Subject: Yearly Noise Level Survey
This report is in keeping with our yearly requirement to audit the noise level exposure of the personnel working in the Power Plant, and inform these personnel of these levels and the necessary protection to prevent health damage. The following tabulation is a list of areas in this plant and the noise level found in the inmediate area this year and last year.
Reviewing the two years, it can be seen that in some areas considerable improvement has been made. This is due mainly to the construction of concrete block walls around some of the boiler fans. It can be seen that the improvement has only been to the area around the fans but inside the walls the noise is no better than before, and sometimes is worse.
From this list of noise levels and the limit set at which no hearing loss is expected (85 dba), it can be seen that this plant has very few areas which are not above the limit. There is a continual effort to reduce these levels and several things have been done with good results. A few of these are the walls around the fans, gas lines on the boiler fronts have been lead coated and insulated, the leak on the block valve for Boiler //4 was repaired, silencers have been installed on various vents in the plant, and a concrete wall was constructed around the //I Auxiliary Control Room. Due to the high noise levels that continue to exist in this area, it is manditory that all personnel working in this block outside the control rooms, warehouse, and office areas wear hearing protection at all times.
David L. Milner Power Department
attachment
mlb
DO 099140 CONFIDENTIAL
AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY*
SOUND LEVEL SURVEY (dBA)
Location
^Auxiliary Control Room Chemical Feed Station Boiler Feed Pump 1, 2, & 3 Beneath #1 Generator Exciters Beneath #2 Generator Boiler Feed Pumps 4, 5, & 6 Air Compressors 1, 2, & 3 Beneath it2 Turbine //I - 15 kv Switchgear Room it 1 Water Intake Beneath it 1 Turbine
Tf.d. 1A 'I.D. 1A & IB -U-F.D. IB & 2A ^ I.D. 2A & 2B ' F.D. 2B F.D. 3A a-F.D. 3B Inside Wall XF.D. 3B Outside Wall
Gas Regulator 1, 2, & 3 COj Blower Make-up Pumps 1, 2, & 3 Aux. Transformer 1 & 2 Warehouse ^CMain Control Room it2 Auxiliary Control Room Boiler it5 Chemical Feed ` "F.D. 5A & 5B Inside Wall (F.D. 5A & 5B Outside Wall ^Boiler Feed Pump 7 & 8
r~ F.D. 4A Inside Wall j F.D. 4A Outside Wall
) F.D. 4B Inside Wall
(j'.D. 4B Outside Wall ^ ^it2 Air Dryers & #4 Compressor
W/5 Air Compressor Beneath it4 Turbine it2 - 15 kv Switchgear Room it2 - 2400V Switchgear Room Beneath it3 Turbine it4 Boiler Chemical Feed
2-75
80 97 99 93 96 97 96 98 96 82 84 96 98 91 103 94 101 106 105 105 94 89 85 101 84 67 67
, 93 112 112 100 111 111 114 114
94 100
92 75 88 97 95
10-
77 98 97 93 96 97 97 98 96 80 84 96 96 90 101 89 101 106 108 94 92 89 85 99 79 67 68 90 108 86 98 111 85 112 96 94 96 92 75 88 97 95
DO 099141 CONFIDENTIAL.
SOUND LEVEL SURVEY (dBA)
Location
2-75
fy2 Water Intake
"^Gas Regulators to 4 & 5 Boilers 'Scrubbers - Boilers 4 & 5
1 Make-tup Pumps 4, 5, 6, & 7
Gas Turbine //I Gas Turbine #2 Gas Turbine #3 Capacitor Station tower Fire Aisle #1 Boiler Upper Fire Aisle It 1 Boiler Lower Fire Aisle if2 Boiler Upper Fire Aisle if2 Boiler Steam Header Level //I Boiler Steam Header Level if2 Boiler Upper Level #1 Boiler Upper Level it2 Boiler Lower Fire Aisle it 3 Boiler Upper Fire Aisle if3 Boiler Steam Header Level if3 Boiler Upper Level if3 Boiler Deareators 1 & 2 Deareators 3 & 4 Lower Fire Aisle Itk Boiler Second Fire Aisle //4 Boiler Upper Fire Aisle it4 Boiler Steam Header Level it4- Boiler
Attemperator Level it4 Boiler Upper Level if4 Lower Fire Aisle if5 Boiler Second Fire Aisle 115 Boiler Third Fire Aisle if5 Boiler Upper Fire Aisle 1t5 Boiler Steam Header Level It5 Boiler Attemperator Level if5 Boiler Upper Level it5 Boiler Deareator it5 //I Turbine Deck 1t2 Turbine Deck 01 Battery Bank Spray Water Pump High Pressure Feed Water Heater Flash
Tank ^ Block 28 Gas Station
90 90 90 81 75 65 63 80 106 105 107 107 92 95 87 90 100 104 100 94 94 94 94 94 93 108 90 91 98 98 98 96 90 90 87 93 E90-W87 E89-W94 86 94
90 103
DLM:10-26-76 mlb
10-76
90 90 90 81 75 65 63 80 106 102 107 104 92 92 87 90 102 104 95 90 94 94 94 93 92 84 90 85 98 98 98 96 90 90 85 93 E9C-W87 E89-W92 86 97