Document QXJoX2a22Zxae3G73a8QDd0Q6
HOMMTO CCHMMT mhstoh run
5TAVQA10 ONSATXM XamOCTIOM July 1944
MONS 056844
MONSANTO COMPANY ANNISTON, ALABAMA
STANDARD OPBATINO INSTRUCTIONS POM
lovUod: July 19*4
Copy No.
AT
Preperod by: J. V. Molloy Production Supervisor
R. 6. Moody Production Superintendent
CONFIDENTIAL
HONS 056845
OPERATING IHtnDCTIOM AgOCLOU
OTMWIWE
Plant Manager Produetion Superintendent Production Supcrvlaor Nalntananca Superintendent Technical farvlcaa ^`^-a.Standarde Dopertnent
1 1 10 1 1 2
HONS 056846
OPERATING INSTRUCTIONS
SECTION A - synopsis or raocESs
SECTION B - SAFETY AND HOUSEKEEPING
SECTION C DETAILED INSTRUCTIONS
I. ChloriMtors & Blowing Tank Operation
a. Batch ChlorlMtor Operation b. Continuous ChlorlMtor Operation e. Slewing Tank Operation d. Method of Running Specific Gravity e. Method of Running Bold Polnte f. Method of Running Softening Points g. Chlorine Vaporiser h. Trouble Shooting ChlorlMtor A Blowing Tank Operation
II. Aroclor Stills, Earth TrMtuant, and Plltratlon
a. Charging A Start-up of Aroclor Stills b. Stopping the Distillation c. Drawing Bottom d. Earth TrMtaant of Aroclors
a. Plltratlon of Aroclors f. Trouble Shooting Aroclor Stills, Earth TrMtMnt,
and Storage Operation
III. Loading Refined Aroclors
a. Spotting Tank Cars b. Pilling Tank Cars c. Pilling Drum
IV. Picking Aroclors
V. Crushing Aroclors
VI.. Killing Aroclors
VII. Spe&al Pyranol Mixes
a. Inertaen PPO b. Aroclor 1260 - Toluene c. Aroclor 1262 Toluene d. Aroclor 1262 - Ijrlene a. A13B3B
SECTION D
EMERGENCY PROCEDURES
HONS 056867
OPERATING INSTRUCTIONS AROCLORS
SYNOPSIS OF PROCESS
General
Aroclora are tha rMctlon product! formed bp chlorination of Biphenyl and/or Tarphanyli using Farrlc Chloride catalyst. Tha by-product HC1 |U producod la abaorbad In water to produce Mirlatle Add. Crude Arodora are produced In the chlorinetore, air blown, dlatlllad, earth treated, filtered, and loaded for ehlpnant,
Aroclor la a trade nane uaad to designate chlorination producta of Biphenyl, Tarphanyle or elxcuraa of the two, Tha phyelcal propertlea
very fro* light free-flowing liquid! to cryatalllne and non-cryatalllne aollda. Depending on tha degree of chlorination and the coqpoaltlon of the raw natarlala, Santewax R, and mixtures of Biphenyl and Santowas R,
or Biphenyl and Santowas C, yield producta of lnereaelng vlacoalty up to non-cryatalllne raalna.
A numerical ayetaa of nomenclature, conalatlng of four dlglta, haa been developed for Identifying the Aroclora. The thouaanda digit denote! the raw material uaad In the chlorination. The figure 1--- Indicate! 100X technical grade Biphenyl. The hundreda digit denote! whether or not the product la dlatlllad. The 1--- lndlcatea undlatUlad, and the figure 2-- lndlcatea dlatlllad. The tana and unita digit denote the approzlnaca percentage of chlorine contained In the flnlahad product. For example, 1260 la a dlatlllad chlorinated Blphanyl containing 601 chlorine.
There era deviation! fron tha above nomenclature when Solid Aroclora are produced. There are Hated belewi
1. Aroclora 4065 and AA63
Aroclor 6065 la the crude and 6665 la obtained by dietlllation. The atarting raw arterial contain! 601 Santowas R and 601 technical Blphanyl. Thla la chlorlnatad to 651.
2. Aroclora 5060 and 5660
Aroclor 3060 Is the crude from which Aroclor 5460 It dlctlllod. The atarting raw material ia 100X Santowax R which la chlorinated to 60X.
3 Aroclor 3062 and 5442
Aroclor 5042 ia the crude from which Aroclor 5442 la dlatllled* The atarting raw material la 100X Santowax R which la chlorinated to 42X
4 Aroclor 2565
M0M5 056848
Thla ia an undlatilled product. The atarting raw material conalata of 251 Santowax c end 751 technical Biphenyl. Thla la chlorlnatad to 651.
opbutihc nsnuciiom
aroclou
2.
SYNOPSIS Of PROC188 (Coat'd.)
Chlortnator Aim
Thar* ara four batch oparatad chlorlnatora and on* conttnuoua oparatad * chlortnator syatw. Tha conttnuoua ayataa conalata of four batch chlorl natora cascaded with overflow frow ona unit to tha nant. Tha product froa tha laat stags la tha flnlahad crude Aroclor.
Batch chlorlnatora ara charged with 3,000 lba. of Biphenyl and/or Tarphanyl with 1% lba. of Ferric Chloride catalyat. Chlorine gee addad through a dletrlbutor plate raacta with tha raw natarlal to ralaaaa OC1 and heat. The HC1 gaa goaa to tha Muriatic Acid Departaant. Heat la taken away by water cooling colla In tha chlortnator. Tha epeelflc gravity of the crude la checked every two houra until tha ehlerlnatlon la eoaplata.
In tha conttnuoua chlorination ayataa Biphenyl la fad to tha flrat ataga and chlorinated. Crude Aroclor overflowa to tha eecond ataga, ate., -- until tha final product overflowa froa tha laat ataga. lach chlortnator la held at a different level of ehlerlnatlon with tha laat ataga being tha final crude Aroclor dealrad. goraally Aroclor 11*2 la produced In thla ayataa.
Crude Aroclor* froa tha batch chlorlnatora and tha conttnuoua ayataa ara tranefarrad to a blowing tank to ba air blown for ona (1) hour alulaua before dlaeillatlon.
tUl tea*
Llculd Aroclor*
Aaratad Aroclore froa a blowing tank or a faad tank 1* charged to a till, hydratad llae la added, a vacuua of 720 aa Hg (*0 aa Hg absolute) 1* applied, tha atlll furnace la fired, and tha Aroclor la dietllled Into a receiver. The ilitlllatlon la awl-conttnuoua alnce tan (10) recalvera ara dietllled prior to drawing bottoae or realdua froa tha atlll. Ivary two recaivara ara treated with A0 lba. of earth for three hour* and than filtered. The flnlahad product la transferred to storage tank* prior to loading Into druae or tank cara.
Solid Aroclor*
Solid Aroclor* are distilled In a stellar aannar to Liquid Aroclor* aneapt for 116S. Aroclor 1168 la not air blown and 1* charged directly to the still froa tha chlortnator. A vacuua of 4 a Ig abaolut* Is applied for distillation. Ona racelvar of 1266 Is dlstlllod prior to drawing bottoas In tho still. All other Solid Aroclors have 2 or A racelvar* distilled prior to drawing bottoas In tha atllla.
Solid Aroclor* ara not earth treated or filtered. They ara druaaad directly free tha racelvar or ara flaked (Aroclor* 1268 and 5460).
HONS 056849
MOWS 056850
OPERATING INSTRUCTIONS AROCLORS
SAFBTY AMD HQU3"TMPPIG
Safety of oporotiono in tho Aroclor plant depends on tho Individual operator, tutorial* being handled and oporotiono aust bo oboorvod closely to guard agalnot tho following:
Cauao & Action to Pravont
1* Chlorlno Gaa
Chlorlna gaa la a vary tonic corrosive gas. Leaks or high pressure can occur to liberate it.
Action to Pravont:
a. Report Chlorine gas exposure lanedlately for treatnant with Antidote. Milk nay be used in
olid cases to relieve throat irritation. Oxygen fron the reouseltator in the Dispensary is available.
b. Keep gas nask in good condition. Keep a good canister in the nask. Use these type Masks only in Chlorlno concentrations to 2-31 Chlorine in air.
c. Use a Scott Air Pak in concentrations ef Chlorine
gas above 31 in air. Three units are available
la the Aroelor-llpheayl Papertnant.
.
d. If caught in Chlorine gas without a nask, hold your breath and go cross wind until you are out of range of the gas. Place a handkerchief over your nose in snail quantities ef Chlorine.
e. Report all Chlorine leaks for repair lanedlately. Make tasporary repairs with tape if possible.
f. In case of a najor Chlorlno leak the source of Chlorine gas Must be stopped.
2 Thornal Burns
Notify the Chlorine Plant lanedlately if the pressure on tho Chlorine oanlfold exceeds 30 pslg. Cut off liquid Chlorine fron tho car.
Contact with hot uninsulated product lines
at the ehlorinetors and still areas.
Contact with uninsulated steaa lines and open
stesm.
'
Contact with hot Aroclors fron broken lines or
leaks.
Contact with open flaaes at stills or fren
heating lines in the departneat.
HONS 056851
OPKKATIBG XH8TRUCTXOH8 AROCLGRS
2
S. 8AFKTY AMD HOCSPCRKfIMG
Action to Prevent:
2. Therwal Burnt (Crat'd*)
Know thtt contact with equipment and
product will causa a tharaal burn dua to tha high taaparaturat* Hake changes In oparatlont with this hasard In nLad.
b. Know tha first aid traataant for burnt. Cold Uttar Traataant (Saa Appendix A Kaargancy Section).
c. Wear gloves and long sleeve shirts with tha alaevea rolled down when operating* Cloves and clothing can aake the difference between first and second degree burns*
d* Report unintultaed lines for repair of insulation
a* Use only steea lines with hose and hose claaps in good condition.
f. The following operations are hasardoua and should be done with care:
(1) Catching sables at the Aroclor chlorlnetor circulating puap*
(2) Stapling the Solid Aroclor still receiver.
(3) Drawing bottoas on the Aroclor stills.
3* Ixploflra
An explosion could occur la tha chlorlnators by slugging liquid chlorine to tha dis tributor or shutting off the water die* charge valve on the chlorlnetor cooling coll. Slugs of Liquid Chlorine could react fast enough to causa excesslva pressure in the vessel. A rupture of the chlorlnetor could occur. Closing the water discharge valve on tha chlorinator cooling coll isolates water in the coll. Aa tha reaction occurs releasing hast,
the water will vaporise and could split a coil and tank.
Action to Prevent:
a. Observe operation of the Chlorine vaporiser and do not let liquid Chlorine get into tha rotaaetar*. Pipe Unas will be frosted.
MQNS 056S52
ophatiib mmxriais
3
HAwrnr amp nmmnT 3. Sacploelan (Cont'd.)
4. rail*
b. In eaaa Chlorlna land llnaa ara fronted, cloaa liquid Chlorlna faad valve to tha vaporlaar. Chaok eteaa addition es tha vaporiser. Inapoet operation of tha vapor1tar. Do not atart up until aourca of troubla hat baan loeatad.
c. Do not data value In vatar discharge llna fron tha ehlorlnator eoll.
d. Obaarva tanparatura of tha ehlorlnator periodically and ba aura It la not too hot (180C narlniaO.
Slipping on eaaant floor*, atalra, Aroelor on floor, lea eondltlono; tripping over objects (boon, plpa, valva handlaa, ate.); or losing footing on laddera, ate., ean cauea falla.
Action to Prevent:
a. Tha najorlty of nlnor, aarloua, and naar nlaa injuries In tha Aroelor Dope, ara tha result of falla. Prevention la always within tha ability of tha operator by uaa of anpart operating praetleaa.
b. Tha following ltaas ohould ba donas
(1) laturn hoaa to raek aftar uaing.
(2) leap operating areae elaan of all foreign objecta.
(3) latum laddera to racka whan not In uaa.
(4) leap florae on and hands out of poekata, aapaclally going up atalra.
(3) Place guarda around any area that praaanta a haaard that ohould ba guarded.
e* Poor lighting duo to burned out bulbe ehould ba corrected at once. Poor light* lng due to Inadequate faeilltiea ehould ba reported.
d. Spllla nuat ba elaanad up laaediately following thalr occurrence. Report any aplll that ean net ba elaanad up within tha ahlft to tha Chief Operator. Spllla ara to ba reported In the log book.
HONS 096853
OPESATXNC UtSTHOCTIOHS AROCLOgS
4
SAFETY AMP ursnisrsvfmff
3. Fires
Flras can occur by:
Biphenyl, Santowax R, or Santowax C Ignition. Chlorine problems io tha vaporlaar allowing raaetion with steam to ralaaaa Bydrogan. Furnaca buxnar backflra.
