Two Pyrcclor fire-resistant transformers are installed on the flat roof of the Ford Motor Co. Ltd., Basildon Works, with a light enclosure around them, In the event of a fne in the factory below there is no risk of the transformer cooling fluid spreading the blare.
!
j
'
0221153
|
TOWOLDMON0025821 WATER_PCB-00010290
I i 1
!) Fifty-three Pyroclor transformers
1 on Motor Company rooftops
I
].
Pyroclor transformers solved a factory planning problem for the Ford Motor Co. Ltd. new tractor production plant at Basildon, Essex.
[I Although the plant covers 800,000 square foot the planners ruled that, in order to permit maximum flexibility in production layout, there should be no permanent obstructions in the floor area. This meant that the many trans formers required to supply the manufacturing and assembly operations could not be placed inside the building at floor level. Owing to the immense 6ize of the building, transformers sited externally would have meant long runs of expensive low-voltage cables to connect with the many load centres required. The obvious place was the roof.
But conventional transformers in this location would have meant an un acceptable fire risk--not so much from the possibility of a transformer itself starting a fire, but from the likelihood of it becoming involved in an oxtraneous blaze and its fluid carrying the fire to other parts of the building. Modem singte-storey open-plan factories in fact constitute a major fire hazard since there are no solid walls to prevent the lateral spread of flames and smoke.
Nevertheless, the roof had undeniable attractions 8nd Ford decided to carry on with the scheme using 11 Pyroclor fire-resistant transformers.
fn addition, 18 Pyroclor-filled transformers are sited 8t the Ford Motor Co. Ltd., Dagenham, works and 14 at the new car assembly plant at Hatewnod. All transformers are on the roof, so too are the 10 units at the Caterpillar Tractor Co. plant at Glasgow.
3
02^115'.
|
TOWOLDMON0025822 WATER_PCB-00010291
Pyroclor transformers en route to Steel Company of Wales.
Pyroclor-filled transformer units at Richard Thomasand Baldwins Ltd.
! j
0221155
|
TOWOLDMON0025823 WATER_PCB-00010292
Basement locations in Steelworks eliminate fire hazard
At the world's most advanced steelworks, the Spencer Works of Richard Thomas & Baldwins in South Wales. Pyroclor transformers are installed in the basement of one of the rolling mills to eliminate lire hazard. The basement houses part of the main power distribution and control systems and even minor damage there could result in a complete plant stoppage.
i Two Pyroclot-filled transformers supply rectifiers providing direct current
for the main drive motors of the two 60-inch temper mills which give the
final finish to the cold-rolled wide strip. These 11 kV transformers are rated
at 2625/4280 kVA.
.
This installation is only one of several completed in recent years in British stoelworks.The Steel Company of Wales, at its Port Talbot Works, uses three Pyroclor-filled transformers for the 56-inch high-speed temper mill, and the Appleby-Frodingham Steel Company, at Scunthorpe, hasl 1 units, supplying mercury-arc rectifiers.
In all these three installations, in basement locations, air-cooled transformers with the British Class H insulation (180'' C.) were considered but Pyroclor was preferred on cost grounds and because of (he dusty environments The modern steelworks depends on an unfailing supply of electricity- Even if a minor fire damaged the power distribution system this could have farreaching repercussions.
5 118??!
US6
TOWOLDMON0025824 WATER_PCB-00010293
Compact, dust free, Pyroclor units below ground for Railway power
Recent modernisation on the British Post Office's private underground railways, which link eight postal depots in the busiest parts of London, included the installation of Pyroclor fire-resistant transformers.
In the event of the transformers becoming heated due to a fire in the viciniiy there is no risk of burning fluid spreading the conflagration through the underground tunnel systems. For static rectification ol alternating current, the combination of Pyroclor transformers and mercury-arc rectifiers has proved extremely reliable and economic.
