G^&t7%0c6icfc W Ckmim& INC. ESCAMBIA PLANT INTEROFFICE MEMORANDUM
To: R. E. Davis
From: E. A. Primeau Re. PVC Monthly Report
January, 1973
Dots: Copies:
February 8, 1973
SUMMARY
Prime resin production for January was 5, 440 M pounds versus a budget of 5, 300 M pounds and a January 20th forecast of 5, 400. M pounds. Off-grade, tails and sweeps amounted to 60 M pounds which represent 1. 1% of total production versus a budget of 4. 5%.
A total of 623 charges were made--an average of 20 per day.
R. F. E. data for the installation of a 3, 700 gallon reactor as No. 12 reactor was prepared and submitted to the Valley Forge Accounting Department on January 26, 1973.
An R. F. E. was prepared to purchase the valves and actuators necessary to automate the charge system on No. 11, 5, 000 gallon, glass-lined reactor.
The variance generated by PVC for January was ($266) The variance resulted from:
1) PVC Bulk 2) PVC Bagging
($2, 565) $2,299
The forecast variance on January 20th was $2, 100 favorable. The item affecting the variance were:
Forecast
Actual
Raw Materials Process Costs Volume Machine Hours
($2, 000) ($1,400)
$1. 000 $3, 000
$ 600
$1, 316 ($6, 093)
$1, 121 $3, 300 ($ 266)
AP00040799
R. E. Davis PVC Monthly Report - January, Page 2
1973
ANALYSIS OF VARIANCE
Raw materials were favorable due to a favorable variance in vinyl chloride of $2. 5 M, in process chemicals of $2. 2 M, and in royalties of $1. 5 M. This was partially offset by an unfavorable variance in by-product credit of ($4. 9) due to low production of off-grade.
Volume variance was $1. 1 M favorable due to above budget production of resin. Machine hour variance was $3. 3 M favorable due to January being a 31-day month. Projected production for month of February is 4, 900, 000 pounds with a favorable variance of $2, 400.
DISCUSSION
During January, the PVC plant produced six resin types. One type 1230 P accounted for 49. 9% of the total prime resin production.
The Alpine Mill was utilized to regrind 2, 000 pounds of 3185 resin produced at Calvert City. Almost no size reduction was obtained from the first mill pass and only 4185-2S was produced in the second pass through the mill. A separate memo was written to V. J. Grande, detailing the work done.
CHEMICAL CLEANING
The new recovery jets arrived in mid-January and were installed. The modification and installation of the larger evaporators was completed and put into operations on January 20th. Currently, the unit is being tested. Thus far, the feed to the Artisan unit has been increased from 600 pounds per hour to 780 pounds per hour. However, the Moyno pump has been plugging an average of two to three times per day.
On January 31st, a section of the inner shell of the Rototherm unit collapsed. Maintenance is attempting to repair the shell but a new shell will have to be purchased and installed as sections of the shell wall measure 3/16" as opposed to the original thickness of 7/16". A drawing of the unit has been sent out for quotes. Artisan wants $11, 000 for the shell and have a delivery of 26 to 30 weeks.
AP00040800
R. E. Davis PVC Monthly Report - January, Page 3
1973
PVC EXPANSION
Data required for an R. F. E. to install a 3, 700 gallon stainless steel reactor was sent to the Valley Forge Accounting Office on January 26, 1973. Additional cases are currently being studied for the installation of a 10 M gallon or 20 M gallon stainless steel reactor.
PVC BAGGING
A total of 2, 185 M pounds of PVC was bagged at a cost of $11, 511 in January. Variance is as follows:
Volume Spending
Total
Actual
$ 549 $1, 750
$2,299
Forecast
$ 500 $1, 000
$1,500
PVC LOADING & SHIPPING
A total of 5, 589 M pounds of resin was shipped from Pace. Starting resin inventory was 599 M pounds and closing inventory was 518 M pounds.
EAP:lm Attach.
<> E. A. Frimeau
AP00040801
STATISTICS
January
Actual
Budget
Prime Production Homopolymer Subtotal
5. 440 5, 440
5, 300 5, 300
Off-Grade Homopolymer Tails Sweeps Subtotal
0 50 10 60
231
Total Production
5, 500
5, 531
O. G., % Total Prod. Bulk Prod. , % Prime VCM Efficiency % Reactor Avail. % Production, #/Gal. Yr.
1. 1 60. 0 93. 6 95. 1 1, 343
4. 5 94. 5 92.5 1, 307
Off-Grade Analysis
Production Sequence - January
None
North Line
Type
Batches
2160 2185 2200 2160 2250 1225 2200 2160 2250 2200 1225 2250 2200
7 5 29 9 11 19 31 22 19 60 32 31 5 280
Year-to- Date
Actual
Budget
21, 487 21, 487
21, 029 21, 029
0 225
36 261
21, 748
1. 2 59.2 93. 0 94. 3 1, 337
-
943
21, 972
4. 5 -94. 5 92. 5 1. 3 07
South Line
Type
Batches
1225 1230
1225 1230 1225
13 129 34 162
5 343
AP00040802
Statistics - continued Page 2
Production Summary - M Pounds
Type
January
1160 1200 1225 1230 1250 2160 2185 2200 2225 2250
--
917 2,7 T4
--
314 31
990 -474 5, 440
Downtime Analysis - Hours
Cleaning Reactors Schedule Charges Behind on Recovery Hold to Drop Plugged Drop Valves Change Type Slow Drying Hydraulic Motor Maint. Misc.
January
532 22 152 69 44 10 20 34 54
937
Year-to-Date
17 15 3. 826 10, 225
853 132 4. 3 00 546 1, 644 21, 558
% Year-to-Date
6.5 0. 3 1. 8 0. 8 0. 5 0. 1 0. 2 0. 4 0. 7
2, 172 344 432
519 100
87 274 121 177
11.3
4, 226
%
6. 7
1. 1
1.. 3 1. 6 0. 3 0. 3 0..8 0. 4 0-5
13. 0