Rood, rags, or papar on hot linos. Sparhs from waldlng apparatus or
open flaass.
Action to Prevent:
a. Araa Bust ha elaar of trash or -------* 1 aatarlala. Use trash sklpa and cans.
b. Smoka only In araaa ao designated.
e. Daa spark producing aqulpaaat only with a firs psralt and propar lnapactlon.
d. Use cars In lighting gas torchs or tha still furnaces.
a. Plra fighting aaulpnaot includes:
(1) Iwo whaalad dry powder units. (2) Boss houaa with 200 ft. of hoaa.
(3) ire dry powder band extinguishers, One COj hand watlngulshar.
(A) Two 3/4" water hoaas.
(3) Hoaa connection north of Santowax. (6) Scott Air Faks.
(7) Fire truck In flra house.
. Observe visitors in the plent end be sure they observe safety rules.
4. Tha following la a list of tha chemicals handled In tha Aroclor Flant operations and tha precautions to be taken during their handling:
a. Chlorine Gas
Chlorine la s vary toxic corrosive gas. Laaks or back pressure ean occur and llbareta chlo rine gas In tha araa. Operators should have their cartridge type respirators handy at all tlaas while In the area. Use of gas nasks is explained In Section B-l.
MONS 056854
OPERATING INSTRUCTIONS AROCUhS
5.
8A?m ao aopsaapme
6, a. Chlorine Gas (Cant'd.) If you ars caught without a gaa wash and largo aaounta of ehlorlaa gaa ara liberated, hold your braath and go croaa wind until you ara out of rango of tha gaa. Onca out of tha araa, obtain an amargancy gaa aaafc and raturn to tha area and eerract tha trouble
A victim of ehlorlaa gaa fuoaa muat be ramoved aa quickly aa poealbla from tha gaeaoue araa. Place patient on hia back with head and back elevated. Milk nay be need In nlld cases aa a relief from throat irritation. If the patient hao stopped breathing, start arti ficial respiration tunedlately.
b. Blphanyl
Biphenyl la a flammable notarial which will burn. Burning should not be dona In tha presence of Biphenyl or Biphenyl vapors. Tha malting point la 66.7C., flash point 10B*C., tha firs point 124aC., and tha auto Ignition
tanparatura la 258C. Inhalation of Blphanyl fumes la not raconmandad since It can cause a drugged effect on the parson.
c. Santowax 1
Santanas 1 la a flannabla material which will burn. It la relatively non-tonic to human beings. However, tha vapors of Bantowax B ara Irritating to tha mucous membranes and broolchlal tract. Prolonged breathing of tha vapors should ba avoided. The malting point la U0C.
d. Santowax C
8u Ac gantewax R, cine* It la the crude aurlil prior to distillation.
a. Barrie Chlorlda
Ferric Chloride is a black-brown olid. It oauaaa only slightly irritating effects on the skin or xucous aNbraniio When hoAtod It will docoapoA* end roloAA# toxic fuses of HC1 (hydrochloric ccid) It alii react with water to produce toxic end corroeive HC1 faxes.
f. Actapulgua Barth
This Material la a dried earths lie danger in handling, Wash off with water to eleen.
g. Hydrated Uat
Mo particular hasard In handling thle material The duet is irritating to the eyes end skin and should ba washed off with waters
h. Cruda Aroclera
Crude Aroclor* ara hot tinea ell ere handled In ttaaa traced or jacketed Una*. They can easily cause thtrstl burns In contact with
MGNS 056855
OFESATIBG IHSTkUCTIONS AROCLORS
6
SAPITY AMD H0081K1RPIHC
(. h. Crude Aroclara (Coat'd.) the akin. Prior to air blowing, tha notarial baa HCl funaa antralnad In It which arc Irritating to tha akin or nuooua naUbranaa.
1. Hydrogan Chlorlna Oaa
Ihla a eorroalwa gaa which la tonic. It la Irritating ta tha wucoua naabranaa, to tha ayaa, and to tha raaplratory tract. It will raact mth watar ta fora Hydro chloric Acid.
J. Still lotti kaaldtaa
Puaaa tram atlll bottoaa ara tonic. They ara aztranaly Irritating to tha aucoua naabranaa,to tha ayaa, and raaplratory tract.
Honsropae
Tha Aroclor chlorlnator and atlll oparatora ara raaponalbla for houaakaaplng during thalr afalft. Good houaakaaplng la tha nark of good oparatlona, aafaty practical, quality, and coata.
Houaakaaplng dutlaa ara aqual la loportaaea mth all other operating dutlaa.
Poor Practical
Action to Prevent
1. Hoaaa, valva handlaa, dip
a. Replace after naa.
atlcka, rage, and othar
natarlal on ground or floor, b. Hava place to atore all neceiaary
operating alda.
c. Haport naeda to auparvlalon.
2. Product laaka
a. Tighten valve packing glanda and flange bolta.
b. Report laaka to Chief Operator for nalntananca alteration.
3. Traah and crude drum
Contact chief to have druna novad fran
area.
b Uaa traah ekip in area
HONS 056856
A. Product apllla or dean out naaaoa
a. Prevent necessity of cleen-out by keeping treeing, IneuLetlon, or Jseket In good repelr by getting iteas turned in for nslntensnce work.
be Spills nust b cleenod up when they ere node. Clesn up vlll continue through the following shifts to finish ths Job.
CHLORINATORS
HONS 05685?
OPBtAIINC rnmUCTIOH AkOCLCBS
C. DETAILED IH8TRPCTI0BS
I. Chlorlaatorc and Blowlnz Tank Operation
Crude Areclora era produced bp batch aal conttnuoue chlorination In a TerClcal vassal. The reaction lo cooled bp water In an internal coil and agitated bp a circulating plug). llphanpl, Santowaz, or a nlxtura of tbo two la chlorinated with Chlorina gaa added at the bottoa of the vaaaala. PCI gaa ranted at tha top of tha ohlorlnator ia a bp-product which la recovered in the Muriatic Acid Dopartacnt. Crude Arcelor produced in batoh ox eontinuauc ehlorlnatara le trana-
farrad to the blowing operation whan tha chlorination la completed. Chlorine gaa can ba fad to tha chlorlnatora fron tha Chlorina Plant or fron tank care.
a. Batal^CUarinator_0graeion (See Plow Sheet)
(1) Charging Chlorlnatora:
(a) Chargee for tha various crude Aroclora arc as fallows:
Product
Apoclor 1121 H 1142 H 1148 < it 1154 ft 1140 tf 1162 ft 1168 ft 2563
-. ft 4063
ft 5042 ft 3060
law Material
Tank Innaaa or Outaao
3,000 lba Blphooyl
3,000 n
tt
3,000 n
tt
3,000 n
n
3,000 tt
it
3,000 tt
n
3,000 If
H
1,870 lba. llphanpl A
630 lba. Santowaz C
1,620 lbt. Blphtnyl k
1,080 lba. taatovtt B
3,330 lba. Santowaz 1
2,300 lba. Santowaz 1
68" 68" 68V 68V 66'.' 68" 68V
If Crude Aroclor 1142 la to bo uaod to ehiru a> batch chlorinator for 1148, 1154, 1160, 1162, or 1168, tha following anounts will ba uead. ferric Chloride la not added to thle notarial.
Source of 1142
Inchoc of Material
Crude Aroclor Blowing Tank
IS"
Crude Aroclor Catch Tank
SOX of Taplor Inatrunent
Each charge contalna lb lba. of faxrle Chloride.
HONS 0S6858
HCL LINE TO MURIATIC ACID ~ ABSORBERS
IBIPHENYL
,,
1SANT0WAX 1 tj
CHLORINATOR
. BLOWIN8 TANK PUMP
TO POOP
TANK OB STILLS
CHLORINATOR C1ACULATINB PUMP
_ BATCH CHLORINATOR. OPERATION --
: -FLOW SHEET -- - .
MCNS 056859
wrcr
ANWITOH PLAHT - MONSANTO CHEMICAL COMPANY - AHHIBTON. AUL
I BATCH-gHLOWirtfATQft OPERATION -- FLOW CHKK.T:
BRAWN f EAE
APNWP ' .. '
""" ..
ATS 0-7-64
KAU NONE
PCPT.
AROCLOR TS-A-701
OPERATING INSTRUCTIONS AROCLORS
2
DBTAXLRD INSTRUCTIONS
X. a. (1) (b) Drain tha cbarta tank and charging Xlna if tha nan eharga la to ha different fron the Xaat nix.
(c) get valvaa to receive a ebarga froa tha Biphenyl or Santowax Dapartnanta. Notify the operator yon era ready for a charge. Biphenyl la obtained froa tha #1 or #2 Biphenyl catch tanka or tha Biphony1 atoraga tanka. Santonax R or Santanas C'la obtained froa the Santanas atarage tanka. A aeraal 3,000 Xba. Biphenyl charge la 39 inchea image In tha charge tank for Biphenyl and 2B inchea innaga far Santanas. Ba aura ataan la on all tranafar llnaa prior to atartlng tha tranafar of Biphenyl or Santonax.
(d) Ona and one-half (1%) pouada of ferric chloride la . lurried in Aroclor and dunpad into tha charge tank with each chlorlnator charge. Start tha agltacar la tha charge tank and let' it run 13 nlnutaa prior ta charging the ahlorinator. Material in thia tank aheuld ba a nlninm 100C. nfaen charging a chlorlnator. A ataan eoll la in the tank to nalntaln tha tauperatura.
(a) Cloaa tha 2" chlorine valve into tha chlorine diatrlbutor on tha chlorlnator.
(f) Open tha vent valve on top of tha chlorlnator.
(g) Open valve on charging line to tha dealrad chlorlnator. Chock to be aura tha valvaa are cloaad to other chlorl natora.
(h) Sat valve at charge tank to tha chlorlnator. Start tha charge tank pum-
(1) Make certain tha charge la puling by obeervlng a drop in tha level of notarial in tha charge tank.
O) Chock tha charge tank te be aura it la aapty. Step tha charge tank pum-
(k) Alim tha ebarga llna to drain back through tha punp into tha charge tank.
(l) Close valve under tha charga tank, in charging lina at tha chlorlnator, and at tha vent line on tha chlorl nator.
(a) Sat tha valvaa on tha chlorlnator to circulate tha notarial fron tha botton of tha chlorlnator into tha top.
MOMS 056860
OPERATING INSTRUCTIONS AROCLOKS
3
DETAILED HMTRUCTIOW
I. a. (X) latch Chlorinator Operation:
(a) Start-up, Shutdown, and Normal Operation,
Assuming tha chlorinator hat baaa co^letely shut dawn, atart-up la aa follows!
1. Make up a charge far tha chlorinator and trauefer aa In tha procedure (t) above.
2. Material in tha chlorlnaters nut ha 120*C before starting the chlorination. Check tha nultl-palnt temperature'recorder. Steam can ba put In tha call of tha chlorinator to bring tha tcoloratura up If necessary. After atart-up cooling water will ba put in the coll.
3. Chlorine gaa la available from two aoureae--the Chlorine Plant and tank: care. Chlorine praeaura on the nanlfold ehould ba 20 to 23 palg noraally. Chlorine vaporiser aparatlooa art In Section f.
A. Open valve 1/3 to 1/2 on Inlet rotameter to tha chior1netor to ba started up. Open outlet valve wide open.
3. Open valve on line to tha chlorine distributor at the chlorinator (wide open).
6. Adjust rotaaetar at chlorinator header to a 600 lbe/hr. chlorine reading for ona (1) hour. After one hour tha chlorine rata can ba Increased to 800 or 900 lba/hr
7. Cooling water to tha coll In tha chlorinator can ba regulated to maintain tha operating tes^erature of tha chlorination aa noted on Table I, Page 4-a . As the chlorine feed la increased noraally, tha water rata must ba Increased.
S. Baaplas ara taken at tha suction line of tha circulating puap at tha bottom of tha chlorinator. Dependant an tha material being produced, tha specific gravity, softening point, or hold point, are run on all tha batch chlorlnatora every two (2) hours or odd numbered hours (7, 9, 11, ate.). On Iona of tha higher chlorinated products samples are not started until Che chlorinator has boon on for four (A) hours.
9. Whan the chlorination la near completion It nay ba nacaaaary to run tha specific gravity, softening point, or hold point every 10 to 13 ainutas.
M0NS 056861
opera;idg hbtructiohs AROCUX0
DITAIUD IHSTRPCTIOWB
4
I. .
(2) () 10. Whan the chlorination has ban coaplatad (Su Table I w Pt|a_W)( abut off the chlorine food valva to the dietrlbutor at tha chlorlnator.
