 1,232 Page 15
VAB.000113
E SAMPLE RAILCAR PLACARD
A
iI;f
Ilk
4
if
Ik
t
k 11
It 11 11 4 'l 4 i. ik k ik ik k
Ek
<i Ik l|
I!
I
TS8 FLAMMABLE GAS
CHICAGO, IL 00026
12
__________
TS8 FLAMMABLE GAS
4tLf.
i: i k i. 111 | |x' .............. 1, 11
;h |J M I: niirili4ll-llU-lll tin i-Lill 11 lt:4-li-l*J-nil-ul-:i-li ! i n i i-IJ I L|.>-i |-h! I ............................... |. i n
' | I LI | I il i I I . I I i I j J hi '.p'l* 4 ' L
LABELM ASTER
..I 1. 11 i 1111 lU i-l 11 i I-LII i I It: 111111 I i-hl-i I NKl-1 r+l1 i-I-I I hi 1141:11-111 i-i 111-111 Li ............ ... l-i 111111111' 1I 11L' i i I HU
1 111 I-..............
I k I I
*
t
F. PHOTOGRAPHS
FIG. 1 - VCM TANK CARS 11 SPOTTED11 FOR UNLOADING AT EAST SIDE OF TRANSFER STATION NO. 1
FIG. 2 - VIEW OF HANDBRAKE LOCATED AT THE END OF TANKCAR
VAB.OOOl134759
SAFETY VALVE ASSEMBLY GAUGING ROD ASSEMBLY
-- V CMLLQUID LIN E_H OOKU P_JIOZ Z L E
H-
VCM LIQUID LINE HOOKUP NOZZLE
VCM VAPOR LINE HOOKUP NOZZLE
FIG. 3 - UNLOADING_AR.BAN_GEMENT_FO R_VCM_TANKCARS
VAB.OOOl134760
TO
*
BULLETS
t* -------------------------
-- -J
NOZZLE
5------------------------- #1 SIGHT GLASS LINE -------------------- ^2 SIGHT GLASS LINE ------------ ,y3_S_I_GHI.GLASS. LINE PIPING_.AND VALVES ON WEST SIDE_0F THE COMPRESSOR SHED
VAB.OOOl134761
FIG. 5 - SIGHT GLASSES FOR CHECKING VCM LIQUID UNLOAD IN GL, _L OCAT ED ON EAST SIDE
OF COMPRESSOR SHED
F^G. J,,,: _ANOim.iIEW.OF SIGHT GLASSES AS SEEN LOOKING NORTHWARD
VAB.0001134762
G3HS d0S$3ddW03 30
rM'm-m'r
r m * f.wi.
d3Nd00 ISSKHIdOM - iOd lflOdOONd WO A (202) 1 - 8 'Old
Q3\IS d 0 S S3ddW00"JO dlN d 63`l's3MHId6N~ -IOd inOdOONd W31SAS Ad3A003d N0ISSIW3 (102) 1 - L 'Old
VAB.OOOl134763
i him i ! it ii ii i\i
j'J C
31V3S
*
y,v .
:3ivo :odjy
IddlSSISSIW
S V IW HD
1
3
1
QdV 0)0
^1A\
NOiidDOSga
N33ad39V
131YO [nsi /
-
11
-i
"l'
! '.iih
4jS
fi.
94 1 V
I
71
-r'-
+<j~i . .
7*5?/ y
>4^4 jfS **
l*'
r
'
P______
*
_--#
*
XJ
c i>.
-H
3-
J/
/w
*^
VAB.0001134764