HEALTH & SAFETY COMMITTEE MINUTES
AUGUST 2, 1991
o
AGENDA
1. This month's Audit Area Manager(s) 2. Unit Audit(s)
UNIT AUDIT(s ^
Area
Lube Logistics Lube Manufacturing Aromatics Dispatching Operations Utilities Systems Utilities Production
Audit Date
6/7/91 6/7/91 7/5/91 8/2/91 9/6/91 9/6/91
ResDonse Due = Received
8/7/91 8/7/91 9/5/91 10/2/91 11/6/91 11/6/91
08/30/91 09/30/91 OVERDUE
ITEM * 1-3/91: 2-4/91: 4-5/91:
5-6/91:
OLD BUSINESS:
Are the grinders in the Field Zone Shops on an Audit Program? If so, who does this audit?
Action: M. W. Smith/Darren Martin, H&S
Response: Currently, the BA's have responsibility to maintain the grinders. PENDING COMPLETION.
At OPII, the outside operators have been experiencing sore throats when working around the boilers (pitch?).
Action: Wayne Austin, Industrial Hygiene
Response: Barbara Bessette-Henderson is investigating, Report will be made to the Committee. PENDING COMPLETION.
What is Shell policy for employees to be able to take PPE home for personal use? There are many jobs around the home that need the use of PPE such as trimming, shop work, and lawn care.
Action: H&S Department
Response: Under review by the H&S Department; will discuss with Security and the Family S.A.F.E. Team. PENDING COMPLETION.
Anti-skid project at the Major Resins Warehouse is being
reviewed at this time. The test areas were reviewed and the
action had been set to apply the anti-skid material to the
areas concerned. Committee is putting this item back on the
agenda for a response back from management.
LAM 004184
2
DPMC-10272
Action: S. L. Hogue
Response: The test areas met the requirements. The remainder of the fork lift travel area of the floor to be coated has been put on the 1992 budget. Due to operation needs, the floor will not be completed this year unless money becomes available this year. Fork lift drivers will be informed to
drive slower until the project is completed. PENDING COMPLETION
6- 6/91: There is a concern about ladder inspections not being done. Also, metal ladders are being brought into the Complex by contractors to the sub-stations.
Action: Smokey Mathers, Carpenter Shop
Response: A study group has looked at the program and determined we are not in compliance. The study group {Randy Sapp is team leader) is in its final stages of completion. The new ladder order (M-114) will cover concerns about inspection and tagging. PENDING COMPLETION.
7- 6/91: Member asked about the implementation of triplicate permits?
Action: H. E. Craddock
Response: Triplicate permits will be implemented as part of the updated S-103 package. PENDING COMPLETION.
8- 6/91:
There has been a report that during Chemical safety meetings if safety items which are not on the agenda, are not allowed to be brought up for discussion. Safety issues should be brought to management's attention immediately. [7/5/91] It
was determined that this issue still needs to be worked on.
Action: W. M. Boaze, Safety Inspect'or/Ed Koch
Response: If there is a safety concern, it should he brought up immediately to management's attention. One should not wait until there Is a safety meeting. Items discussed at
a meeting should follow the agenda. If there is still a question on a safety issue, contact your foreman or supervisor after the meeting. E. M. Hawthorne & S. Smith will visit with Maintenance management and discuss this item. PENDING COMPLETION.
9- 7/91:
At the BPA2 warehouse, employees are getting covered with Resins dust. There are not any facilities available to blow the dust off as policy refers to air might blow resin into employee's skin. There is a concern that they could be eating without removing the contamination off their clothes. Is there a vacuum system that could be used for removing such dust?
Action: W. B. Austin
3
DPMC-10273
Response: Monitoring will be conducted by H&S. Also, information about a suitable HEPA vacuum cleaner will be provided to BPA. PENDING COMPLETION.
10- 7/91: Maintenance is not being performed; i.e., broken plastic bags are piling up in the warehouse due to a continuously broken-
down compactor and the roof of the super sacker room is very dusty.
Action: S. L. Hogue
Response: PENDING COMPLETION.
11- 7/91: BPA Warehouse: Personnel are having a problem getting clean FRC's returned. This area provides a dirty working environment and needs a more frequent clean clothes turnover.
Action: Donna Fondaw
Response: PENDING COMPLETION.