11. Rota tha chlorlna praaaura on tha naln haadar. If It la above 30 pslg notify tha chlorlna plant you hava rsnored a chlorlnator or ehlorlnatora frao operation.
Tall than whan you can atart It back up. If noro than ana chlorlnator la to bo off at a tlao, notify cha chlorlna plant prior to abutting off tha chlorlnator.
12. Maaaura tha outage of tha blowing tank to ba puapad
Into.
.
13. Bat valvea an tha chlorlnator to pia^ out line to allow tranafarrlag to tba desired blowing tank.
14. Cloaa value an the chlorlnator pu^-aut line, atop alroulatlng pu^p, and naaaura outage an tha blowing tank.
13. Record tramfar Infornatlan an each chlorlnator la tha lag book. Rornal blowing tank lnaagee are:
kSSiSL
Blowing tank Innate .
1121 1140, 1134, 11(0, 1162
3060
14" 16-10"
20"
16. The chlorlnator la new randy to start back up.
ROIBt
If thin chlorlnator kaa had 1160, 1162, 1160, of 3060 In It, and It la to ba ahut down for 2 or 3 heura, waah tha chlorlnator out with approzlaetaly 100 gallona of 1142.
(b) Tanporary ahutdown of a chlorlnator:
During nornal operation, failure of chlorine feed, a tank car acting, or a cutback at tha chlorlna plant can cauaa abort shutdowns an the ehlorlnatora. Rornally If a partial reduction In chlorine food occurs, tha centlnuoue
systan la abut Off and batch ehlorlnatora are operated.
1. (hut off tha chlorlna valva at tba distributor on tha chlerlnator or ehlorlnatora as nacasaary.
2. Check tha chlorlna haadar praaaura and rotanatar faad to other ehlorlnatora. It should ba 20-23 pslg.
HONS 056862
MONS 0 5 6 8 6 3
4iai
mu i crtnATino camniaa
Anfpq/n
TTa
LIQUID 4UCIXU
1162 UB 1156
lltt HSI
SOLID 4HOCL06S 1168* 2565* 6065*
Chlorlaator Chars*: Blphaayl (U>.)
3,000 3,000 3,000 3,000 3,000 3,000 3,000
1,870
1,620
Santomn C
630
Santovax
1,080
AfprdMt Pound* Chlorine Mftilrtd to product Batch
1,600 3,330 5,360 7,060 6,030 6,660 12,760 9,300 10,100
Chlorination Taap.i Beginning
130% 130C 130C 130C 130C 130C 130%
160%
160%
Ending
140C 150C 153% 135% 160% 160% 265%
160%
210%
Final Specific Gravity 1.150
langa
1.160
9 63%
1.366 1.357 9 65C
1.610 1.620 9 63C
1.500 1.510 9 65%
1.556
1.372
9 90%
1.562
1.366
9 60C
Hold Feint
153 173%
Softening Point
66 72C
22
72%
Height of Crude Batch
3,750 5,060 3,550 6,350 7,160 7,365 7,060
6,660
7,160
Solid Aroclori
5042*
3,330 3, 630 160% 240%
50 56% 4,250
5060*
2,500 7,500 160% 250%
105 115% 6,000
OPERATING INSTRUCTIONS A&0CL0R8
DETAILED INSTRUCTIONS
5.
I. a. (2) (b) 3. Check to that Liquid chlorine is being fod to tho vaporiser and that steam it on the vaporiser. Steam praaaura ahould ba 10 pslg. Diacharga pressure an tha vaporiaar should ba 1 to 2 psig graatar than tha praaaura on tha chlorine header. (Normally 25 palg on air regulator valve setting).
4. Notify tha chlorine plant of tha problem and sea if they have shut down or cut back.
5. If tha shutdown la to ba longer than two hours, it ay ba necessary to put staaa on tha chlorinetor coll to keep the temperature at 120*C minimum. Normally the circulating pimq> will continue to run.
6. Shutdowns should ba minimised. If tha causa of tha cutback can easily ba remedied, start tha chlorinetors back up Immediately.
7. Notify your Chief Operator or Department Supervision immediately in ease of a problem.
(c) Prolonged Chlorinetor Shutdown:
Operations can occur which will require a day or longer shutdowns. Normally a chlorination will be finished and pumped out as in normal operating procedure (a) above. The chlorlnator will be shutdown completely and the cooling water cut off tha coll. If maintenance personnel are to work on the chlorlnator it may be necessary to vent the
vessel and purge it with COg.
NOTE:
Chlorine valves on the main header to the ehlorinater will be tagged out as well as transfer lines into the vessel. The circulating pump or circuit breaker box switch will be tagged out.
b. Continuous Chlorlnator Operation (See Flow Sheet)
The continuous chlorlnator operation consists of four cascade flow chlorlnaters in series where specific levels of chlorination occur. Biphenyl is fed into the first chlorlnator where the material is
chlorinated and overflows to the second chlorlnator. This continues until the finished product comas off the final unit, flows through the continuous blow tank, and to the catch tank. Chlorine is fed to each chlorlnator continuously. This chlorination system can be reduced to three (3) chlorlnator* in seriss in cess problems occur with one unit. Normally 1142 is tha only liquid Aroelor produced on the continuous system, however, 1148 and 1154 can also be produced with the chlorlnators set for different levels of chlorination.
HONS 056864
OPERATING INSTRUCTIONS AROCLORS
DETAILED INSTRUCTIONS
6
I. b. (I) Charging Mix and Feed Tanka:
(a) Chack tha laval tn tba nix tank. Tha tank low laval annunciator alara aheuld hava soundod (Sat far 231
full). Sllanca tha alara by puahlng tha aeknowladga button on tha eontrol panal.
(b) Sat valvaa to raealva a charge of Blphanyl. Notify tha Blphanyl still operator to puup a charge te the alx tank. Fill tha tank te a 751 full level. Cleae the valve In tha charge line.
(a) Start tha agitator In tha nix tank.
(d) Add 3% pounda ef ferric chloride. Allow the Blphanyl and ferric chloride te nix until the faad tank raquiree filling.
(a) The feed tank low level alarn sounds the annunciator oyotan at 251 full in tha faad teak. The nix tank batch can ba dropped late tha faad tank.
(f) Stop tba agitator in tha alx tank.
(g) Open tha valve under tha nix tank and allow tha Biphenyl-
ferric chloride nix to drop Into tha faad tank. Tha laval Indicator In tha faad tank should indicate Approximately B3X full.
(h) Cleaa tha valve under the nix tank whan tha nix tank la aapty.
(1) Prepare another nix for tha Blphanyl alx tank aa noted above. Low laval alara In tha nix tank should sound.
(2) Continuous Chlorinater Operation:
(e) Start-up and Noraal Operation:
1. Charge each of ehe four chlerlnaters (#3, 6, 7, & 8) with Blphonyl aa In a regular charge. Start cir culating puaps an tha chlerlnaters. Saa Section C.I.a.
2. Chlorinate tha aatarlal to the following levels:
Stage lot 2nd 3rd 4th
Chlorinater 5 6 7 8
Soadflc Gravity
1.078 - 1.104 1.170 - 1.198 1.234 - 1.280 1.336 - 1.362
MONS 056866
opiratwc nsnucTiois AROCLORS
7
C. DETAILED raSIRPCTIOM
I. b. (2) (a) 3. Cleat the valve on the chlorine distributor on each chlorlnator vhan the eerract specific gravity level haa bean reached. Held this chlorlnator until all four are ready. It eay be neceeaary to put ataan on the chlorlnator to kaop the toapersture at 120*C.
A. Chock the llphanyl food tank to bo euro a ulx haa boon charged.
5. Sat the valvaa on the Slphanyl food lino to #3 chlarl nator to allow circulation back to the food tank.
6. Start the Slphanyl food puop.
7. Sat the valvaa on the overflow llnee at tba chlerlnatora aa foilowe. Crude froa #S chlorlnator to overflew to ft chlorlnator, #6 overflows to #7, #7 evarflews to #8, #8 overflows to the continuous air blow tank, and than to the crude Aroclor catch tank.
8. When all four chlorinetors have reached the correct apaclflc gravity laval, atart tha chlorine food to each of tba chlorlnatara (600 lbs/hr. on each) and
apaa tha valve to start Slphanyl food to #3 chlorl nator (2 GPU Slphanyl). (Sac Table II). Chlorine faad is adjuaead at tha retaaatara an #3, #6, and #7 chlorlnator* to aalntaln tha required apaclflc gravity level. Tha required specific gravity la sat on tha Taylor controller for #8 chlorlnator (noraally 1.330). The Accu Ray controller will adjust tha
chlorine faad autoaatleally to #8 chlorlnator to aalntaln tha indicated specific gravity. Horaally #3 chlorlnator chlorine food la lower than the other
throe chlorlnator*.
9. Saaplea will bo caught and tha specific gravity run on chlorlnator* #3, #6, and #7 ovary other hour on oven hours (8,10, 12, ate.). A saapla will bo run an #8 chlorlnator ovary 4 hours (8, 12, 4, 8,--).
10. Cooling water to tha coll In tha chlorlnator* can ba regulated to aalntaln an operating taaparature rang* In tha chlarlnaters at 120-160*C. As tha chlorine faad la Increased noraally tha water rat* oust b* Increased.
11. Crude Aroclor 1142 produced on tha #8 chlorlnator overflow* Into tha continuous air blow tank. Air regulatad to 5 pslg at thro* aanual control valvss la blown Into tha Aroclor. Tho crude Aroclor then flows Into the Crude Aroclor catch tank.
MOWS 056867
TABLE II
OPERATINS OF BIPHENYL FLOW & SPECIFIC GRAVITY RECORDER rcMTani.i.ins
7.
This procedure eterte with the FBC eet et annual end glvee etep-wlee change* to autoaatic end beck to aanual. Thl* le for the Teylor Recorder Controllere ueed on:
1. Biphenyl feed on the continuous ehlorlnetore end
2. Aroclor epedflc grevlty on No. 8 Chlorlnetor.
Ooeretion
1. FRC on annuel. Set point aoved to five desired flow es indicated on recording sheet
Switching FRC
WubkI
lal
Autottic
--
Adjust FRC eet point knob until control valve gives the desired flow indicated by Red recording pen.
2. Transfer FRC to seal.
Place eet pointer (Rad) opposite flow recording pan (Red).
3. Transfer FRC froa seal to autoaatic. Adjust FRC set pointer until flow levels out if any fluctuations occur.
The lnatruaant can be left in this position for autoaatic control of flow as the eet point is adjueeed.
Return Svetea to Manual Control
A. Note FRC output air signal. Transfer froa autoaatic to seal.
5. Adjust FRC set pointer (Rad) to the seaa output air.
6. Transfer froa seal to aanual. Adjust set point if fluctuations occur.
HONS 056868
OPERATING INSTRUCTIONS AROCLORS
a.
DETAILED INSTRUCTIONS
I. b. (2) () 12. A high annunciator alarn signal will lndicata whan to transfer aatarlal from tha cruda Aroclor catch tank. Tha high laval alarn la aat at 731 full tank on tha laval gauga. Whan tha high alarn aounda you normally have 30 alnutaa to (tart puap out or aatarlal baglna to back up and fill tha chlorlnator ayatan. Off-arada aatarlal will bo oroducad If thla occur!.
13. Crude 1142 any ba transferred to a blowing tank, tha #3 Aroclor still roof tank, to the charge tank, or to a batch chlorlnator. Normal operation la to a
blowing tank.
14. Sat valves to allow transfer fron tha cruda Aroclor catch tank to tha blowing tank.
13. Measure the outage on tha blowing tank.
14. Start tha aatoh tank transfer puap.
17. Whan tha laval In tha tank reaches 01 on tha laval gauga close tha valve In tha discharge line at tha puap. Stop tha puap.
18. Measure the outage In tha blowing tank. Record this lnforaatlon In tha log book. Approximately 30" to 36" of aatarlal will ba transferred Into tha blowing tank.
19. In routlna operation Cruda 1142 la sonatinas charged to tha batch chlorlnator charge tank or directly to a chlorlnator for chlorination to a higher Aroclor. A chlorlnator charge of 1142 la SOI of tha Taylor laval Indication gauga on tha catch tank.
20. This chlorlnator systan will continue to operate with tha following noraal operation.
a. Maks nix tank batches. b. Fill faad tank at raquirtd. c. Check specific gravity on Individual chlorlnators. d. Correct chlorine flow rata to Individual chlori
netora as required. a. Transfer crude produced In the catch tank as
required. f. Observe taaperature on tha chlorlnators and adjuet
water rata as required.
0>) leaporary Shutdown!
