'ert;a.22d U.itu 10/7/UJ Cor| orate Industrial Hygiene Kecuiuondution Status Koiort To 0. II. Kittilstad t'lOIII D. R. Hall/cv tOCillK'M .11)1 j Hl.lll l< 1120/4 Location anil m, i\ Per your August 12, 1983; attached are Corporate Industrial Hygiene reconmendations updates for the following P&PG and VBPD plant locations: ML Hillsboro, TO .Riverside, CA ^ Cameron Park, CA Eads, TO McPherson Pipe, Blend and Vinyl, KS McPherson Fab/I.M., KS Social Circle, GA Waco, TO Polymer Lake Charles, LA VBPD Hagerstcwn, MD This report has been compiled from information presently on file and/or direct communications with plant personnel. The next update will be forwarded to you by December 31, 1983. Should you have any questions, contact me. Attachments I j | i i r i CTD016412 HILLSBORO A/C PTPI2 PLANT Recommendations F/u IHS, 5/80 IHS, 11/80 IHS, 1/81 IHS, 10/81 IHS, 1/82 IHS, 6/82 1. A slitted curtain should be added to the bag opener, where the bags enter the opener on the conveyor. (IHS 80-17, 11/80) Status: Curtain installed. (6/82) Status: There was no curtain. The curtain should be installed to help contain fiber should a mech anical problem develop on the ventilation system, whereby reducing the negative pressure. (IHS 82-16, 6/82) Recommendation revised in IHS 82-16, 6/82. Status: Curtain reinstalled, then removed. Because of air movement design velocity, installation of curtain causes vacuum to increase which in turn causes empty bags to be drawn upward. If the employee is quick enough, he can open the bag opener and manually push the bag down into the . bag removal area. If not quick enough, the higher vacuum caused by the curtain's installation draws the bags up into the ductwork plugging the line, shutting off all air flow. The bag opener and air system must then be shut down and cleared. The design of the bag opener and air movement system did not include a curtain, thus the system was balanced without it. The problems caused by curtain installation actually cause higher potential exposure to the employee as the system must be cleared with the system off. The plant has no recorded high readings at the opening when the system is used as designed, without a curtain. Considered complete. (10/83, DRH) 2. All latches on the bag opener should be repaired and used by the mixer operator. (IHS 80-17, 11/80) Status: Latches installed and used. (6/82, DRH) CTD016413 1!Jl.l.ni'OKO A/C PIPE PLANT Recommendations F/u page 2 Status: The latches arc in need of repair. These should be repaired to help contain fiber should a mech anical problem develop in the ventilation system, whereby reducing the negative pressure. (Ills 8216, 6/82) Recommendation revised in IHS 82-16, 6/82. Status: Latches repaired and in use. Considered complete. (10/83, DRH) 3. Air silencers should be installed at the lathe lines. (IHS 80-17, 11/80) Status: Project being worked on. (6/82, DRH) Status: Incomplete. (IHS 82-16, 6/82) Status: Sound screen R Pneumatic silencers. Lord Corp., Erie, PA, being purchased and installed on all air exhausts. (10/83, DRH) 4. A wall made of sound absorbant materials should be installed between #1 and #2 Boring Mill and/or an application of sound absorbing foam inside each mill. (IHS 80-17, 11/80) Status: Project being worked on. (6/82, DRH) Status: On April 5, 1982, a wall of styrofoam was temporarily installed, which reduced noise level by ldB. The plant removed the wall. Although the noise level was only reduced by 1 dB, when