At Mount Pleasant the sub-station is below the platform on which the mail bags are handled. Pyroclor transformers wore chosen because no enclosures or CO, equipment were required. They were preferred to air-cooled units because they are more compact, an important consideration below ground. In Lisbon, Portugal, the Metro has installed seven Pyroclor transformers for a sunken rectifier sub-station and Tho Pennsylvania Railroad Co. has now used Pyroclor units for 25 years. Every one ol the company's 215 electric locomotives is now equipped with this typo of transformer.
7
WfJIWI"
0221158
TOWOLDMON0025826 WATER_PCB-00010295
Pytodor transformers were chosen to bo installed in a remotecontrolled water-pumping station in Yorkshire.
0221159
|
TOWOLDMON0025827 WATER_PCB-00010296
TOWOLDMON0025828 WATER_PCB-00010297
' Almost twenty-five years service in Electricity Generating stations
V, j
i
r
. .J
;*r"" '
^- -
t
f
`-t
The oldest transformers in Britain using Pyroclor arc at Trafford, Manchester, power station of the Centra! Electricity Generating Board. Installed in a basement there as long ago ss 1941, they are still in service. The units are of 500 and 800 kVA. More recently. Pyroclor transformers have gone into the San Esteban and Mallorca power stations in Spain, and in India transformers of this type form part of the huge Damador Valley development in West Bengal, at the Bokara and Durgapur steam power stations
11
0221161
TOWOLDMON0025829 WATER_PCB-00010298
Pyroclor transformers have been installed on the 42nd floor of the Canadian Imperial Bank of Commerce, Dominion Square, Montreal. Canada
An interior view of the sub-station at the Canadian Imperial Bank of Commerce
0Z2\lbl
|
TOWOLDMON0025830 WATER_PCB-00010299
Pyroclor transformers have been installed on the 42nd floor of the Canadian Imperial Bank of Commerce, Dominion Square, Montreal. Canada
Sub-stations in tall buildings
Pyroclor-filled transformers are idea! for supply services in tall buildings. Freedom from fire risk is important in overcrowded areas end these trans formers can be sited anywhere, in the basement or at the bottom of a lilt shaft, for example, without special fire protection. Costly runs of L.V. cable are avoided with Pyroclor sub-stations on several levels of a tall office block. The clean lines and modern appearance of present-day architecture are not marred by obtrusive outbuildings or cages. Pyroclor transformers can be installed indoors, out of the way, and assist improved architectural planning. The Canadian imperial Bank of Commerce, Montreal, installed Pyroclor transformers on the 42nd floor, further proof lhat these units can be safely installed anywhere--even at the top of the Commonwealth's tallest skyscraper I
13
0221163
TOWOLDMON0025831 WATER_PCB-00010300
TOWOLDMON0025832 WATER_PCB-00010301
In collieries
Several modern colliery winding installations in Britain have been equipped with Pyroclor fire-resistant transformers. In the event of the transformers becoming heated due to a fire in the vicinity there is no risk of burning oil pouring down the mine shaft to spread the conflagration. The North Western Division of the National Coal Board, for example, has installed 14 Pyroclor-filled transformers for rectifier duties at collieries in the Lancashire area. These are installed in the winding towers immediately above the pit shafts and, according to an NCB official, "the fire hazard associated with the difficulty of containing such a large volume of oil Irom reaching the shaft, madn it essential 10 use a non-flammable fluid if the transformers were to be mounted in this position and avoid long and costly copper connections". Very similar installations have been completed at two collieries in the Durham Division of the National Coal Board. Photo courtesy of The National Coal Board
15
0ZZU65
II TOWOLDMON0025833 WATER_PCB-00010302
Pyroclor transformers have reduced installation 8nd maintenance costs at the Monsanto plant, Fawley, Hants.
--madtti. .
0221166
|
TOWOLDMON0025834 WATEFLPCB-00010303
Low-voltage power supply at Chemical Processing plants
1
I
.... end at (he Chemstrand
t 1 Ltd. plant, Coleraine,
N. Ireland.
f i
Some chemical processes involve the use of highly inflammable base materials. Large amounts of electric power may also be required, and the provision of suitable low voltage supplies under flameproof conditions can present problems.