HONS 056669
During normal operation failure of chlorine faad for any reason can causa short shutdowns on tha continuous chlorinator systan. For temporary partial cut-backa tha batch systan is operated and tha continuous chlorlnators are cut
OPERATING IHSTRUCTIONS AROCLGRS
nrrtn.m TllSTtOCTIOWS
9
I. b. (2) (b) off. The batch ehlorlnaterc can be fed chlorine fron i car while the chlorine plant blows air to the contlnuoue unite. In caee of cut back to tha contlnuoue chlorlnatore proceed aa foilowe:
1. Shut off tha automatic Biphenyl feed waive to the #5 ehlorlnetor by ueing the autonatlc controller.
2. Cloee tha walvee at the chlorine dletrlbutor on chlorlnatore #3, 6, 7, end I.
3. Cloee the annual block valve at tha autonatlc Biphenyl food valve to aaeure no leakage oecure.
A. Proceed to check out eyeten to detarndne tha reason for tha cut back If you have not bean Interned.
Braapla:
bspty chlorine ear, chlorine plant cut back, failure of chlorine vaporiser, electrical falluraa.
5. notify the chlorine plant of the problan If It le In
the iroeler Dept. If the chlorine plant has cut back aek for how long. Start feeding from the chlorine ear.
6. If the shutdown le to be longer than two houre It any
be naceesary to put staaa on the chlorlnator coll to keep the teaparature at 120C nininua. Koraally tha circulating puap will continue to run.
7. notify your Chief Operator or Dapartaant Supervision In esse of a problan.
(c) Prolonged Chlorlnator Shutdown:
Operation or Inspection of a vessel can occur which will require a longer shutdown than 8 to 10 hours. In this ease the chief operator and dapartaant supervision should be contacted lneedlately.
(d) Contlnuoue Operation on 3 Chlorlnators:
Boutina Inspection of tha catalyst In the Aroclor chlori netors occurs every six aontha. At this tine a chlorl nator aust be shut down and taken out of service for f to 12 hours. In this csss tha following procedure should be followed to run 3 chlorlnatore continuously:
1. Switch valves on the overflow line froa one chlorlnator to another to allow by-passing a particular chlorlnator.
MONS 056870
OPERATING INSTRUCTIONS AROCLORS
10.
DETAILED INSTRUCTIONS
I. b. (2) (d) 2. Shut off tho Biphenyl food to tho flrit stage chlorlnotor. Chlorinate tho notarial to tho following lovolc
Stoto lot 2nd 3rd
*Chlorlnotot 5 6 8
8ooclflc Orovltv 1.108-1.124 1.224-1.240 1.343-1.335
NOTE: Indicator #7 chlorlnotor out of tho lyitan. Any one of tho four con bo by-paaeed.
3. Start tho Biphenyl food egaln.
4. Continue operetlon of tho contlnuouo eyetaa. The chlorlnotor raarrvod froa oorvlca ohould bo chlori nated to a flnlohod Aroelor and puapod out. Tho ehlorlnator will bo ahut down coaplotoly. Stop water flow to the cooling coll. If aalntanaace paraonnal earn to work on tho chlorlnotor It aay be necessary to vant the ehlorlnator and purge it with COj. Tho Chlorine In tho food line froa tha rotaaatar to tha distributor ohould ba ranted Into tha chlorlnotor and than ahut off prior to visiting the vaaeel.
HOTS:
Chlorine ralroo on tha aaln header to the ehlorlnator will be tagged out aa well aa tranafer linaa Into the vaaaal. Tha cir culating pap awlteh or circuit breaker box will be tagged out.
c. Blowlna Tank Operation
Crude Aroelore produced In the ehlorlnator! nuat be air blown for a alnlaua of one hour before the aatarlal la fed to the atllla. Staea la aalntalnad on the eolla of the blowing tank during thla operation, keaidual RC1 blown out of tha crude Aroelor la drowned In a S4K water Jet which pulle a auction on the blowing tanka.
(1) Tranaferrlng batch to blowing tank:
(a) Maaaura outage on blowing tank notorial la to be tranafarred Into.
(b) Set valvea In puap-over line ao notarial will be puapod only to the desired blowing tank.
(c) Open valva at ehlorlnator froa the circulating line into the puap-over line.
(d) Close valve in circulating line back Into the top of the ehlorlnator.
MCNS 056871
OPERATING INSTRUCTIONS AROCLOKS
PTOM PISHUCTI0N8
I. e. (1) () Cheek the blowing tank to ba aura Material it flowing Into It.
(f) Whan tba tranafar of notarial la coaplate, eloaa valva on tba pu^i-ovar llna and open valva In tba circulating linn into tba top of tba cblorlnator.
(g) Maaaura outage on blowing tank aftnr Material baa bean trana farrad. Note MaaauraMaata before and after tranafar in the log book.
bailee of Innaga expected are:
Crude Aroclor
Blow!nr Tank Innaaa
1121 114#, 1154, 11C0, 1162
5060
14" 16"-18"
20"
(2) Air Blowing crude Aroclora:
(a) Open the valve In the water llna feeding the Scbutta 6 Roarting drowning Jet.
(b) Cheek the blowing tanka to be aura tba Jet la pulling a
auction on the tanka. Open hatch on the lid of the tanka to faad the auction, than eloaa the batch.
(c) Open valve In air dletrlbutlon llna to at leant two of tba four blowing taaka.
(d) Open dlacharge valve on the air blower to be atarted.
(e) Cloaa dlacharge valve on the air blower to be left idle. <f) Start Motor on the air blower.
(g) Crude Aroclora tranefarrad to tba blowing tanka auet be air blown for at laaat one hour before feeding to the atlll.
(5) Tranafarrlng Material froa blowing tank to a atlll or root tank:
(a) Cheek Material In the tank to be aura it la the Aroclor needed and haa been air blown tba required length of tlaa.
(b) Turn ateaa on tranafar llnea and the puaqi.
(c) Sat valvaa In tranafar line to tank Material la to ba punped to. Notify atlll operator If tank la in hla operating area.
(d) Start blowing tank pu^>.
MONS 056872
OPERATING INSTRUCTIONS AKOCLOKS
12
DETAILED INSTRUCTIONS
I. c. (3) () Check level in the teak to be eure neterlel le being treneferred.
(f) When the trenefer le complete etop the pu^> end eloee the punp euctlon end diecherge velvee. Heeeure outege In the tenk.
d. Method of kunnlne SoecHlc Crevltlee:
(1) Ceteh repreeentetlve eeeple of neterlel In netel cylinder provided for thle purpoee. On the chlorlnetore, the ee^le point le et the pop euctlon or inlet.
(2) Teke eeeple to control room.
(3) Allow voter to run down outelde of cylinder while etlrrlng eeeple vigorouely until the eeeple le 10C ebeve the te^ereture et which the eeeple le run. See Chert I pege Je.
(A) Cut off the voter when the eeegile le 10C ebove the deelred teepereture. Keep etlrrlng until the eeeple le 1C ebove the teepereture et which ehc eeeple le to be run. Stop etlrrlng. Allow the hydroneter thet hee been thoroughly eleened to oink Into the eeeple until It reechee ogulllbrlue.
(5) Obeerve reeding on the hydroeeter. kecord on the operating dete eheet elong with the tine the eeeple wee token.
(S) In oeee the teepereeure wee off one or two degreec when ehe reeding wee token, e correction cen be epplled. Je le 0.001 epedfle grevity unite per C. If the eeeple wee 2c high, odd 0.002 opeclflc grevity unite to the reeding. If the ensile woe 2C low, eubtrect 0.002 epedfle grevity unite fron the reeding.
(7) Cerefully cleen the hydraneter end thernoneter. Piece then In reck provided for thle purpoee. Dvap eeeple In the 33 gel. drun for thle purpoee.
e. msha? .?(. Ramins.,Itel*
(1) Obtain ropraaantatlva ^1 of aitwlal from itapU lino at Ini at to pump Catch eeeple In a pint eon.
(2) Tha rocaptado for runnlnt tha aa^>la la 1*' x 4%" pyrax tuba aaalad at ona and. Tha tuba la inaartad in a aquara 8 ounca bottla which la Inaulatod in bottom by a layor of 1" aabaatoa flbor. Tha tuba la bald In plana by a larga cork. Tha inaulatlon la uaad In an affort to kaap tha Aroclor from cooling too rapidly.
(3) Pour tha matarlal Into tha tuba until It la fillad within IV of tha top.
(4) Tha matarlal will probably eryatalllaa in tha cold tuba and will hava to ba maltad again.
HONS 056873
OPERATING INSTRUCTIONS A10CLOR8
13.
C. nfTM'TTM ffTMCTIONg
I. e. (5) A aaterlal is netted, Insert e suitable thanoMtn (0-360C) which lc fitted with c cork to held It In plaea. The hulb of the thenoMtir should he fitted In the center ef the H^lt, cere being taken that It la net too eleea to the aide ef the tnhe.
(6) Beat the tube te 200C, place It In the eaheateo Jacket end than put It In the bottle*
(7) Taka reading, an the tbarnoneter every 30 aneenda. At flrat the tenperatura will drop rapidly (W*C between reading*). This drop will deeraaaa and finally eona to a (tap, and atay eonataat for eeveral raadlnge or will start te ge back op several dagreae.
(g) teeord the point at which the tn^ereture ranelna eonetant, or In
eaaa ef a rlaa, the hlghaat point ef the rlaa la the hold point ef the neterlal.
f. mt1!"*1 "f nirthi feftenlna Feint*
(1) Obtain representative aa^le of notarial fron sanpla lino at lnlat to pu^. Catch sanpla In eon 114 or pyren beaker.
(2) Boat ring and staple.
(3) Place ring on can lid or natal plata and fill with sa^le until notorial stands slightly higher than adgo of ring.
(A) Cool ring and lid fron button of sides until sanpla sots up, being careful not to gat any water on top of saaplo.
(5) Finish cooling by running water on top of saaplo, after it sots up.
(A) ksneve filled ring fron lid and trin off any notorial that is on the outside*
(7) Naha slight Indentation on top of sanpla in the cantor of the ring with a hooted wire to hold ball in place.
(8) Pill beaker with water or elycarlne.
(a) Use water when expected softening point is under S0C. (b) Use glycerine whan expected softening point is over 80C.
(9) Place ring in sanpla holder, place ball on sa^le and put holder in beaker.
(10) Adjust tbarnoneter in holder so that tip of bulb protrudes 1/4" through hole in eross bar that holds sables.
(11)
Place beaker on stand with sereea under it and set burner under the stand.
HONS G56S74
OfBRATlNG INSTRUCTIONS AROCLORS
14.
C. DETAILED INSTRUCTIONS
X. f. (12) Light burner end Adjust to give a teaperature rise no shown on tho theraoaeter of 5C por nlnuto.
(13) Bring teaperature up 5C por nlnuto until boll folio through oonplo.
(14) Record teaperature ot tine boll folio to lower crooo ber oo tho softening point*
g. Chlorine Vaporiser
Liquid Chlorine froa took core is vaporised in o shell end tube exchanger using stooa for hoot* Vaporised chlorine et 25 pslg enters the chlorine header to the Aroclor chlorlnstors. The vaporiser has the following safe guards:
(1) Chlorine level control on veporlsar*
(2) Steaa pressure regulator - aaintaln 10-12 psig ateoa pressure*
(3) Steaa control valve - regulated bp teeperature control of chlorine entering the vaporiser.
(4) Chlorine feed control valve to vaporiser*
(5) Chlorine feed pressure control valve to chlorine header froa the vaporiser discharge*
The controls for this unit are necessary to alnlalse the possibility of a chlorine leak or a fire. Excessive heat above 25 pslg steaa pressure will allow chlorine to corrode Iron at excessive rates. Boles will occur in the tube bundle and steaa will mix with chlorine. A reaction occurs to fora HCl gas and !* At these teaperstures a fire will noraslly occur aod the hydrogen will burn*
(1) Start Up Chlorine Vaporiser:
(e) Open aonual valve on the steaa line to the vaporiser.
(b) Set the vaporiser taaperature control at 65C to 70C to allcw the steaa control valve to open*
(c) Check to be sure steaa pressure to the vaporiser is 12 pslg or lower*
(d) Rook up take-off lines to the chlorine cor. Hear gas assk while asking this connection. Open valve on the car to take on chlorine when ear is connected. Open valve in the liquid ehlorlne line.
(e) Open the block valves on eaeh side of the autoaatle liquid ehlorlne take-on valve. Close the by-pass valve around the control valve.
MCNS 056675
OPERATING INSTRUCTIONS AROCLORS
15
DETAILED INSTRUCTIONS
I. g. (1) (f) Cheek the vaporiser level control to be sure It closes the liquid chlorine control valve when the vaporiser Is approxi mately one-half full.
