Document QX6Ok4GMnNORkJL9qnGMbz4K4

TSD CHARTER AND OBJECTIVES 1967 CHARTER The primary function of the Anniston TSD group is to improve Anniston processes to their optimum competitive position. Secondary functions include evaluation of new products to utilize idle facilities and the provision of special engineering services as required. OBJECTIVES Safety .1 Maintain a major accident frequency of 0.0. *Responsible All 12/31 2. Maintain a major accident frequency of 1.0 or less. All 12/31 5. Conduct monthly TSD safety meetings pre pared by departmental personnel. Fuhrmeister 12/31 4. Winterize safety showers by replacing with Monsanto Induction heated showers as needed. Price 9/1 5. Upgrade interlocks on critical vessels in Niran and Aroclor. . Veazey 8/1 6. Install vibration switch on small Niran cooling tower. ' Veazey 4/1 7. Design on above-ground NaCl unloading system. Faulkner 3/1 8. Study Parathion operating practices and recommend methods to minimize time spent in cubicles. Malm 5/1 9. Survey use of Haveg piping in Parathion department. Malm 5/1 10. Design and transmit design to upgrade inter locks and alarms on critical vessels in Parathion department. Veazey 6/1 Cost Improvement and Process Improvement .1 Develop Process Improvement Plan for P2S5 plant and revise all Process Improvement Plans one (1) year from date of issue. Engineers 12/31 2. Obtain $450.000 cost improvement for 1967. All 12/31 ^Estimated completion dates are for TSD design. Installation dates cannot be realistically targeted by TSD since they are controlled by Maintenance. DSW551818 STLCOPCB4090235 TSD Charter and Objectives 2 Cost Improvement and Process Improvement (continued) Responsible 3. Complete design of all cost improvement projects in the Biphenyl-Santowax Area by deadlines in the Area Long Range Plans, Taylor 12/51 4. Debottleneck the solid Aroclor System to 11.5 M lbs./yr. MacPherson 12/51 5. Increase Aroclor 1242 storage capacity by 50,000 gallons. MacPherson 5/1 6. Attain 907. actual HCl recovery Taylor 12/51 7. Monitor Chlorine department mercury usage by quarterly inventories by radioactive means. Faulkner (quarterly) 8. Develop necessary work to attain mercury usage of 0.6 #/Ton Cl2. Faulkner 9/1 9. Develop program to recover mercury from soil beneath cell room floor. Faulkner 4/1 10. Attain 24 M lbs./yr. rate at PNP. Taylor 12/51 11. Co-ordinate development of a Parathion pilot plant program. Malm 12/51 12. EVOP parathion condensation reaction. Malm 7/50 !3. Evaluate best approach to improving condensa tion yields. Malm 12/1 14. Develop program for sulfur recovery from residue. Malm 12/51 15. Debottleneck parathion production to 50 M lbs./yr. Malm a) Ethyl parathion (program to debottle necking) . 2/28 b) Methyl parathion (program to debottle necking) . 16. Prepare 1967 objectives for new PgSg plant. Malm 6/51 6/1 17. Maintain technical effort of 55% on process improvements. Fuhrmeister I2/5I DSW 551819 STLCOPCB4090236 TSD Charter and Objectives -3 " C. Quality Control and Process Surveillance 1. Improve operating log sheets in Aroclor Solids and Liquids to reflect improved control technology. 2. Institute a revised quality reporting system to reduce the log in summarizing quality status to production departments. 3. Develop and revise as necessary operating log charts for the P^^ department. 4. Evaluate the possibility of electronic logging of plant data. 5. Review conformity of all raw materials to established specifications. 6. Improve the system for retention of plant operating data. 7. Conduct a factorial analysis and principal components study on Aroclor 1242 to reveal those components promoting high quality. 8. Complete the projects assigned to Anniston as per the divisional Aroclor Quality Program. Responsible Dunlap Dunlap Dunlap Dunlap Dunlap Dunlap Dunlap MacPherson 4/1 6/1 1/15 12/31 8/1 10/1 6/15 12/31 Function , 1. Update all plant maps and maintain current 2. Photograph all drawings for disaster security reasons. 