At the Coleraine works of Chemstrand Ltd., where Acrilan fibre is made, the necessary power is obtained from 8 x 1000 kVA (11 kV/415 V) and 6 x 600 kVA (11 kV/415 V) transformers. Four of the main distribution sub stations aie located In the main factory building. This location was made possible by the choice of Pyroclor transformers which have reduced both installation and running costs.
At Baglan Bay, where Forth Chemicals Ltd. manufacture styrene monomer, the whole factory compound has been declared a flameproof area; con sequently the 4 x 500 kVA transformers which supply the works are Pyiodor-filled, even though they arc sited out of doors. Similarly three 800 kVA and one 1500 kVA (11 kV/3.3 kV) and two 100 kVA (11 kV/415 V) transformers for the Monsanto polyethylene plant at Fawley have been located adjacent to the buildings involving ethylene processing.
In neither of these cases would it have been economical to use dry trans formers, since these would have required protection from wind-blown dust end driving rain.
17
0ZZllb7
TOWOLDMON0025835 WATER_PCB-00010304
TOWOLDMON0025836 WATER_PCB-00010305
a/V"1-- ffi
'V..*"-- --***'*k*
w * i:
A'// '
J jj:,. -^L^.
**
?V .;
>|J-:------ a|
low Jiu* .lv Ltd.
Tho basement of the Bryant & May Ltd. match factory could not be used lot production owing to lack of ventilation. It was therefore the ideal place to site two 300 kVA Pyroclor Transformers, one at each end of the basement with a distribution switchboard in between.
The highly inflammable nature of some of tire materials used in the manu facture of matches ruled out the use of any but fire-resistant transformers. This meant that the choice lay between air-cooled units and those con taining a fire resistant dielectric. The difficulty of keeping air-cooled trans formers free from dirt and dust in a factory basement and their higher cost were key factors in the decision to install Pyroclor transformers.
There was also the question of maintenance in a space only just large enough fo contain the transformers and the main switchboard. Because Pyroclor is chemically inert no maintenance is required and the initial charge of fluid should last for at least 30 years without replenishment or attention.
Because the transformers are close to the main switchboards and to the plant (risers from the main switchboard supply each floor individually), long runs of costfy fow-tension cable--as well es the power losses caused by such cable--have been avoided. Economies made in this way are considerable.
0221169
TOWOLDMON0025837 WATER_PCB-00010306
TOWOLDMON0025838 WATER_PCB-00010307
fc^ry
H
^4
1
M'prr/- -C.t
L-/. I'V T" :rjv.
--..... J
--. v -;
.;.' i;di .,, *,* *
--v \
v, !.A--'
V -*cu? *' '.* .-- * )r
; .' ' ^-r"
.. \i- fev'V\3 vr
.. ? &
I
In Motor Tyre factories
As in many other modern factories it is important to locate distribution transformers close to the plant they serve and to eliminate the expense of low-tension cable runs. But if the factory has a fire hazard, as in a large motor tyre plant, such economies are impossible to achieve unless Pyioclor transformers are specified.
At the Goodyear Tyre & Rubber Company's works in Glasgow, electric power and lighting demands are met by one 1250 kVA and four smaller transformers, all sited inside the factory buildings. Three have been installed in major control rooms and the other two on platforms high above the production shops. The aim in choosing these sites was to place transformers as close as possible to the various load centres without encroaching on valuable production space at floor level. This was made possible by using Pyroclor transformers.
The main transformer installation at the Belfast factory of Michelin (Belfast) Ltd., is oil filled. Even so, the six 40 kVA transformer/transductors, six BO kVA transformers and four 100 kVA transformers on tho shop floor, where the (ire hazard is greater, arc filled with Pyroctoi.
Pyroclor transformers ate also used at the Firestone Tyro factory, South Africa. In countries where higher 8mbienl temperatures are experienced, tho high thermal stability of Pyroclor is an added advantage which has contributed to its general use in such areas.
21
02Z1171
TOWOLDMON0025839 WATER_PCB-00010308
uaw*--a.