(g) Sat the air regulator to the chlorine feed valve to the chlorine header. Set to Maintain a pressure of 25 pslg on the chlorine header. Open this valve slowly. This valve begins to open at 18 psig - It Is wide open at 30 pslg.
(h) Observe operation to be sure the chlorine header pressure does not exceed 25 pslg and the steam pressure to the vaporiser le below 12 pslg.
Nigh chlorine pressure can cause extras* problems at the chlorine plant and result la chlorine release to the atmosphere.
(2) Shutdown Chlorine Vaporiser:
(a) Close block valve an each side of liquid chlorine control valve.
(b) Allow Stsea to vaporise liquid chlorine in the vaporiser.
(c) Shut off block valve la steam line to the vaporiser or close the steam control valve by adjusting the sat point en the vaporiser temperature controller.
(d) Close the automatic chlorine feed valve to the chlorine header. Close the block valve in the line to the header.
(a) If the liquid chlorine car la to be disconnected do the following:
1. rut on gas mask for use in connecting and disconnecting car.
2. Close manual valve in 1" liquid chlorine line to vaporiser.
3. Close angle valve on top of the chlorine tank ear.
4. Break union on the pipe connection line. Slowly let the chlorine pressure bleed off. When pressure is released remove the piping.
h. Trouble Shootlns Chlotlnator and Blowing Tank Operation
HONS 0568 76
Problem
Possible Cause & Action
(1) High Chlorine Preaaure
a) Vaporiser feeding too much chlorine
en Header (30 pslg or more) from car.
Action: Check operation of vaporiser.
OPERATING INSTRUCTIONS AROCUJU
16
DETAILED m8TRDCTIOMB
I. h. Troubl ShootlnA Chlorlnator & Blowing Tank Ocmelon (Cont'd.)
KSfeig
Poaalble Cauae A Action
Action:
Cont'd. ct point of chlorine valve to the header (ahould be 23 pelg or leee)
b) Chlorine Plant nay be aending an exceee aeount of air.
Action: Chock with Chlolne Plant chief operator.
c) Two, three, or nora chlorlnator* nay be cut off.
Action:
notify Chlorine Plant chief operator. Sat chlorinecoca back In operation aa toon aa poeelbla.
d) Preaaura gauge could ba bad.
Action: Check other gaute. notify chief operator gauge neada replacing.
a) Talva toHCl Dept. or line could ba cloaad or plugged.
Action:
Check acid operator. Obaerve preaaura gauge on BC1 off-gaa lino. Open valve If cloaad. Go down drowning tower If tower Una la plugged.
(2) Chlorine leake
a) Leak at pipe Unea, flangaa, ruptured line, ate.
Action:
Daa anaonla bonb to find the lack. Shut off (valve off) leak fron ayatan If poaalble. noflty chief operator need for repair. Make taaporary repair or ehut down If nacaaaary.
HONS 056877
OPERATING INSTRUCTIONS A&OCLCRS
17.
DETAILED INSTRUCTIONS
I. h. Trouble Shooting (Coat'd.)
Problem
Possible Cause A Action
b) Pressure problem at Chlorine vaporiser.
Action:
Chock rupture dice or relief valve to >ee if they are blowing. Watch chlorine pressure on
vaporiser. Shut off chlorine fron the tank car and bleed the vaporiser pressure down.
c) Vaporiser tube leeks.
/ Action: Check steam pressure to vaporiser. May fall off. Check vaporiser chlorine pressure. Watch for chlorine leaks. Shut off ehlorlna fron the tank car and bleed the vaporiser pressure down.
(3) HCl fumes
a) Punas fron the blowing tanks.
Action: Check water pressure to the 861 jet (should be 30 pelg ninlnun). Check to see if a valve in the vapor line is closed. Water line to jet can bacons plugged with sticks, etc. fron the cooling tower. It ney be necessary to
* shut off air blower temporarily.
b) Punas fron the HCl off-gas line above the chlorinetors.
Action:
Check pressure of HCl header
(normally 1-2 psig). If greater it nay be necessary to go to the drowning tower. If necessary use aanonla bonb to find the leak. Make temporary repair or ootlfy ehief operator need for permanent repair. Valve off leak if possible.
c) Punas fron charging a ehlorlnator.
Action: Complete charging of the vessel and shut off the vent valve.
MOMS 056878
OPERATING INSTRUCTIONS
nKTAU.m INSTRUCTIONS I. h. Iroubl. Shooting (Coat'd.)
tiafelsa
Possible Causa 6 Action
Mtor. Be sure aexlaua water Is being used. Check coll to m if it Is plugging (water valve wide opsa & swell strata of water
flow) Check wstsr feed praasura to cooling colls (norwelly 60 pslg)
b) Chlorine food to high. (1,000 lbs/hr. or above)
Action: Reduce chlorine feed if additional water is not available.
(5) Leaking valve, pipe line,
flange, pump, etc.
a) Aroclore ere e herd aeterlel to contain
In pipe lines. The aeterlel Is hot causing
leaks.
Action:
Try to tighten up cm valve stuffing box, bolts at flange, etc. Notify chief operator If additional repair work Is needed.
(6) Plugged Linee
b) Leaks at puapa with aechenlcel seals or packing.
Action:
Notify chief operator the nachanlcal seal needs to be adjusted or replaced. On puaps with packing glands, try to tighten leaking gland plate. If leek can not be stopped, notify the chief operator.
e) Biphenyl, Sentowex, end Solid Aroclor linee plug easily when not hot.
HONS
Action: 056e?9
Check to be eure steea or hot Aroclor is on pipe line. If not, put ateea on end give it tine to heat up the line. Check pipe lines end valves for exposed ersee not ateea traced or Insulated. Use COj and try to blow tha lina out. Use e gas torch flame to heat the pipe line as a laat raaort.
OPERATING INSTRUCTIONS AROCLORS
19.
DETAILED INSTRUCTIONS
I. h. Trouble ghootlns (Cont'd.)
Problem
Possible Cause & Action
(7) Free Chlorine off Chlorloator
Normally fraa ehlorlna la ladlcatad la tha off-gaa vant Una at tha NCI abaorbor sever boa. Fraa ehlorlna Iona la a safety baaard aa wall as an excessive coat. It can ba caused by Inadequate reaction of tha Biphenyl and
nlfht Indicate formation of unstable Aroclors. If this situation can noe ba corrected Immediately tha following should ba checked:
Action: a) Gae samples of Aroclor from tha chlorlnatora
and check for water. if water la la tha Crude Aroclor It will boll and bubble mora than usual - appears to sisals. In easa water la found in a sample remove tha chlorlnator from aarvlca. Normally a hols In tha cooling coll will ba tha source of water.
b) Check chlorlnator temperatures on tha multipoint Coloratura recorder. Each chlorlnator should ba above 120C. Use
steam In tha colls to heat up If necessary. A quick Increase In chlorine will sometimes raise tha taaperatura quickest.
c) Check tha off-gaa settle for each chlorlnator and have the Lab run analysis for free chlorine. Isolate tha bad chlorlnator. Normally Lab analysis la light yellow to yellow In color. Rad Indicates excessive free chlorine In tha liquid chlorlnatora. Red color Is normal for tha solid chlorl natora. Resample a chlorlnator with ex cessive free chlorine. Remove this chlorl nator from service and see If tha problem of fraa chlorine Is solved.
d) Inadequate aswunts of catalyst present as Ferric Chloride or Iron turnings esn ceuse excess fraa ehlorlna In tha off-gas line. This situation should never occur since tha chlorlnatora are checked every six months. If It should, notify tha chief operator and department supervision lMedlately.
HOhS 056880
OPtRATING nnnUCTIORS ABOCLOU
20.
Trouble thootlna (Coat'd.)
froblf
() Leaking Cooling Coll In Chiorinatort
fwilUt Cauaa A Action
Corroaior In thn chlorlnatora oceaaloually ratultt in watar lank Into a chlorlnator. Hat chlorlna and HC1 |u ara axtraaely corroalvo and can eauaa axtanaiva daaage faat. Any laak ahould ka found and eka chlorlnator ranovnd from aarvlca iMadiataly.
Action: a) tanpla tha ehlorlnatara and ehack for water.
If watar It pratant in tha Crude Aroclor it will boil and bubbla nora than uaual appaara to cltxla.
b) Off color add at tha Muriatic Acid abaorbar nay lndlcata tha nolctura problan. Bxceoa eerroalon would put iron in tha HC1 gat and eauta tha towar add to be yellow inttaad of dear.
HONS 056881
STILLS
C. DBTAILIP IM8TRUCTI0M8
OPOUTING INSTRUCTIONS AJIOCLORS
21
II* Aroclor Stills. larth Treatment. And ?lltr*tlen
Aerated Crude Aroclor fro* e bleering tank or a roof tank la fad to the till tank. Bydrated line la added to the Crude Aroelor.
Vacuum la applied to the atlll and the Aroclor la circulated through the
furnace coll and heated to the vaporisation temperature. Vapora pace up an open column to the condenaer. Distilled Aroclor la collected in a receiver and then transferred into a blending tank.
Dlatilled Aroclor* are treated with Attapulgua Berth in the blending tank, filtered, analysed, and packaged or held in etorage.
Aroclor 1266 and all dlatilled Solid Aroclora do not receive earth treatment. They ere drawn directly from the receiver Into suitable containers or trans ferred to the flaker operation.
Still residue or bottoms from eaeh distillation ere sold as Montars or discarded.
a. Charaina and Start-Up of Aroclor Stills
(1) Charges for various Aroclora:
Under normal conditions Credo Liquid Aroclora ere charged con tinuously to the still from a blowing tank or roof tank to a 53 outage* Thla level is maintained by an automatic level con troller. Occasionally, Liquid Aroclora are charged batch-wise. When this la dome, Che crude le charged to e 23" outage. Aroelor 1166 le never charged continuously, since this crude is pumped directly to the still from the chlorlnator. This Aroclor is not air blown. Crude Solid Aroclora ere charged batch-wise to a 30" outage in the atlll.
(2) Prepare blowing teak for trenefer of charge.
(e) Check to be sure steam Is on the puaq> end charging lines. Matarlal to be pumped must be hot or it will damage the mechanical seels on #3 end #4 blowing tank pumps.
(b) Cheek tmq>erature of material In blowing tank to ba sura it la hot enough to transfer (120-140C).
(c) Chock with chlorlnator operator to ba aura Crude Aroclor has bean air blown one hour.
(3) Prepare Still to receive charge:
(a) Close valve In bottom line under the still.
(b) Open vent valve on the still.
(c) Kamova vent cap on measuring nippla on tha still.
HONS 056682
nrrATT.Kn msTROCTIOBS
OPERATING INSTRUCTIONS AROCLORS
22
IX. a. (3) (4) Open valve on charging Ilna at tha still. Haat on valve la sometimes required on Solid Aroclors.
(a) Sat valves in charging Una to punp from tha daalrad blowing tank to tha corract atill*
(f) If Aroclor 1168, 4065, 5042, or 5060 la to ba dlatlllad epproxlnataly 75-100 galIona of 1142 or 1154 ahould ba chargad to tha atlll and haatad to 200C. Tha notarial la than drawn out of tha atlll. Otharvlaa tha still pta? nay plug.
(g) Cloaa naln valve In vacuum Una to tha atlll Just above tha raealvar. Start steam to tha vacuum jata. Adjust water to lntareondnnsar on nlddla staga. Tha jats on #2 and #3 stills should pull dam to 20-30 am Hg absoluta on tha raealvar. Ho. 1 still Jot should pull down to 3-6 n Hg absoluta on tha raealvar.
(4) Charging tha still and start-up: (a) Sat valvaa In Una to tha still.
(b) Start tha blowing tank punp.
(e) Observe notarial entering tha still.
(d) Insert rod in measuring nlddla on tha atlll and chock anount of notarial In tha still. As soon as 10-15 Inches of notarial la in tha atlll, start tha circulating punp.
(a) Whan complete charge la In tha atlll atop tha charging punp. Allow linos to drain and dose valve In charging Una at tha still.
(f) Close valve under blowing tank.
(g) Add hydrated lima through tha measuring nipple using funnel provided for this purpose. Add 250 pounds of Una for each five (5) still raealvar batches of liquid Aroclor. All solid Aroclors (1268, 4465, 5442, 2565, and 5460) require 100 pounds of lima for each atlll batch.
(h) Replace cap on nipple over still.
(i) Light gaa burners on furnace and sat gas pressure at 5 pslg on each burner.
(J) Check tenperature recording instrunent to ba sura it is operating correctly.