13- 7/91: Has Medical recommended that lifting belts should not be worn on a permanent basis?
Action: Medical/E. M. Hawthorne
Response: PENDING COMPLETION.
14- 7/91: Carpenters are cutting wolmanized plywood. The MSDS states that cutting these type of wood could cause respiratory problems.
Action: W. B. Austin
Response: Any wood dust can cause respiratory problems inhaled in sufficient quanity. H&S will monitor this operation and report back to the committee. PENDING COMPLETION.
if
16-7/91:
BA's are inconsistent with policy on when electricians working on 440 can work alone or reguire a buddy. New safety order w/revised guidelines are being presented to HSMT. These guidelines identify what jobs should be performed with two people. Also, when a motor trips, re-energization should not be done unless you have identified the problem (per OSHA). What is the current policy on starting breakers?
Action: S. Breaux/D. Martin
Response: Many of the Electrical Safe Work Practices issues are currently being worked by Head Office Electrical. When these issues have been resolved and the final guidance is provided, the DPMC requirements will be finalized. PENDING COMPLETION.
3-8/91: All VTI vacuum trucks are not equipped with R/V's. What are
4
LAM 004185
DPMC-1027
the precautions used for venting products?
Action: C. A. Wesley
Response: PENDING COMPLETION
4- 8/91: On 8/1/91, barricades were put up for a leak occurring west of LOFU; no one was notified through the UCC system. Why didn't
UCC make an announcement?
Action: G. L. Buchanan
Response: There was a leak on a gas oil line in the pipe rack. Product from this line blew across the road requiring the road to be blocked off until the leak was secured and the roadway cleaned. There was not a need for UCC to be notified due to the nature of the product and the duration of the leak.
Should this have been a major release or a product of a serious nature, UCC would have been notifed and the Gas Release Alarm sounded. COMPLETE.
5- 8/91: Are respirators used during fit testing properly sanitized between test? Is the current swab system adequate to prevent contamination?
Action: W. B. Austin
Response: Respirators are sanitized between fit tests using 70% isopropyl alcohol. Medical has not observed an increased incidence of respiratory tract infections during fit testing periods. A database search, conducted by Head Office, has Indicated taht isopropyl alcohol is considered an effective
antiseptic. PENDING COMPLETION
6- 8/91:
The OP2 truck loading rack has an inline-drips drum that is used to catch any liquid before it goes to vent. At one time, the drum had a level indicator which is not missing. How is the liquid level controlled without an indicator? [9-9/91] 0P2 vent line @ truck loading rack still pressures up and vents to air. This concern was brought up in previous H&S meetings and was to have been resolved.
Action: Kenney Moore
Response: The inline-drips drum was installed temporarily until the source of vent liquid was determined. It was determined there was a faulty spring-loaded valve in the vent line which has been replaced. After further evaluation, it has been determined that the drum is not necessary and will be removed. PENDING COMPLETION.
NEW BUSINESS:
1-9/91: What is B&R's policy for their employee to go to Medical?
Action: E. M. Hawthorne 5
LAM 004186
DPMC-10275
Response: PENDING COMPLETION.
2-9/91:
A Department had a propane site glass blow out. This site glass had been out of service for maintenance. What are the requirements on installation and maintenance of site glass?
Action: R. A. Carrel1
Response: PENDING COMPLETION.
4-9/91:
At the Docks C Station, several RV's had been taken out for over 24 hours without proper notification. What are the requirements for removal of relief valves?
Action: J. L. Williamson
Response: PENDING COMPLETION.
5-9/91: Has there been a survey conducted on leukemia in Aromatics. If so, what were the results?
Action: W. B. Austin
Response: PENDING COMPLETION.
7-9/91: A CAT was formed in May to study the series of tubing blowouts 0 LHT2. Has any report been issued from the team?
Action: J. A. Gantenbien
Response: PENDING COMPLETION
8-9/91:
There was a contractor wearing blue FRC's and Shell hardhat. This person is an outside inspector. What is the policy on
FRC color for contractors?
Action: Angie Svoboda
Response: PENDING COMPLETION.
AGENDA
1. W. T. Purves, Superintendent Operations and Bill Wendes, made a presentation to the committee regarding inspection program and current conditions of tanks, and the upgrade plans.
2. Tony Maggiore, Manager Utilities Systems, made a presentation to the committee on the Utilities organization, and safety activities.