0221172
|
TOWOLDMON0025840 WATER_PCB-00010309
In Oil Pipeline Systems
With completion of a new 500-mile pipeline by Constructors John Brown Ltd., over the Atlas mountains, from the Sahara Desert to the Mediterranean coast, e further 10 million tons ol crude oil a year will flow from the Algerian oilfields of Socidl6 Nationale de Transport et de Commercialisation des Hydrocarbures (S.O.N.A.T.R.A.C.H.).
At the Arzew terminal on the Mediterranean, where light crude oil is stored ready for loading into sea-going tankers, a 500 kVA Pyroclor transformer has been placed beside the main switchroom. Two more, one of 150 kVA and one of 200 kVA, have been installed at a nearby tanker de ballasting station and in the maintenance workshop.
The advantage gained by nstalling Pyrocfor-filled transformers was the freedom from fire risk when pumping a light crude oil at ambient temperatures which may vary between --2VC and -! 50fC. By minimising this risk it was possible to obtain belter insurance rates and to conform with the practice in Algeria, where all existing oil plants have transformers with fiie-rosistant filling.
All units supplied tor the S.O.N.A.T.R.A.C.H. project are hermetically sealed and will require little maintenance--a factor of some importance wfioro unskilled staff are being trained to toko over. And because the transformers were sited close to the plant long cable runs have been avoided.
TOWOLDMON0025841 WATER_PCB-00010310
-'I*/
- ..,, --S ;-- J I B 1)
!*" ~*"!L
&*;.. ` i , iv i
--- r -T
] > A j'r vir*
: '
~ ' ' ' v-
'"
v J 'jSKSSH-v.Er3Si-JKS22Ba.a
l^rAK
The latest methods of town gas production are presenting plant designers with a number of new end interesting problems, derived from the inflam mable nature of raw materials and from tho large amounts of electric power required for the reforming process. A modern reforming plant may need up to 10MW to drive motors for fans, feed pumps, hydrogen compressors, cooling tower pumps and other machinery.
A further problem is space limitation. Most of the new plants must be erected on sites already occupied by coal-fcd stations, and the latter cannot be removed until the new equipment is in fuff production. Both must operate together at first.
Finally, there is tho question of reliability. The new installations usually comprise a number of separate gas-making units built into a common process. An electric power failure would halt the whole complex, and it might take several hours to bring a 120 million cu. ft./day output back on stream.
The North Thames Gas Board's new plant at Slough, built by Woodall Duckham Ltd. on the site formerly occupied by a coal carbonising plant, will have an output of 80 million cubic feel of gas a day. Space was a critical factor, and the only way to fit three transformers into an area set aside for two was to specify 3 x 1500kVA Pyroclor-filled units to avoid the need for fire walls between and around them. They will work in patallel with auto matic protection equipment; and should any of the thiee units faif, the load will be automatically transferred to the other two. All aie hermetically sealed end although their initial cost will be higher than equivalent oil-tilled units, it is anticipated that maintenance costs will be lower.
0221175
TOWOLDMON0025843 WATER_PCB-00010312
Pyrocloi transformers iffll at the North Thames Gas Board, Southall, have operated successfully since 1958.
PyrOi.lc>' i -nMum.' lor uv d a: North T Ik C-?.s lh'''!
lib
TOWOLDMON0025844 WATER_PCB-00010313
Pyroclor transformers at the North Thames Gas Board. Southall, have operated successfully since 1958.
1
I
On the same West London site, there is a 15-million cubic-feet-per-day peak load reforming plant which is fed with 10D0 BTU methane gas. This plant is supplied with electricity from two 500kVA transformers which again are Pyroclor filled, chiefly because a gas main runs across the only site available for the unit.
Pyroclor has the advantage of being chemically inert; it does not deteriorate in any way with time, consequently no maintenance is required and the Initial charge of fluid should last for al least thirty years without replenish ment or attention.