(k) In case tenperature chart does not indicate a rise in tenperature, check for plugged Unas or instrument problems.
HONS 056884
OPERATING INSTRUCTIONS AROCLORS
23.
DETAILED INSTRUCTIONS
IX. a. (4) (k) Turn the puap off and on couple of Umi. Xt My bo necessary Co pull a vacuum through tha coil. Chock tha till puap ampmeter to bo aura tha pui^ la pulling a load. Hava tha alactrlelan check tha inatrunant If tha tamperatura doaa not rlaa.
(1) Adjuat tha gaa burnara to glva Mxloum rata of taaperature rlaa without ovarhaatlng. A apraad of 10-13C batwaan tha coll lnlat and outlat la normal. Gaa pressure la noraally aa follows on tha atllla whan Mxloum rata la achlavad:
Still Wo. 1 2 3
Gaa Burner Praaaura 15 palg 20 palg 30 palg
Mo. 1,2, and 3 atlll furnacaa are operated with the daqpere 1/3 to 1/4 opon.
(a) Open valve In Min vacuua line to the vacuua Jeta above tha receiver. Vacuua ahould be:
Receiver Mo. .I ' 2 A3
ea Ha Abaolute 3*5 m Hg (for Solid Aroclore) 20-30 m Hg (for Liquid Aroclora)
(n) Start water on condanaer aa Mterlal atarta to coaa over. Adjuat water to keep froa plugging up tha condanaer.
NOTK: Vacuua problaaa on tha atllla are uaually due to flaahlng of product over, plugged vacuua llnee, leaka in the atlll system, leaka at puap packing, water adjuataant on inter-
condanaer on jeta, changes In ateaa praaaura to tha jata, or problaaa In tha jet noaslea. Flaahlng can be stopped by adjuatlng tha cooling water on tha condanaer or operation of tha atlll at a alower rata. Vacuua trouble auat be traced ayatoMtlcally froa tha jet, to tha receiver, and than to the atlll.
(o) Gaa praaaura on the burnara la adjuated until tha coil taaperaturoa reach a point about 20C below tha expected dlatillatlon taaperature. Noraally a 10C taaperature apraad la obtained on tha Inlet and outlat of tha coll.
(p) Batch data ahaata are filled out during each distillation. Information includes atlll lot number, material being dis tilled, start time, finish time, taaperature spread on tha atlll colic, and tine for tha distillation, etc.-- (See distillation sheet next page)
(5) Operation of still during distillation:
HONS 056885
(a) Regulate tha gaa praaaura at tha burners to give Mximum distillation rate conalatant with a good color of tha product. (Sea Item 4. (1) above)
TAlfTA TJJ PUTIUJJ10H rmwfprys COWKTKMS
AlOCLOBS_______________________ 1221 Approximate T^tfituru at which various Aroclors start distilling 35-AO as Vec.Llqs. _______________3-5 ra Vac.Sols._________
LIQOTii Annrunma______________________
1242
1248
1254
1260 1262
________ SOLID AtOCLORS______________
1268 4465_________5442
5460
Column Coll Inlet Coil Outlet
Approximate Finishing teaperature when bottoms are not to be drawn
155C
165C 170C
165 C 170C 175C
170C 180C 190C
190C
200C 220C
195C 210C 225C
235C 245C 255C
225C
240C 245C
220C 235C 245C
215C
240C 250C
260C 280C 290C
Column Coil Inlet Coll Outlet
Approximate Finishing temperature after which bottoms ara to ba drawn
180C 185C 190C
205C 210 C 220C
230C 260C 250C
260C 245C 255C
265C 270C 280C
275C 2800 290C
310C 330C 375C
Co Iran Coil Inlet Coil Outlet Finishing Specific Gravity
Finishing Hold Poing
Finishing Softening Point HOTS: Aroclor 1232 is a
215C 225C 240C
230C 240C 250C
250C 253C 265C
1.1821.192 0 25C
1.3811.392 0 25C
1.4051.415 0 65C
of Aroclors 1221 end
260C
290C 310C
315C 325C 340C
320C 335C 345C
285C 295C 340C
350C 360C 410C
315 C 340C 390C
355 C 375C 410C
1.495 1.505 0 65C
1.555 1.572 1.566 1.583 0 90C 0 90C
150170C
60-66C 46-52C 98-105.5C
HONS
0 01 O' 00
OPERATING INSTRUCTIONS AROCLOR8
24
DETAILED INSTRUCTIONS
II. a. (5) (b) The lower the vacuum, the footer the distillation rate. (See Table III for Distillation Operation conditions of the different Aroelors.)
(e) Coil te^erature spread -
Coll Inlet and outlet temperature must be watched closely at the end of the distillation. Still bottoms are very vlacous; therefore. If the circulating pump la la poor condition, or the distillation la carried too far, circu lation may atop and the coll will become plugged or be burned. Heat from the furnace actually burns the Aroelor to carbon. If the coll outlet temperature Juqis suddenly and the Inlet temperature stays the seme or falls, cir culation has nearly stopped. In this case, cut the burners off quickly and auek the coll. If the coll cannot be sucked. It Is plugged and will have to be replaced.
Observation of the ammeters on the still circulating pump motors will also Indicate when the pump has stopped circulation. Normally the pump motor will pull 20 to 40 amps during a distillation. A sudden increase in the amp load indicates the coll is probably plugging. A sudden decrease Indicates the pu^> load has dropped off and the coil is plugged.
(d) Trensfer of receiver to blend tank or flaker hold tank.
(1) Observe level of material In the still receiver. When material is 8" to 12 from the sight glass the receiver of material is transferred to a blend tank or the flaker hold tank.
(2) Check to be sure steam heat is on the transfer lines and the pump.
If Solid Aroelors are to be transferred to the fleker hold tank the hot Aroelor heat is used.
(3) Set valves in line to the blend tank desired (or the flaker hold tank).
(4) Start transfer pump under the receiver.
(5) Allow material to pump until the receiver Is empty* Do not let the still lose vacuum. This entire transfer can be made while the still la operating.
(6) Check the blend tank or flaker hold tank to be sure the material Is being transferred.
(7) Close the valves and stop the pump when the transfer is complete.
MGNS 056887
OPERATING IMSTRUCT1CMS AROCLORS
25
DETAILED INSTHICTIOHS
II. b. Stopping the Dlstlllotion
(1) General Operation:
(a) Run down on still*. Stop food to still ond distill off notorial In tho still tank until on outogo of 62" to 64" is roochod for Liquid Arodors. normally on outogo of 75" to 80" Is roochod for Solid Arodors.
(b) Roduco gos prossuro on tho burnoro to 5 psig.
(e) Closo valvo in voeuun lino above tho roeoivor.
(d) Roduco water flow to tho condonoar oo tho dlstlllotlon stops.
(2) Oporation dopondont on Arodor boing dlstlllod: Arodors 1221, 1242, 1246, 1254, 1260, ond 1262:
(o) Stop circulating punp after 15-20 nlautos*
(b) Roloaso vacuum through tho wont waive on tho coll. 8uck tho coil clnan foe one to throe minutes.
(c) Remove cap from tho measuring nipple on tho still.
(d) Measure bottoms in tho still and record in tho log book.
(o) Prepare to draw bottone ond then recharge tho still to start another distillation.
Arodors 1266, 4465, 5442, and 5460:
(a) Hoot upper and lower valves under tho roeoivor with o small gos flams far 15 minutes before tho distillation finished*
(b) Closo valvo to suction of receiver pump.
(c) Open top valve in drawout line.
(d) Release vacuum through drawout lino, controlling rote of release with lower valve.
(e) Flush out lino by allowing 1-2 gallons to run into a bucket or 55 gollon trash drum*
(f) Catch sample in small beaker or can lid and chock softening or hold point according to method described in instructions for chlorlnators.
1* If softening or hold point is too low, close valves, let drawout' line drain and run distillation farther to raise softening or hold point. HONS 056688
OPERATING INSTRUCTIONS AROCLORS
26
DETAILED INSTRUCTIONS
II. b. <2) (f) 2. If tuple it In specification, open vent on top of the receiver and draw out Into drums or transfer to the flaker head tank to allow flaking the material.
NOTE: Aroelor 1268 and 5460 It flaked.
3. If the softening point Is too high, charge the still for the next distillation and run the first pert Into the receiver. Check the softening point at intervals; when ok, drew into drum* or transfer to flaker heed tank as required.
NOTB: Cara should be taken in finishing the Crude Aroelor so this does not have to be dona.
(g) Stop the circulating pusp after 15-20 minutes if the distillate is ready for transfer.
(h) Release the vacuun through the vent valve on the coil. Suck the coll clean for one to three minutes.
(I) Remove the cap from the measuring nipple on the still
(J) Keasure the bottoms in the still and record in the log book.
(k) Prepare to draw bottoms and then recharge the still to start the next distillation.
c. Drawing Bottoms
(1) Schedule for drawing bottoms:
(a) Arodors 1221, 1242, 1246, 1254, 1260, and 1262: Draw bottoms after every 10th distillation.
(b) Aroelor 1268: Draw bottoms after every 4th distillation.
(c) Aroelor 4465: Draw bottoms after every 3rd distillation.
(d) Ar odors 5442 and 5460: Draw bottoms after every 2nd distillation.
(2) Operation:
(a) Place estimated number of scrap drums required (normally 7 or 8) in an arc on the floor beneath the still and under the hood so each drum can ha fillad without being moved.
(b) Check bottom line to be sure It can ba turned to reach all drums without becoming unscrewed from the velve.
(e) Cheek to be sure the exhaust fsn Is running.
M0NS 056889
OPERATING INSTRUCTIONS AROCLORS
27.
DETAILED IN3TRUCTICW8
II. e. (2) (d) Hitt the valve at tha bottom of tha still to be sura It Is not stuck. Osa a snail gas flans for 15 nlnutts bafora drawing bottoms.
(a) Obtain asslatanea to draw bottoms. Hava parson put on faea shield.
ROTE:
Furnas fron this operation are toxic. The material to ba drawn into drums Is hot. Do not stay under the hood while bottoms are being drawn.
(f) fat drawout line at a drum. Open valve under the still. Shut off valve when the drum le filled within $-10" of top. Dee hook rod to determine level la the drum.
(g) Move drawout line to next drum. Open valve under the still. Continue until the still Is empty.
(h) Close valve under the still.
(1) Allow drune to set under the hood until they have cooled (6-10 hrs.). Then palletise the druns at the dock for transfer to the dunp.
d. Earth Treatment of Aroclors
Liquid Aroclors 1221, 1242, 1248, 1254, 1260, and 1262 are treated with Attapulgus Earth for three hours per the following procedure:
(1) Collect two receiver distillations In a blend tank.
(2) Prepare Attapulgus earth which Is to be added to the blend tank. This earth must be dried In an oven for a minimum of four hours at a temperature of 210250C.
(3) Start the agitator in the blending tank and add forty (40) pounds of dried earth for two receiver distillation batches.
(4) Agitate the mixture of earth and Aroclor for three (3) hours at the following temperatures
Aroclor 1221 Aroclor 1242 Aroclor 1248 Aroclor 1254 Aroclor 1260 Aroclor 1262
Temperature 60 - TO6?
70 - 80C 89 - 90C 90 -100C 100 -110C 110 -120C
M0NS 056890
0PR&A11NU INSTRUCTIONS AROCLO&5
28.
PETAILSP IH8TRPCTI0M8 II. a. Filtration of Aroclora
(1) Prepare 11tar for filtration of Aroclor by cleaning tha aarth fro* tha previous filtration# fro* tha praaa and installing nan f11tar papar.
(a) Run tightanlag sera* baek to paradt reaoval of papara
(b) Separate and elaan fraaes and reaove uaad papara. Ba aura no aarth la laft on tha surfaeaa of tha platas and fraaes. Placard aarth and papar In a 33 gallon traah dru*.
(c) Install new papars and tlghtan tha praaa. Use two papar* between aaeh plata.
(2) Starting Filtration:
(a) After tha Aroclor has baan aarth traatad for ehraa houra start filtration*
(b) Sat valves in tha systa* to pia^ tha traatad Aroclor fro* tha bland tank, through tha flltar praaa, and baek to tha bland tank. Racycla this notarial until no aarth la visible in a aa^la fro* tha flltar.
(e) Sat valves to direst Material to tha Filtrate Receiver whan tha BBtarlal has cleared up.
(d) .
Catch a sa^le of tha filtrate. Check specific gravity and color. Record data in log book. At present tha Lab aust ok eolor.
(3) Transfer to Storage Tank:
(a) Measure outage of notarial in tha filtrate tank and record in tha log book.
(b) Sat valves In tha line so tha Aroclor will ba puaped to tha desired storage tank.