3. B. T. Waggoner, Manager Utilities Production, made a presentation to the committee regarding his area. He gave an update on boiler maintenance work and their training program.
LAM 004187
6
DPMC-10276
4. Committee auditied Utilities Production and Utilities Systems.
5. EMH discussed the National Safety Council Congress in New Orleans for the Health & Safety Committee training program.
6. Darren Martin, Safety Engineer, made a presentation on safety showers.
7. Discussion was held on FRC & heat stress while wearing chemical suits. Cool vests are available at the Respirator Center.
Gary L. Buchanan Attachments
LAM 004188
7 DPMC-10277
HEALTH SAFETY COMMITTEE AUDIT
SEPTEMBER 6, 1991
PLEASE RETURN RESPONSE WITHIN TWO (2) MONTHS OF INITIAL AUDIT
OP-IZ BOILERS 1. Hose racks do not have any hoses on the racks. 2. Fire Steam location do not have hoses in some cases and
lances in others. 3. Steam hose (fire) at muffler lance missing. 4. Goggle painted strips on boilers deck needs to be
painted, this can not be seen at this time. 5. General area and Chemical injection area in good shape. 6. Pitch on landing and ground at FT-130.
80UTH UTILITIES 1. Instrument air dryers VU-217/216 - RVs have no discharge
tail pipes. Personnel hazard? 2. RVs are 12*-14' above grade. 3. Safety shower near MCC EE-27 needs to be painted. Also
goggle area boundary. 4. T-UT-912 insulation damaged on 2" line to top of tank on
east side. (Asbestos?) 5. 1" Plant air line on east side of TU-908 supported
poorly with rotten lumber. 6. 25 gallons and 1 55 gallon drum at P-920
(Housekeeping). 7. Personnel protecting insulation up walkways to top of
TU-908, 909 coming apart. Would blow off in high wind. 8. Fire monitor between TU-908 and 914 needs to tje painted
for recognition.
MTH261
LAM 004189
DPMC-10278
9. Housekeeping good at P-901 and 902. 10. Long piece of tubing west of TU-915 on ground - tripping
hazard. 11. Tubing dangling at several places around P-920. 12. Storm sewer plugged under VU-502. Water (hot) is deep. 13. Manifold on bottom of VU-502 needs cap (has no FT6) . 14. Goggle area sign east of VU-501 not clear as to where
the goggle area is. 15. Gauge glass on EU-501 not capped.
EAST UTILITIES 1. Fire extinguishers North of PIC-516 out of date. 2. Chlorine cylinder, upright without chain around them
(operator addressed problem). 3. Control room cramped - noticed some pieces, of Bunker
gear rolled up and stashed in end of control room cabinet. Suggest a more accessible/noticeable place to hang up gear. 4. General outside housekeeping good. Area behind control board needs attention.
RIVER WATER STATION 1. Drain E of P-1797 plugged. 2. Knocker on isolation valve going to VCM is B.O. - has
been since April.
POWER PLANT 2 WATER TREATER - UCC 1. (Feed BackT No alarms or procedures for operator work in
acid area (Safety Showers). 2. Standing water all the time (Water Treater). 3. V-7009 ladder has no safety chain. 4. S-397 piping on top of ground creating a tripping
hazard. Also no lighting in this area.
MTH261
LAM 004190
DPMC-10279
5. No bleeder in valve tried to caustic line on west side of S-398.
6. Nails in walkway between S-397 and 398 need hammered down - tripping hazard.
7. Several bleeders throughout area not plugged.
8. Valve stem in walkway needs to be turned. North west of H-313.
9. 10.
Ladder at Material Delivery 21-2 not inspected and no tag.
Goggle area needs to be repainted or identified at SS401 area and at building housing V-7008 and 009.
11.