3. Install equipment to permit in-plant photo drafting. 4. Update TSD Guidelines Manual 5. Review all open jobs quarterly and re-establish priorities as necessary. 6. Review program progress and plans for all areas with concerned Management, Research, and Engineering personnel at least 4 times/year. 7. Review TSD work progress and plans with Production at least once each month. Price Price 12/1 8/1 Price 9/1 Malm 5/1 MacPherson Faulkner Taylor Malm Price Ouarterl; Fuhrmeister Quarterly & Engineers Fuhrmeister 12/31 & Engineers DSW 551820 STLCOPCB4090237 TSD Charter and Objectives -4 - Personnel Recruiting and Development Responsible 1. Hire at least 50% of all qualified personnel to whom offers are made. Fuhrmeister 12/51 2. Hold at least one seminar on advance ment routes for engineers of Monsanto and qualifications necessary for each position (obtain suitably qualified person). Taylor 12/51 3- Revise familiarization program guidelines for new and transferred engineers. Faulkner 4/1 4. Conduct bimonthly training sessions on the following selected subjects: Malm & Taylor 12/51 a) The function and how to use Monsanto specialists. b) Cost Reduction Estimating - calculation and categories. c) The function and how to use Monsanto research facilities. d) Engineering planning for better efficiency. e) The function and how to use Monsanto Process Engineering Departments. f) Capital Cost Estimating. 5. Have two Monsanto specialists hold seminars in their areas of specialty. MacPherson 12/51 6. Continue efforts to establish a program for advanced degrees in the area of Industrial Management. Fuhrmeister 12/51 7. Develop personal development goals for each department member and review quarterly. Engineers 12/51 8. Continue to provide liaison for technical recruiting with the major technical institu tions in this area. Taylor Faulkner MacPherson 12/51 9. Instruct draftsmen on two (2) of the following: a) Structural steel design Price 11/1 b) Instrument drafting Veazey 11/1 c) Reinforced concrete design DSW 551821 STLCOPCB4090238 TSD Charter and Objectives -5- Responsible 9. Instruct draftsmen on two (2) of the following: (continued) d) Electrical drafting e) Pump selection 10. Continue development of technical personnel through short courses. Fuhrmeister 12/3I F. Pollution and Community Relations 1. Develop a comprehensive plant pollution abatement plan. 2. Establish liaison with governmental agencies concerned with pollution abatement. 5. Develop a reporting system for community pollution complaints. 4. Upgrade and expand plant effluent (air and stream) monitoring systems. 5. Maintain liaison with Dr. Ferguson on water pollution matters. 6. Publish a newspaper article to further community understanding of pollution abate ment problems. 7. Develop a program to reduce COD loading to the Waste Treatment facilities by 25%. 8. Develop a program to reduce mercury content in the plant effluent. 9. Coordinate program to evaluate S02 recovery unit. 10. Participate in local civic organizations and civic projects (Science Fair, Junior Achievement, etc.). 11. Install fume collection system in the Parathion Department. 12. Install wind monitoring device to determine direction and velocity to facilitate air pollution analyses. Coley Coley Coley Coley Coley Coley Malm Taylor Coley Faulkner Malm Fuhrmeister Malm Coley 4/1 12/31 6/1 7/1 12/31 10/1 12/31 12/31 7/1 12/31 12/31 4/1 DSW 551822 STLCOPCB4090239 TSD Charter and Objectives - 6- Responsible 13. Complete start-up and check-out of waste treatment lagoon. Coley 14. Complete a study to reduce solids loading in pj.ant Coley effluent from Haste Treatment Plant. 15. Improve operation of front limestone pit to meet anticipated government standards. Coley 2/1 5/1 12/51 /kd 12/22/66 | DSW 551823 i> . f. i- STLCOPCB4090240