(c) Cheek to ba aura staan la on tha transfer piug> and tha transfer lines.
(d) Start tha puap under tha filtrate receiver.
(a) Close tha valve under tha filtrate receiver and atop tha transfer puap whan tha Aroclor has baan puaped out.
(f) Measure lnnaga in tha storage tank and record In tha log book.
HONS 056891
0PSRA7IKG INSTRUCTIONS AROCLQRS
29
DETAILED INSTRUCTIONS
II. f Trouble Shooting Aroclor Stills. Barth Treatment. and Storage Operation
Problem
Poeslble Cause 6> Action
(1) Still Vacuum Problems
a) Jet not operating proparly.
Action: Clot# valve on receiver and be aure the Jet will pull down. Cheek etean preaeure to the Jet, check vacuum llnee for leaks, or plugs, and cheek the Jet for plugging. Notify the chief operator repalre are nwtiairy.
b) Plugged condenaer.
Action: Put teas or flaw heat on the condenaer to unplug.
c) Leaks in the systw.
Action: Apply full vacuus to the Jet. Cheek out the piping system, the still, till pump, and the receiver for leaks.
d) Minor Jet problems.
Action: Water to the Intercondaneer nust be adjusted properly. Steen to the jet eust be constant. Measles In the jet aust be in good condition.
(2) Roles or plugs of still colls
a) Colls occasionally wear until a hole cows in the coll froa heating and age. Black smoke in the furnace, or out the furnace stack indicates Aroclor is burning
Action: If the leak is ainor continue operation until the still is finished. Kotlfy the chief operator repairs are necessary.
b) Running down In the still at the end of a distillation, failure of the puap, or excess heating of a coll can eause a cell to plug.
Action: Check the pump sapaster to see how aany saps are required. (Noraal 25-30 aaps) A higher reading would
MONS 056892
OPERATING INSTRUCTIONS AROCLORS
30
DETAILED INSTRUCTIONS II. f. (Continued)
Problem
(3) Plugged Lines
(4) Off-Color Aroclor on a Still
"
Possible Cause & Action
indicate the coil la plugging. Cut the fire off of tho furnace imedlately, cheek the inlot and outlet coil twpartturo to determine If coll baa overboatod. Notify tho ebiof operator if tha coll auft ba ebangad out.
a) Solid Arodors and tha still rasldua trill plug linos, still colls, and pispa whan it is not kept bet.
Action: Chock to ba sura steam or hot Aroclor Is on tha plpa lino. If not put staaa on and give It tlaa to hast up tha lino. Chock plpa linos and velvet for exposed araas not staaa traced or insulated. Use COg and try to blow tha lino out. Dee a gas torch flaae to hast tha valve or pipe Una.
a) tepid or too fast a heat-up on a still.
Action: Decrease fire and stop distillate, than increase teaperature slowly to give good color Aroclor (noraally 10 on 1242).
b) Rapid surgas in tha vaeuua systan can cause Material to burp over.
Action: Check vaeuun control - adjust to give good control. Notify chief operator if repairs era necessary.
c) Run-down on a still can causa carry-over of high color notarial at end of e distillation.
Action: Watch tenpsraturc spread on run down. Do not exceed final tanpsrsture on a distillation. Do not 1st tem perature spread exceed 15C.
HONS 056893
OBTAIt.gD HBTRaCTIOHS
UPERATIKS IhSIRUCTI0K3 AORCLORS
31.
11. f. (Continued)
Possible Cauoa & Action
(3) High Moisture In Aroclor *) Molatura above 30 ppa 1* coo Ugh In finished Aroclor*. penally aatarlal auet bo 20 Co 23 ppn to bo loaded In specification, since moisture la plckad up during loading.
Action: Start eaapllng to detarulna where the noiltore la being obtained. It nay ha necessary to run a pressure test on tank colls to detanlna the problaa. Notify the cUef operator as soon as aatarlal out of specification Is found.
(6) Bad Ilaetrlcal Property
trobla In Aroclor
a) Raalstlvlty and stability of the Aroclor
are very critical In this quality pro*
duct. Material oust be loaded at a
300 resistivity nlniaua to be In
specification. Since the electrical
property drops during loading. It should
be 700-800 when loaded. If wtarlal Is
low In the storage tank It la trans
ferred back to the blending tank for
earth treatment, laboratory chock, and
than loaded to a car.
(7) Still Recalvar Transfer a) Transfer punp will not pu^ the receiver
Pu^ Probisen
out under vacuua.
Action: Check the Unas to be sure tbs valves are set correctly. Check lines at botton of the receiver to be sure they are not plugged. If necessary to punp out, shut off vacuua on the still and transfer the receiver. Notify the chief operator that the punp, relief velve, or the pipe lines need work.
MOMS 056894
LOADING
OPIRAIING INSTRUCTIONS AROCLORS
C. DRTAILID UI8TRUCTICWS
III. Loading HUatd Arwclon
Aroclor* are shipped In five gallon cant; 55 gallon drums; 4,000, 7,000, aod 8,000 gallon tank cart; and 3,000 or 4,000 gallon tank truck* to customer*.
a. Spotting Tank Cara
Normally tha railroad switch crow will apot car* at tha Aroclor loading dock. Oceaaionally It will ba naeaaaary to nova a car. Whan It la nacaaaary uaa tha half track and pull tha car Into position.
(1) Obtain halp to nova tha car.
(2) Attach hook on cable at front of tha half track to a atrong part of tha car. Do not hook onto tha ladder or other weak parte.
(3) Relaaea tha winch and lot out 15 to 20 feat of cable to connect to tha car.
(4) Ralaaaa tha brake* on the car.
(5) Uaa tha half track to pull tha car into poaltion. Put tha half track in four wheel drive. Do not uaa tha winch to pull tha car.
(6) Stop pulling tha car whan it ia in poaition.
(7) Sat tha brake on tha car.
(8) Remove tha cable hook from tha car and wind up on tha winch drum.
b. Pilling Tank Cara or Truchc
Aroclor* ara ahipped in lined vaaaala to protect tha electrical pro pertied from contamination. Moat vaaaala ara lined with alueinue or a alnc-tln lining.
(1) Inspection of car or truck for loading:
(a) Inter each car or truck for inapaction prior to loading. If nacaaaary dean out tha vaaaal. All notarial in tha tank should ba removed. Damaged lining areas should ba cleaned of rust particles. Report damaged area*.
(b) Uaa a tank entering permit and a fire permit when entering a car. Observe safety rule* for each permit.
(c) A fallow worker must ba on top of tha car holding tha rope harness. Wear tha safety belt harness, an air mask, gas teat tha car, and uaa a light when entering a tank car or truck.
MGN5 056895
OPERATING INSTRUCTIONS AROCLORS
33
DETAILED INSTRUCTIONS
III* b. (1) (d) Fill out tank inspection sheet*
(2) Put state on thn ear after it le clean.
(3) Check to be sure there le enough aaterial In a storage tank to load a car or truck ae required* (An 8,000 gallon car requires about O" of aaterial la #2, #3, end #4 storage tanks*
(4) Circulate the aaterial in the storage tank for too (2) hours, saaple the tank, and have the saaple cheeked for loading bp the laboratory* If aaterial is in specification proceed with loading of the tank*
(5) Install diaper cloth sock in the filter in the loading line and place a sock over the end of the loading line extension*
(8) Attach extension to the loading line at the dock and place sock end into the dos of the car*
(7) Connect ground wire to the car*
(8) fat valves la the loading line froa the storage tank to tha loading dock. Do not open valve in line at the car*
ROTS: Care should be taken to see that the correct valves are opened so only the desired Aroclor enters the loading line
(9) Start puap at the storage tank*
(10) Open valve in drain line at tha loading dock and allow one drua of Aroclor to flow through the line to flush out the loading line
(11) Close valve in drain line and open valve in line to the cap.
Approdnately 2% hours is required to load a car*
*
(12)
Vhen the car Is loaded, stop the puap, and close valve to the loading line* Fill car up one to two feet Into the done of the car*
(13) I--nvc loading line froa car.
(14) Take staples froa car and send to laboratory for final analysis* (Sea Schedule
HONS 056896
OPERATI'IG INSTRUCTIONS AROCLOAS
34
DETAILED INSTRUCTIONS
III. b. (14)
SAMPLES TO BB TAKEN FOR LIQUID AROCLOR LOTS
MATERIAL
TANK CARS - TRUCKS or DRUMS
1221
2 x 1/2 Gillen
1232
2 x 1/2 6x11m
1242
3 x 1/2 Gallon 6 1x3 Pint
124S
2 x 1/2 Gallon
1234
3 x 1/2 Gallon 6 1x5 Pint
1260
3 x 1/2 Gallon
1262
2 x 1/2 Gallon
(15) Cloaa and tifhtan lid on car.
(16) Saal car and record saal nuabar and car nuabar In Areolae log book.
c. FIHHIE PWl
Liquid Aroclor can be druaned fron the etorege tanks or ths filtrate rclm. Solid Aroelors that ara druanod ara normally fillad fron tba still receiver. Solid Aroelors 1268 and 5460 ara normally flaked and ta||ad Aroclor 2565 is a non~di#tilled produet which is druaaad froa tha blowing tanks*
Tha following stops should ba followad whan notarial Is to ha druaned:
(1) Sand a raprasantativa saapla (1/2 Gal. for Liquid Aroelors) of tha notarial to tha laboratory for inspection. If tha notarial is via storage tank it should ba circulated for two (2) hours. Material in a filtrate receiver or blowing tank should ba agitated tor 20 to 30 Minutes. If notarial la In specification proceed with drunning.
(2) Check tha scales to ba used. Set tha scales for the weight specified for each drun (Sea Table IV)
(3) Start the puap.
HONS 056697
tutorial 1221 1232 1242 1248 1254 1260 1262 1262 - 10X Toluan* 1262 - 101 Xylan* 1260 - 10X Toluana A13B3B 5442 2565 4465 Inortoon FPO
TABLE IV A&OCLOR FINISHED GOODS
DRUM WEIGHTS Drum Wlght Lba. - 5 Gala, & 55 Ool*.
50 or 520 50 or 550 55 or 600 55 or 600 60 or 600 60 or 600 60 or 600 60 or 600 60 or 600 60 or 600 65 or 675 50 or 650 500 50 or 500 65, 360, <
34-*.
HONS 056390
0P2XATINC INSTRUCTIONS AROCLORS
35
DETAILED INSTRUCTIONS
III. c. (4) Open ths valve in the drua-ojt lino and allow approximately 5 to 30 gallons cf traterial to How through the lina loto a draw to flush out the lina. Druaaing fro* a filtrate tank should take five gallons of notarial to flush the line. Drmuting from a storage tank should take 30 gallons to flush the line.
(5) Fill 5 or 6 drums of notarial to the specified weight; stencil the nane of product; lot nuaber, net weight of each drua, and the initials of the person doing the work, lee nest page for drua weights - Table IV.
(6) Staple these druae with a thief for final drua eaaple per eehedule for loading tank cere (b. (14)).
(7) Continue driawing the Aroclor when the lab gives the final ok thee Material le In specification!.
(8) Drua aaterlal until you have the required quantity of druae. Filled druae ere pelletised end aoved to the loading plat* fora for transfer to the warehouse.
HONS 05669V
OPERATING INSTRUCTIONS AROCLGSS
36.
Flaklna Aroclocs
Aroclora 1266, 5460, and 5060 ui flakod on a drua flakar and baggaw in 100 lb bags*
Prwwtioa for WkiM
(1) Plaea hoc Aroclor boat on the pipe lines, valves, and flakar hold tank. Heat tha Aroclor systaa up to 250C. Obaarva taaparatura on tha aultl-point recorder in tha ehlorlnator eontrol rooa.
(2) Puap Aroclor to ba flakad into tha flakar hold tank.
(3) Chock taaparatura of aatarlal in tha hoLd tank. It abould recirSar * "in* Taaparatura racordad on #3 atill aultl-point
b. SUrt-lh of Flint ItiW
(1) Turn alaetrical haat in tha flakar pan on about 20 to 30 ainutafl bafora start-up.
(2) Open valve in water line food to tha flakar drua.
(3) Start tha flakar drua. Start braakar at dlscharga of flakar.
(4) Opan valve at bottoa of tha flakar hold tank.
(5) Opan valve at sight glass to start Aroclor food into tho flakar pan. Observe flow in sight glass. Adjust valve to aalatalm tha level la tha flakar drua about ona inch fron tha top of tha drua.
(6) Observe oporation to ba sura tha drua is picking up tha aatarlal.
(7) Aftar tha flakar has run 15 to 20 alnutas notify tha Chlsf Oparator aatarlal la in tha hoppar to ba baggad.