installed, any reduction no matter how minor could be significant when the other equipment is also reduced by a small amount. The overall reduction could be substantial. A greater dB reduction could be obtained by increasing the height and size of the wall/barrier, and placing it on three sides of the mills instead of just between them. (IHS 82-16, 6/82) Status: Assigned to engineering for design, cost, etc. (10/83, DRH) CTD016414 HILLSBORO A/C I'lIM-l PLANT Recommendations I'/u page 3 5. A sound absorbent panel should be added to the Rework Saw Handle. This should be done to the Large Rework Saw if it is not replaced in the near future. (IHS 80-17, 11/80) Status: Not completed- Area designated as required hearing protection area; all personnel provided with and wear protectors. (6/82, DRH) Status: The entire Finishing Department has been designated and posted as a required hearing protection area. All the employees in the department were so pro tected. This is protecting the employee, but can only be used as a temporary measure. According to OSHA, everything feasible must be done to reduce noise levels by engineering or administrative means. Those attempts should be documented. If the efforts fail, only then is it permitted to substitute hearing protection as a solution. (IHS 82-16, 6/82) ..Status: Assigned to engineering for design, cost, etc. (10/83, DRH) 6. A sound absorbant foam should be applied to non-wearing surfaces at the Crusher including the hood at the entrance to the Crusher. (IHS 80-17, 11/80) Status: Under study. (6/82, DRH) Status: The Crusher Operator is required to wear hearing protection, although no notable reduction in the noise level has been made since the 1980 survey. (IHS 82-16, 6/82) Status: Assigned to engineering for design, cost, etc. (10/83, DRH) 7. An installation of sound absorbant barrier walls or curtains should be made throughout the Finishing/Fittings area. (IHS 80-17, 11/80) Status: Under study. (6/82, DRH) Status: The Finishing/Fittings area has been designated and posted as required hearing protection area with 100% participation by employees. An outside con sultant, Lasgow Varga of Barts, Inc., visited the plant in April, 1982, and made some informal suggestions for noise reduction. No notable noise reductions have been made. (IHS 82-16, 6/82) CTD016415 illl.I.r.HOKO A/C riPK l'LANT Uocoinmc!nda t ions !'/u page 4 Status: Will be installing sound screen R pneumatic silencers on air exhausts to lower area noise. (10/83, DRII) 8. All brooms in all areas of the plant should be eliminated and alternate methods such as oilmops, vacuums and any wetmethod should be used for cleanup. (IHS 80-17, 11/80) Status: Oil mops and vacuums used for cleanup of dust and fiber. (6/82, DRH) Status: Dry brooms were observed being used for cleanup in the Manufacturing Department. (IHS 82-16, 6/82) Status: Department heads reminded not to use dry brooms. Considered complete. (10/83, DRH) 9. An engineering feasibility study should be made in the Finish ing/Fittings Department to determine if engineering controls can be a cost effective benefit to the employees and to the plant. (IHS 82-3, 1/82) Status: Control of what? Please specify. (6/82, DRH) Status: Taken firom the Industrial Hygiene Survey of January 11, 1982 for noise/ audiodosimetry. An outside consultant, Lasgow Varga of Barts, Inc. visited the plant in April, 1982, and made some informal suggestions for noise reduction. No notable noise reductions