Document QX2z6VjrV47zEYNj9wExQQn18
FROM J. J LA CLAIR PROCUREMENT DEPARTMENT
PLAINTIFF'S EXHIBIT
AL-96
T. J. HORMUT E. B. PARKER K. ROLAN
1988 DECEMBER 06
RE: ASBESTOS PROJECT PROCEDURES
As a result of our meeting on 12/5/88, the captioned procedures have been summarized and are attached.
--
J. J. La Clair Staff Buyer JJL:gl Attachment
0 ALCOA
ARD 003953
if-4sn (ncv n *)
88DEC05
ASBESTOS PROJECT PROCEDURES
1) Notification to E. B. Parker prior to any and all asbestos removal projects.
2) Pre-job review of test/safety procedures and requirements recommended by Contractor in accordance with Alcoa Asbestos Removal Standard 18.18 latest revision and all Federal State and Local rules and regulations included but not limited to: air sampling (contractor or independent) enclosures blowers vacuum/hand tool clean-up personal protective equipment
3) Written summation of contractor test/safety procedures to be utilized.
4) Post job documentation requirements pre-post job contractor employee medical test results air sampling results quantities of asbestos disposed two (2) copies of documentation required within fourteen (14) days after work is complete
ARD 003954