(!) Cootinua to flaks until tho flakar hold tank la aapty.
e. ItoQm ritkfr
(1) HorMlly th. flak*r will b. run until th. hold tank 1.
(2) Alloa tho drua to pick up aatarlal froa tha pan until it will no longar contact tha hot liquid product.
(3) Stop the flaker drua and tha brsakers.
MOMS 056900
OPERATING INSTRUCTIONS AROCLORS
37.
MTAILKD U8T&UCTIOHS
XV* c. (4) Turn off the electrical heat to the fleker pen.
(5) CXoee the velve In the water line to the fleker drum.
(6) Cloee the valve at bottom of the fleker hold tank and at the eight gleet feed to the pen.
d. Reeing Solid Aroclore
(1) Check to be eure flaked notarial it in the hopper under the fleker.
(2) Get bage ready for uee and etack near the bagging machine.
(3) Get a etencll for the bage with neae of the product, lot nuaber, net weight of eech bag, and the lnltlale of the pereon doing the begging.
{4) Set up an eapty pallet behind the bagger to etack filled bage on.
(5) Check the ecalee to be ueed. Set the ecalee for the weight epeclfled for each bag (noraally 100 lba.)
(6) Open the elide gate valve above the bagger.
(7) Stencil each bag. Xneert the bag on the bagger nossle. Claap the bag in poeltloo. Be eure the bag eupport le at the right height.
(8) Start the bagger. Fill the bag until it le nearly full. Stop the bagger.
(9) Check the weight of each bag to be eure It le correct. Add aatarlal or take out ae le neceeeary to get correct weight. Place bage on the pallet and nova to the loading platforn for tranefer to the warehouee.
(10)
Continue to operate the bagger until all the aaterial In the hopper le in begs. When coaplete, atop the bagger and put
up all iteae left.
(11)
Flaked aaterial nay hang up In the hopper. Turn on the electric vibrator for about one alnute if thle occure. It ay be neceeeary to reaove the plate over the chute from the hopper to the bagger and poke the aaterial Into the bagging aachine.
HONS 056901
OPERATING INSTRUCTIONS AROCLORS
38
DWAILP INSTRUCTIONS
IV. d.
(12) Occaalonelly flaked notarial hanga up In the ecrav In tha bagger and beconee noltan. When thla occur* atop tha bagger and let it cool for 10 ninutea and try again.
At tlaaa tha aeratr auet ba raaoved froa the bagger and claaned aa follova:
(a) Tag out tha electrical aaitch.
(b) Cloae tha elide gate valve above tha bagger.
(c) Raaove the back cover on the bagger.
(d) Raaove tha belta on the eerev drive pulley.
(e) Pull tha acron out. Clean all aoltan notarial off the acre* and out of tho acre* chaaber.
(f) laplace the eerew in the beggar. Put the belta on the drive pulley and replace tha back cover of tho nachlna.
(g) Throw the evltch on tha electrical atartar bon and raaove the tag out card.
(k) Open the elide gate valve above the bagger.
(l) Start the bagger into operation.
HONS 056902
O/EUTUiG IflSTfcuCIZOWS AROCLOM
J9.
c. ngTMTJm ^SaLOCIiOaia
V. Crmhtna. Agoclor*
Several of eh* Mooters (Aroclor still bottom or rootduo) ro crushod and repackaged in drum for euotomra.
a. SalscC drum of mtarlal to bo cruohad.
b. Broak tha mtarlal In tha drm by hitting tha olds of tho dxun with a hamar.
c. Flaca now aapty drun undar tho crushor to collact tha cruohad mtarlal. Chock tho scales to ba uaad.
d. 8tart tha cruahar.
a. food tha mtarlal froa tha drua Into tha jaw cruahar by uaa of a hand ecoop.
f. nil tha drum to tha dmlrad weight, ftaaell tha drum with tha naaa of tha product, lot maker, net weight of each drua, and tha loltiala of tha parson doing tha work.
g. Continue thla oporation until tha required nuahar of drum are filled. Thou atop tha cruahar sad dean up tha scalae, cruahar, and aurrouadlng area.
h. All drum filled are pallatised and nosed to tho loading platform for traaefar eo tha oarahouee.
HONS 056903
OPKBATINC INSTRUCTIONS AROCLORS
40
c. pimmi instructions
TI. muni Aroclors
Aroclor 12S8 1* the only Aroclor which la sold aa a nillad product. Tha notarial nuat first ba flakad.
a. Salact tha druna of notarial to ba nillad.
b. Chack tha aealaa to ba uaad. Placa a now drun undar tha willing nachina to collaet tha 1268.
c. Cruahad dry lea la uaad during nilllng to kaap tha naehlna cool. Thla kaapa tha Aroclor 1268 fron clogging up the naehlna.
d. Start tha nlll and augar.
a. Pill tha buckat with cruahad 1268.
f. Bland dry lea with tha 1268 and faad It Into tha hopper over tha nlll. Uaa appruzlaately flwa pounde of dry lea to aaeh 100 pounda of Aroelor 1268 that la nillad.
g. Fill tha druna to tha apad fled weight (nornally 200 lba.). Standi tha draa with tha nana of tha produet, lot nuaber, net weight of each drun, and tha lnltlala of tha pareon doing the work.
h. Continue thla operation until the required nunbar of druna are filled. Than atop tha nilllng naehlna and clean up tha aealaa, tha nilllng naehlna, and tha nilllng roan.
1. All druna filled are pallatised and nowad to tha loading platforn for tranafar to tha warehouse.
HONS 056904
HONS 056905
OPERATING INSTRUCTIONS AROCLQRS
0. MERCMCY PROCEDURE
This la th plan for departmental action la the event a hasardoue situation or Injuries warrant emergency action either In the Aroclor Department or within the Anniston Plant.
1. Hasardous situations which night occur are: a. ^c|ldyitf ot^ffleultlaa. such as, explosions, fires,
b. Forces of nature hurricanes, tornadoes, floods, lightning, etc.
c. Deliberate danaac - malicious actions, sabotage, direct enemy action.
2. The primary conslderatlona In the event of e disaster are:
a. The cars of Injured Individuals and evacuation of personnel to safe areas.
b. Measures to prevent any, or further, property or equipment damage.
c. Measures to provide accurate and thorough Information so that other plant personnel and the community can be Informed, If necessary.
d. Prompt restoration of affected facilities and resumption of un interrupted operations.
3. Responsibility:
The areas of responsibility and overall department organisation for disaster control are as follows:
a. Chief Operator - Responsible for continuing or dosing down produetlon facilities as conditions permit; for directing fire fighting and dahegt control activities In the department area; keeping dapartmcnc suporvislon fully informed of condition, within the department.
b. qqme - laaponslble for evacuation of all personnel from danger roe; fee directing end assisting In first aid and rescua missions; reporting to and heaping chief operator Informed of conditions within his araa of responsibility.
NOTE: dll actions of the Pirn Brigade arc coordinated with the Chief Operator.
1. Details of Plan:
a. In the event of an emergency, personnel mist be accounted for. The first assembly tree for the department Is the open area south of the HB-AO Plant near the ladder rack, the second or alternate assembly raa Is east of the Aroclor-Biphenyl Bulldlna In the road near the shop entrance.
HONS 056906
OPERATING INSTRUCTIONS AROCLORS
2.
P. 4. Ptll_of PlTO (Coat'd.)
It 1. vary lnportant to know whoro people oro In an anergancy or bafora action la takan to corract an Marganay. If the alternate araa haa to ba uaad, taka whatever aafaty aquipnant you can, fron tha dapartaant, to tha aaaaably araa.
b. If aaalatanea la naadad, partlnant phona nunbara of Plant pareonnal to ba eontaetad ara aa follow.:
K. J. Hllllana J. W. Molloy
B. 0. Moody J. B. McClain P. B. Sturnon L. C. Puhrnalatar J. B. Aldrldga B. V. Bchranu Dr. J. C. Prancic
237-1952 236-3973 236-7906 237-4426 237-5704
236-6773 237-7261 237-7067 237-5612 (Bona)
Main Gate
236-2961 (308 or 317)
c. In tha avant of a plant dlaaatar, tha
offlea la tha
control cantor. Tha alternate control eantar la tha Ouard loon at
tha Sarvlea Building. Tha nodical eantar la tha Plant Mipenaary.
Tha alternate aadlcal eantar la tha Sarvlea Building.
d. If tha anergancy or dlaaatar oceura bafora or after tha day ehlft, or on a weakand, the dapartaant Chief Operator ahall notify tha
guard on duty and tha guard will ba reaponelbla for notifying plant auparvlalon.
a. Innadlataly upon dlaeovarlng a fira, or a currant or lnalnant dlaaatar condition, turn In an alarm. DIAL 211 and tall where and what the aaarganey la.
If aha guard aaanot ba eontaetad and tha local Plra Dapartaant la napdad, call than at 237-3341, giving than location, notarial burning, alia ad araa Involved, ate. Than call tha dapartaant auparvlalon.
Bat Chief Operator nay dealgnate thla Job to ana of tha Operator*.
t. Baaraancv Bltuatlona
Tha following aquipnant anarganelaa are poaelbla at the Aroclor Dept. Ba prepared to taka action In tha avant they ahould occur. Prepare youraalf by knowing what to do - gat help beforehand on any part that la not underatood.
*GNS 056907
OfS&ATIHG IRSTItUSTICKS AROCLOU
3
hirinw lltuitioM (Coat'd*) I9SUSSZ
1. Fin handling Urkaqrl
2. Chlorine Delsacs a. lank Car b. Chlorine Plant
Action
. Turn to alara - Dial 211
b. laovt injured froa fixe arm taka care of than.
e. Proceed under chief Operator to extinguish the first
1 Dry pcarder extinguisher 2. Plre truck - dry powder and water 3. Water
d. Pull power on all wotors.
a. Cut off gee to droelor and Diphenyl tills at neln cut-off at northwest i corner of blowing tank area.
f. Unit dean neperfont - notify Chlorine Plant shutdown le necessary.
a. Obtain help and turn in alara if isary - Notify Chief Operator
Obtain gas wash or Scott Air Pak
but off source of Chlorine.
d. Notify Chlorine Plant if shutdown le accessary.
a. Disconnect Clj connection at car if necessary.
f. If vaporiser is full of liquid Chlorines vent to the Chlorine car; than chut off car.
B Notify Department Supervision as aoon as possible.
HONS 056908
COM) VWm THATMMT <* BCM3
(Ihoul & Chanlcal)
Therna1 Ultra - The type of burn you.would got by:
1. Direct axpoaure to (1m. 2. Skin ankw eoottct with hot esfaea. 3. hot notorial*, ouch aolton Santowax, aolldlfy whan it touohaa
tha akin, tharaby holding tht haot In tha akin.
Chonlcal Burn - Tha typa of burn you would gat by:
1. Contact with Muriatic or (ulfurle held. 2. Contact with rotaaalun or Sodlun Hydroxide. 3. Contact with any acid or strong alkali Mtawlal.
Traaaas. - Thotnnl luma
If poaalble, eubasga burn araa In contains of cold watar (50F). Tha contains nay ba a drun, wars poll, wnah baaln - anything that will hold tha wots. Follow thaaa atapa:
1. Fut wats In eootalns to dulrad depth. 2. Try to obtain a wots tanpsatsa of 30F. by adding lea aMbM. 3. tubnsga burn araa balow tha aurfaaa of tha wats. 4. Traaaport lajsad psaan to tha doctor, keeping burned aurfaaa
aubwargad la wots.
If bun la la axa* that ean not ba aubnaagad la wats. It la a good practice to taka tha alaanaat elath s towallng that you cm obtain, eoak It la Cold wats (wringing out axcaaa wats), and plaoa an tha burned ttn. Ihla would ba an wm aueh aa tha back, ahouldsa, s atana ah. HUB go ClkCCMTiKH
should a Futai rarraniQ fsch ma gam h flacd nan inuB wan.
Thsa la a dangs of tha eaall dropiate of wats atrlklag tha buruad area, caualag pala to auah aa extant aa to raanlt la ehoak.
Tteatnant - Chanlcal guraa
1. Flaca lajsad psaan ads aafaty aheos s acna oths nathod of waahlng with lsga anounta of oats.
2. kenawa contentnated clothing while wads the ahows. 3. If gagglaa era worn, keep In plane until all the chanlcal haa been
Kited frua tha body.
Cansal
la os dlapaaaary wa bar* an olntnant labalad gulfathlaola. Ihla notarial la uaad In the treatnant of burn*, both tharaal and chaadcal. It allow* aa Injury to heal fron tha laalde out, which la ueually tha altuatlon with a burn Injury.
MONS 056910