Document QXVDjvbNvR5KrGavYMR2DDLZE
Moisauo
thOM iNAME A LOCATION!
A. Li Rasmussen - WOK
DATE April iji 1971 '
"
SUBJECT
:
REFERENCE
Pollution Monitoring Aroclor Incinerator
TO : c. P. Buckley 'f})
CC: A, E. Leiay
P. B. Helaler
'
W. C. Engman
N. B. Wolk - 00
O. E. Thompson - 00
B. Caraway
E. S. Tucker - So. 2nd St.
M. Poresman
R. L. Maolin
This memo la to confirm our dlaouaalon on pollution monitoring of the Aroolor Incinerator. Water batching is to begin May 10. All aamplera should be installed and all arrangements completed by that date.
1. Scrubber Effluent
a. This stream is expected to be*~ 120 gpm. It should contain 1.5 - 2% HCl and less than 20 ppb PCB.
b. The Environmental Control Group (ECO) will Install a sampler to take 8 hour composites.
c. The department operators will collect 1 sample/shift during start-up and deliver to the lab.
d. Caraway's group will analyze for PCB and total acid and report to both the department and the ECO.
e. The department will use the analysis for optimization and control. The ECO will report from a stream pollution standpoint.
2. Settling Basin
a. This will be a Intermittent flow and la expected to average less than 2 gpm. Less than 100 ppb PCB la expected.
b. The ECO will Install a sampler to oolleot 2k hour composites.
o. The department operators will oolleot one pample/day during start-up and deliver to the lab.
d. Caraway's group will analyze for PCB and report to both the department and the ECO.
e. The department will use the analysis for monitoring the settling basin operation. The ECO will report on PCB losses.
'N IO My;
DSW 296169
STLCOPCB4066113
. Vi,
C. 7. Buckley (3) Pollution Monitoring Aroclor Incinerator
Page 2 4/13/71 WOK
>v-
3* Department Sewer
a. This sewer should carry all the water leaving the Aroclor Incinerator Department.
b. The ECO will install a sampler to collect 3 day sewer composites.
c. During start-up the ECO will pick up the samples and deliver them to the lab.
d. Caraway's group will analyze for PCB's and report to the
ECO.
.
e. The ECO will report #PCB/day loss from department.
4, Stack Sample
a. This stream will be 6500 scfm at l6oP and about 50$6 water.
b. The John Zink Co. performance warranty specifies:
1) < 5# HCl/hr.
2) <.05 grains particulate/scf
3} <20 micron particles
,
4) <50 ppm Cla
5) <.0025# PCB/day
c. The ECO has agreed to establish the sampling methods for determining these properties.
d. During start-up* the ECO with sample the stack (nozzles provided) l/day* 5 days/week and arrange for analyses.
e. The ECG will report the results.
f. If these specifications are not met* additional samples within the process may be required.
g. Dept, personnel will also be taking stack samples for Orsat analysis to set the percent excess air.
If there are any points which are still unclear* please contact me. `
ap
*
A. L. Rasmussen Mfg. Rep.
x
DS\N 296170
STLCOPCB4066114