This was a factor in the choice of Pyroclor transformers for the Slough Works and also for the new 120-million cubic-feet-per-day Town Gas Plant, Romford Works of the North Thames Gas Board. This is the largest capacity gas producing unit yet ordered by the British Gas industry. Here there will be one group ol 3 x lOOOkVA and one group ol 3 x 1500kVA Pyroclor trans formers on a site which may also have to be occupied by tanks containing light distillate spirit. The reformers in this plant are fully instrumentated and will be operated by a very small staff. It is therefore important that mainten ance requirements should be kept to a minimum.
Other Gas Boards who have specified Pyroclor transformers for reasons of
space limitation and reduced maintenance areThe North Western Gas Board
at Preston where four 1 500 kVA units are in service whilst plant reconstruc
tion is underway.
~
At the North Thames Gas Board, Southall, Europe's largest gas plant, two $00 kVA Pyroclor transformers have been operating since 1958. Pyroclor transformers were chosen because of possible fire hazard and drainage ph considerations if conventional oil-filled units had been used. Furthermore, problems of space and cost precluded the use of air-cooled transformers.
27
OZZU77
TOWOLDMON0025845 WATER_PCB-00010314
large numbers of Pyroclor transformers performing various duties at the Chance- Pilkinglon Optical Works, St. Asaph, N. Wales.
0221178
TOWOLDMON0025846 WATER_PCB-00010315
Pyroclor for Glassworks duties
'WWW
Where large numbers of transformers are required for different duties os, for example, in a modern glass works with electric furnaces and electrically driven machinery, L.T, cable costs can become astronomical unless the transformers con be sited close to the equipment they are to serve. This often means that only Pyroclor fire-resistant transformers can be considered for most duties, and at Chance-Pilkington Optical Works, St. Asaph, N. Wales, 8 total of 19 such units have been installed.
Four 750 kVA transformers are the main source of power, witli 15 special transformers and reactors, to supply the various furnaces. Tho latter include 1 x 200 kVA, 5 x 150 kVA, 1 x 100 kVA, 6 x 50 kVA and 2 x 37.5 kVA units. All are located at load centres inside the factory itself and Ihc use of Pyroclor has saved fire protection costs, reduced maintenance and by far tho greatest saving has come from the reduced lengths ol L.T. distribution cable required.
0221.179
TOWOLDMON0025847 WATER_PCB-00010316
Pyrodor transformers were- installed at tlit' now Banbury Works of Alfred Bird & Sons Ltd. because of the reed for adequate fire precautions.
0221180
TOWOLDMON0025848 WATER_PCB-00010317
QQ
For Food Processing installations
In a modern food factory, where electric power may be required for boilers, ovens, dryers, refrigerators and furnaces as well as for mixing, grinding, sorting and packaging machinery of all kinds, the cost of L.T. distribution cable from power sources to the various load centres can be very high unless the transformers used are sited close to the equipment they are to serve.
For the new works at Banbury, England, where Maxwell House coffee is manufactured by Alfred Bird and Sons Ltd., 3 x 1000 kVA Pyroclor transformers ero sited inside the building and 3 x 1750 kVA, owing to space limitations, ere outside but close to the factory wall. Wherever there was space for a transformer to be installed close to the equipment it would supply, savings resulted from the reduced lengths of L.T. feeder cable.
In all cases significant economies have resulted from the choice of trans formers filled with Pyroclor. Their use in place of oil-filled units has made elaborate fire-precautions such as fire walls and oil-retaining sumps or pobhle drains unnecessary, with a consequent saving in space as well as direct cost. Nor did special fire-protection equipment have io be provided.
In this now C7-million factory Alfred Bird & Sons Ltd. are very conscious of Iho need for fire precautions and appointed the Oxfordshire County Fire Sorvice as advisers to the architects and engineers for the new factory before detailed planning began. Consequently, fire precautions have been taken info consideration in every stage of the project, from the layout of the site roads, to give easy access for fire-fighting vehicles, to the structure of the building and the equipment used, including Pyroclor-filled transformers.
31
TOWOLDMON0025849 WATER_PCB-00010318
Regd
Monsanto House 10-18 Victoria Street London SW1
Telephone: Abbey 5678