have been made. (IHS 82-16, 6/82) Status: Will be installing soundscreen R pneumatic silencers on air exhaust to lower area noise. (10/83, DRH) 10. For accuracy in recordkeeping the plant's sampling data sheets be annotated as to whether closed or openface filters were used. Further, openface sampling should be done in the future as called for in P&CAM 239. (IHS 82-16, 6/82) Status: Complied 8/25/82. Openface samples taken since. Considered complete. (10/83, DRH) CTD016416 HILLSBORO A/C Pin: PLANT Recommendations I'/u page 5 11. A written respirator program be established. (IHS 82-16, 6/82) Status: Plant has had a written respirator program since 7/2/79. Ijt was not asked to be seen. Considered complete. Cl0/83 DRI1) 12 A qualitative respirator fit test be made at least annually on each employee. (IHS 82-16, 6/82) Status: 3MFT02 Fit Test Kit purchased 9/82. Qualitative testing to be conducted annually at same time as annual audiometric testing. Considered complete. (10/83, DRH) 13. Noise abatement efforts be increased and all efforts documented. (IHS 82-16, 6/82) Status: As noted above (3, 4, 5, 6, 7, 9), steps are being taken. Furthermore, 12/1/82, all employees viewed slidecassette program "Sound Advice". 10/82 B. Haigh attended Safety Association workshop "Sound Control and Hearing Conservation". Considered complete. (10/83, DRH) CTD016417 5! .......................... 2UVEV NUR8ER=82-03 -- OS' ERRLQYEE H(SE JOB 'ssr:oN J08.3RP SPP LOCATION DEPT SOCIAL SAR'LER 2N SR'L SECURITY SRPL START STt NURBER N3R *GUP 323 -0D=:t!E2, S!10N "ATE'IAl 'ANDLER 4CR. ALEE'T I'f'REC'CR .:?E `2 ,cc-wccl;hd, TEN ;:ni3h:ye su'evecr -:L3V4. IG^-.ru:,,. LLO'O 3l?INE "! LI 42 ::iip..::-"2 " rr.rr 5:9 ;03'0N. ARPNE? =R `.i.T'-E 2-A,. -SON 3e!VEP. 340 4i=;r NiCINIST e^ # 2":ciiE. =:cha?d 'o=<l:p' DRIVER *#RD` SI-STAlA. '< TRUCK 3?: vE'-CEKE1-' OILJADE? :-B DBA TW rT etgp stop WQPC $T, ?*:M JOUR KIN FQT l; SHIFT sac-11 ; 320::: PPS 320111 P'S 32:111 P'3 S2C11! pss 3:./ 3P6 3201:1 PS 32011! PP3 320111 p?6 220!:' OP5 12 3SRHE HOUR RETHG3 SHIFT -ILlSBORO "ILL3B0RD HiLLSBGPD "ILLSBORO HILLSBORO HILL330RC HILlSBORO HILLSBORO HlLLSBGRO HILLSBORO RE"3 RJN ! PJN 3 :v 3 PIN e $ 3 : 3 =:<i > " 3 3 5:n 3 ?J\ ; 3 } =;n ? 'Em STRT '< S'P *** 1rTLR!N 533 2 '4 37 '4.0 534 3 !4 57 41.? 333 10 !5 0 '1.0 536 3 14 5? 3S.~ 53* :l 14 53 ?0.5 533 13 15 0 8.? 533 o 57 33.2 540 25 15 21 23.3 "1 22 i 7 15 17 94.1 13 45 34.2 OSS PERI N 1ST N 1ST 4 :3T N 1ST N N 1ST M 1ST 1ST N 1ST 1ST t)Hp 35 35 30 93 30 03 35 85 35 95 115 LEO INDICATED 1 15 LED INDICATED UQUR.SP 5-2 34" 355 545 997 332 330 400 350 548 99? 351 55! 3?8 347 333 400 347 540 997 357 545 921 354 54c 917 . 355 5*7 945 389 MGUP ST RIN.SP RIN.ST 533 EXCEEDS 3-HOUR PEL 190DBA! PROTECTION HAHDATORv 534 EXCEEDS 3-HOUR PEL -40DBAI PROTECTIGN RANDATORY 535 EXCEEDS E-HOUR PEL (40DBA1 PROTECTION RANDATORY 534 EXCEEDS 8-HCUR PEL -.'ODBAi PROTECTION RANDATORY 537 EXCEEDS 9-HOUR PEL 190DBAI PROTECTION RANDATORY 538 EXCEEDS 9-40UR ACTION LEVEL -35DBA1 9ELQU 3-HOUR PEL i'OOBA) - PROTECTION RECQHRENDED 53? EXCEEDS 3-HOUR PEL -90D8A) PROTECTION RANDATORY 540 BELOU 9-HOUR ACTION LEVEL 1350BA) HO PROTECTION NECESSARY 54! EXCEEDS 8-HOUR ACTION LEVEL (35DBA) BELOW 8-HOUR PEL (90BBA! - PROTECTION RECORRENDED 34 2 EXCEEDS 8-HOUP. AC'IQN LEVEL i95DBA) BELOW 3-HOUR PEL i'OOBA) - PROTECTION RECOHHENOED 14 14 15 14 14 15 4 15 15 15 9 57 02 ? 57 !S 9 00 10 4 39 08 9 30 11 4 00 13 9 57- 00 9 21 23 9 17 22 4 -3 17 p rin to u t CTD016418