Document QJqBpYJayD47LyK8gqXy9nn96
Date of Inspection: September 1998
VCM BLEEDER VALVE INSPECTION
Quarter of Inspection: 3rd Quarter.
IAIO
2 O
Area / Location
OM OM OM OM
P&ID#
90108 90108 90109A 90113 90114 90134
1
!
Description
Recovery Knock Out Drums Recovery Knock Out Drums
Recover Comp. 506/111 Emission Recovery System Emission Recovery System Dump Pumps and Strainers
Bleeder Valve/
Plug # 5 BV 10 BV
1 BV
3 BV 13 BV
Comments
Needs plugged Needs plugged Needs plugged llegal Hose Connection Needs plugged Flange needs tightened
Checked and Corrected BAS
BAS
BAS BAS BAS
ABD00079887
CO <CO
>CD o
c
o
c
3
a
TJ C (0
c
<D
oCQoto>.
a>_
a
$ (D30)
a
cm too
>
(Q
>
a> TOOJ
0)
C
Co
TJ
Coo
4oo-> w 3 <to0
3
TOJ S
z
s s (0 >-
>Q
12
o
Oh. <kV0.
0) c
fig <o ^
Document: k:\iso\14000\env\E10.xls Description: VCM Bleeder Valve Inspection
F o rm E lO Page 1 of 1
Last Revised: 11/10/98 Last Printed: 11/10/98