Safety Showers don't have alarms and no procedure in place when operator is working in acid areas. (IMMEDIATE CONCERN)
12. Boiler 2-1, ID Fan Trap, steam leak, loud.
13. Steam leak at main PIC "packing" - loud.
14. Tarp hanging out of pipe rack at Boiler 2-2.
15. Boiler 2-2 broken conduit on Igniter.
16. Tubing and loose material on decks (site glasses, fire blankets, air horns, light guards.
17. Does the Step Up Platforms need hand hold "rails"?
18. PHE - goggle area needs paint, or out of service signs and barricade.
19. Main gas line bleeders not plugged at Boiler 2-2.
20. Ditch out fall containment, wash out around wall, needs repair.
21. Maint. facility fire ext. last checked October 1990.
22. No face shield at grinder.
23. Housekeeping is the pits.
24. Question the use of inside bolts locks on C/R doors.
25. Main gas line at C/R - no bleeders plugged. -
26. Kitchen fire ext. location not permanently marked.
MTH261
LAM 004191
DPMC-10280
27. Temporary wiring to fitch machine needs repair.
28. Step ladders not inspected, no inspection tags.
29.
Fresh air C/R cabinet, 3 masks area for 2 to be stored. Also empty Scott portable box's "3" in C/R. Mote: Both PP2 and UCC Scott Air Packs will be due annual inspection this month.
CPS
1. Dept safe work permit #604028 signed off by operation but not Maintenance.
2. Tile in restroom needs good clean up (mildew, etc. in grooves).
3. 2" hose hooked up to S-328 not blinded.
4. Air hose on rack west of S-328 has end cut off. Needs to be disposed off.
5. Water leaking FU-4306A. Causing algae growth and possible slip hazard.
6. Several places where water leaks have caused algae growth and slip hazards.
7. West door of South gear room of 205 doesn't close properly.
8. Table of contents missing from 1 Safety Order Book.
9. Empty Scott Air Pak suitcase in control room.
10. Scott Air Pak in control room due for annual inspection.
11. Don't we need safety showers outside the battery rooms?
12. Rain water trapped on walkway on South side of boiler 2nd floor outside burners H-8620.
13. Main FW system header valves not labeled by boiler stacks.
14. Why is there a Mandatory Goggles area sign by TP-8620 West side? Where are goggles needed?
15. Coupling guard on P-8606, 07, 08, 40, and 41 not bolted down.
16. Swan stations poorly marked throughout unit.
MTH261
LAW 004192
DPMC-10281
17. Equipment not labeled well in area of P-8661. 18. Coupling guard to pumps to the west not bolted down.
SURFACE WATER CLARIFIER
1. Housekeeping in restroom needs attention.
2. Housekeeping behind control board needs attention.
3. Fire extinguisher in SUB 232, 233 needs to be inspected.
4. 480 volt MCC, west of control room, operations not using the proper tags on locked out equipment.
5. Broken chair back in control room at computer terminal.
6. Scott Air Pak face mask not in plastic pouch (inside control room).
7. Area around sink needs attention.
8. Rain gear should not be hung on portable eye wash inside control room.
9. Fresh air cabinet standing open only one mask in cabinet.
10.
Might be a good idea to consider putting fresh air header further away from chlorine cylinders - as it is, it may be necessary to walk through leak to get to fresh air.
11. Eye wash north of sulfuric acid tank needs to be flushed frequently - water very rusty and dirty.
MTH261
LAM 004193
DPMC-10282
DEER PARK MANUFACTURING COMPLEX HEALTH & SAFETY COMMITTEE SEPTEMBER 6, 1991
Member
PROFS
L. L. Contreras* W. P. Charles J. L. Dunn* C. P. Ebanks* C. E. Green* w. L. Harbuck* E. M. Hawthorne* M. D. Leaverton* C. P. Meeks s. R. Prichard* M. W. Smith* S. W. Smith* G. Thieler*
WPC JLD29 CPE9 CEG3 WLH29 EMH29 MDL29 CPM29 SRP MWS SWS29
Alternate
H. P. Corley J. A. Lummus E. Morales D. A. Skeahan* G. L. Buchanan*
HPC JAL9
DAS1 GLB29
Present at Meeting
SAM 62347
60929 62348
60413 60419 62342
TEL
66381 66850 67117 67471 66264 67558 66902 66259 66611 67224 66285 67510 67058
BEEPER *
549-1266
549-6715 549-9979 549-1218 549-2456
549-5713 549-7573 549-9486 549-0922 549-9980
60436 66775 . 62341 69380
66670
66982 67357 67420
549-9744 549-7250
549-0688 549-1097
PROPOSED NEXT MONTH'S AGENDA
1. This month's Unit Audit Manager(s) 2. Unit Audit(s) 3. Review of this month's Audit with the Manager(s) concerned 4. Next Meeting - October 4, 1991
LAM 004183