Document QX8ZYe2DeJ5rGwDXromLxEegv
LSASD Project ID: 24-0274
Georgetown Sewage Treatment Plant #1
NPDES Compliance Evaluation Inspection
632 N Broadway Georgetown, KY 40324
Project Date(s): July 9th, 2024
Report Date: September 12, 2024
FSBFORM-1403-R0 073024
Project Leader: Asher Sampong Water Quality Section Field Services Branch Laboratory Services & Applied Science Division USEPA - Region 4 980 College Station Road Athens, Georgia 30605-2720
LSASD Project ID: 24-0274
Page 1 of 6
Final Report
FSBFORM-1403-R0 073024
Project Requestor:
Jairo Castillo, P.E. Section Chief Wastewater Enforcement Section Enforcement and Compliance Assurance Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, GA 30303 404.562.9756 (office)
Analytical Support: NA
Approvals:
CHRISTOPHER MCHUGH
Digitally signed by CHRISTOPHER MCHUGH Date: 2024.09.12 12:23:10 -04'00'
Chris McHugh, Report Author Water Quality Section Field Services Branch
Date
Approving Officials:
JOHN RUIZ
Digitally signed by JOHN RUIZ Date: 2024.09.12 12:48:51 -04'00'
John Ruiz, Technical Reviewer Water Quality Section Field Services Branch
Date
GREGORY WHITE Date: 2024.09.12 12:37:57 -04'00' Digitally signed by GREGORY WHITE
Greg White, Supervisor Water Quality Section Field Services Branch
Date
MICHAEL AMMONS Date: 2024.09.12 13:01:53 -04'00' Digitally signed by MICHAEL AMMONS
for Jairo Castillo, P.E., Supervisor Wastewater Enforcement Section Water Enforcement Branch
Date
LSASD Project ID: 24-0274
Page 2 of 6
Final Report
FSBFORM-1403-R0 073024
1. Introduction
On July 9th, 2024, staff of the United States Environmental Protection Agency (EPA) Region 4, Laboratory Services and Applied Science Division (LSASD), conducted a National Pollutant Discharge Elimination System (NPDES) Compliance Evaluation Inspection (CEI) at Georgetown Sewage Treatment Plant (STP) #1 in Georgetown, Kentucky. The inspection was conducted under the authority of Section 308 of the Clean Water Act (CWA), as amended, and followed the procedures listed in the LSASD Project No. 24 - 0274 Sample and Analysis Plan (SAP). This report presents the results of the inspection. Table 1 lists the sampling participants and facility staff.
Table 1 - Inspection Personnel
Name Asher Sampong Chris McHugh Samantha Chisley
Organization EPA Region 4 LSASD Inspection EPA Region 4 LSASD Inspection Georgetown STP #1
Operator
Date on Site 07/09/2024 07/09/2024 07/09/2024
Contact Info sampong.asher@epa.gov mchugh.christopher@epa.gov
schisley@gmwss.com
2. Inspection Procedures
The objective of this inspection was to evaluate the condition of the STP and the permittee's self-monitoring program and offer compliance assistance as needed. Specific tasks included conducting an opening conference, interview facility staff, conducting a facility walkthrough, conducting records review, observing the receiving waters, and a closing conference.
3. Facility Description
The Georgetown STP #1 treatment system includes automatic bar screening, grit removal, oxidation ditches, primary clarifiers, followed with ultraviolet disinfection. Waste sludge is thickened, dewatered, and sent to a landfill for disposal. The facility is currently building an entire new treatment system scheduled to complete by 2027. The modification will add: New Parshall Flume Channel, New Pretreatment Building, New Grit Removal System, New Sequencing Batch Reactor System, Converted Post EQ-Existing Clarifiers, New Tertiary Filter System, New UV Disinfection System, New Post Aeration, New Effluent Parshall Flume Channel, New Cascade Aeration Steps, New Aerated Sludge Holding Tanks, New Solids Dewatering Building, New Septage Receiving Station, New Plant Drainage Pump Station New Chemical Feed and Storage Building, Converted Wet Weather Storage Basin ( Old Oxidation Ditch ), New
LSASD Project ID: 24-0274
Page 3 of 6
Final Report
FSBFORM-1403-R0 073024
Electrical Building, New Emergency Generator, and a New Administration Building. This will double the treatment capacity to 9.0 MGD.
4. NPDES Permit
The facility's National Pollutant Discharge Elimination (NPDES) permit number KY0020150 was issued (renewed) by the State of Kentucky on October 1st, 2022, and expires on September 30, 2027. The NPDES permit allows the STP to discharge an average of 4.5 million gallons per day (MGD) of treated wastewater into Lanes Run through Outfall 001. The permit includes effluent limits for Total Suspended Solids (TSS), 5-day Carbonaceous Biochemical Oxygen Demand (CBOD5), Phosphorous, pH, Dissolved Oxygen (DO), Ammonia Nitrogen, Total Nitrogen, and E. coli. Permit will be effective until the new treatment system is completed and reissued upon completion.
5. Records and Reports
I. Discharge Monitoring Sheet Review
The facility had several permit limit exceedances in the last 12 quarters for CBOD5 and TSS. Additionally, a formal enforcement action was issued by the State of Kentucky at the end of 2023 (KY-DOW-21-3-0241).
Table 2 - EPA ECHO Permit Limit Exceedances
Period 07/0109/30/23 04/0106/30/23 04/0106/30/23 01/0103/31/23 01/0103/31/23 01/0103/31/22
Parameter Ammonia
E. coli Ammonia
CBOD5 TSS TSS
Permit Limit 3 mg/L
240 #/ 100 mL 7.5 mg/L 15 mg/L 45 mg/L 45 mg/L
Report Value 3.7 mg/L
442 #/ 100 mL 10.7 mg/L 144 mg/L 491 mg/L 223 mg/L
Statistical Basis Daily max
concentration 7-day geometric
mean Daily max concentration Daily max concentration Daily max concentration Daily max concentration
II. Records Review
The facility maintains all its discharge monitoring reports and analytical records onsite and had at least 3 years of DMR records and 5 years of sludge records available.
LSASD Project ID: 24-0274
Page 4 of 6
Final Report
FSBFORM-1403-R0 073024
III. Flow Measurement
The facility uses a 2 ft. Parshall Flume and ultrasonic flow meter to measure and record effluent flow rate. The ultrasonic flow meter was last calibrated 07/2023. An instantaneous flow check was conducted, and the secondary flow rate was 5.4% from the primary flow rate which is within the recommended 10% referenced by the NPDES Compliance Inspection Manual.
IV. Sampling Review
The facility collects and analyzes 24-hr time-based composite samples for its permit listed parameters as specified in the NPDES Permit KY0020150.
6. Operation and Maintenance
The facility is operating and maintaining its treatment units to meet its NPDES permit requirements. Facility is currently building a new treatment plant on-site.
7. Effluent and Receiving Waters
The effluent discharge was clear and free of any excessive foam in the receiving stream.
8. Discussions and Findings
The rotating biological contact disc was not operational on one side of the oxidation ditch and the sludge appeared to be dark in color with bulking. This could lead to lack of nutrient removal if the dissolved oxygen isn't maintained at the correct range. Facility stated that it was waiting on procurement of necessary parts. (Figure 1).
LSASD Project ID: 24-0274
Page 5 of 6
Final Report
FSBFORM-1403-R0 073024
Figure 1 - Oxidation Ditch End of Report
LSASD Project ID: 24-0274
Page 6 of 6
Final Report